All authors
ashfordeOU avatar

Claude Skills by ashfordeOU

github.com/ashfordeOU
3,212 skillsA× 3,2120 installs0 views
Q2007 Customer RequirementsA

Evaluate a customer test request before a test centre commits to it, under ECSS-Q-ST-20-07C clause 5.7.2: check the request carries every content item the centre needs to quote and run it, compare each requested parameter against the facility envelope and against the schedule capacity left, and confirm the safety input the specimen demands actually arrived with it. Use when a request lands and someone has to answer whether the centre accepts it, accepts it against named actions, or declines. ...

ai-agentspython
0
2
Q2007 DocumentationA

Manage the documentation, records and data control a space test centre owes under ECSS-Q-ST-20-07 clause 5.2.1, and say whether the control in place holds. Use when a test centre's document register, record retention or test-data handling is being audited: refuse control never established, name the issues circulating with no approval behind them, catch a superseded or withdrawn issue still on the floor and a document circulating at two live issues at once, take record retention against the ce...

ai-agentspythongo
0
2
Q2007 EnvironmentA

Evaluate test-centre infrastructure suitability and work-environment control, ECSS-Q-ST-20-07C clauses 5.5.1-5.5.2. Use when a facility has to show it can hold the environment a test asks for and then that it did: check the declared capability band contains the required band for temperature, humidity, supply voltage and frequency, purge media and coolant, report the containment margin at each end, derive power-quality bands from nominal plus percentage tolerance, count monitored excursions wi...

ai-agentspythongo
0
2
Q2007 Facility DescriptionA

Maintain the facility description a space test centre owes under ECSS-Q-ST-20-07 clause 5.2.2, and say whether the register in place can be booked against. Use when a test centre's facility register is being audited or a customer request has to be placed on a facility: refuse a register never opened, name the entries declaring no capability, no environmental envelope parameter or no reference document, take the centre's declared capabilities against what the entries actually carry, flag the d...

ai-agentspythongo
0
2
Q2007 Facility Test ReportA

Produce the facility test report for one campaign under ECSS-Q-ST-20-07C clause 5.7.4.1: assemble the record of which facility, which configuration and which conditions the run was actually carried out under, confirm every mandatory section is present, identify each configuration item by its own reference, find the stretches of the campaign window the condition log left uncovered, and flag any instrument whose calibration expired before the campaign ended. Use when a facility record is being ...

ai-agentspythongo
0
2
Q2007 Hazards QuestionnaireA

Generate and grade the customer questionnaire on hazardous items and activities required by ECSS-Q-ST-20-07C Annex A: build the form from the DRD skeleton, adding the detail sections the declared hazard families pull in, then grade the returned response question by question -- an affirmed checklist entry owes its supporting attachment, an affirmed activity whose underlying item is denied is a contradiction inside one response, and the authorisation block must be signed and attributed to a rol...

ai-agentspythongo
0
2
Q2007 Lessons LearnedA

Run the lessons-learned review that closes a test campaign at a space test centre under ECSS-Q-ST-20-07C clause 5.8.3: validate each register entry against its source event, rank it by the product of recurrence, consequence and detectability, place it in a priority band, route it to the procedure, facility, instrumentation, training, interface or planning baseline that must absorb it, then grade the register at a review day on closure, overdue entries and entries captured per campaign anomaly...

ai-agentspythongo
0
2
Q2007 Management SystemA

Implement the quality and safety management system a space test centre owes under ECSS-Q-ST-20-07 clause 5.1, and say whether the one in place is doing its job. Use when a test centre is being audited or stood up and the system behind its test services has to be assessed: refuse a system never established, take the declared scope against the services actually offered, measure documented-process coverage of every service in scope, catch a process covering a scoped service without an approval o...

ai-agentspython
0
2
Q2007 MonitoringA

Monitor and measure the execution of a test campaign at a space test centre under ECSS-Q-ST-20-07C clause 5.8.1: rate every acquisition channel on its sample-rate ratio against the frequency of interest, its dropout fraction and its calibration validity; adjudicate each hold point on witness presence and named release authority; merge the logged surveillance intervals over the test window for the covered fraction and the unwatched gaps. Use when a test-centre monitoring plan, a surveillance l...

ai-agentspython
0
2
Q2007 Nc ControlA

Manage a nonconformance raised at a space test centre under ECSS-Q-ST-20-07C clause 5.8.2, inside the ECSS-Q-ST-10-09 nonconformance system: categorize the anomaly major or minor from safety effect, exceeded article limit, violated requirement or invalidated conditions; derive its reporting deadline and disposition authority; decide whether the run owes a partial or a full retest; and test the proposed disposition against the customer agreement it needs. Use when a test-centre anomaly, an ano...

ai-agentspythonrust
0
2
Q2007 OrganizationA

Define the test-centre organization ECSS-Q-ST-20-07 clause 5.3.1 asks for, and say whether the chart in place supports quality and safety management. Use when a test centre's structure is being drawn or audited: refuse a chart never defined, prove the reporting structure is one tree by catching an orphan parent, a reporting cycle and a second root, name the quality and safety functions no unit actually holds, walk each assurance holder up its reporting chain and flag one that reports through ...

ai-agentspythonaws
0
2
Q2007 PlanningA

Plan the quality and safety of a space test centre as ECSS-Q-ST-20-07 clause 5.3.2 asks, and say whether the plan in place can be run to. Use when a test centre's objectives, resourcing or management programmes are being set or audited: refuse a plan never established, name the objectives carrying no metric, no numeric target or no direction, name the ones nobody owns, take resource coverage against what the objectives require rather than against what the centre holds, find the objectives no ...

ai-agentspythonperformance
0
2
Q2007 PrinciplesA

Scope the quality and safety management of a space test centre on the principles of ECSS-Q-ST-20-07C clause 4, where assurance reaches the whole centre organization and every test service rather than the test run alone: take each centre function against both disciplines, refuse an exclusion on a core function whatever its rationale, demand a rationale and an accountable owner where an exclusion is admissible, keep subcontracted test services inside the centre's own scope, refuse an assurance ...

ai-agentspythondocumentation
0
2
Q2007 Process DesignA

Design the test process a centre will actually run, under ECSS-Q-ST-20-07C clause 5.7.3: turn a request into TSPE-level content by fixing each controlled parameter's nominal and tolerance band, checking the measurement uncertainty is small enough against that band to decide conformance, guard-banding the acceptance limits by that uncertainty, confirming every controlled parameter has an instrument whose range brackets it, and ordering the load steps with dwells and ramp rates the facility can...

ai-agentspythonexpress
0
2
Q2007 Process PlanningA

Plan the test process of a campaign under ECSS-Q-ST-20-07 clause 5.7.1 and say whether the plan can be committed to the customer. Use when activities, resources, reviews and customer interfaces have to be reconciled into one schedule rather than four: refuse a dependency graph that closes on itself, take the longest path through the activities as the campaign duration, measure the margin left against the customer milestone, load every resource against the capacity declared for it, and check t...

ai-agentspython
0
2
Q2007 Process ValidationA

Validate a designed test process and the service built on it before formal use, under ECSS-Q-ST-20-07C clause 5.7.4.2: show from replicate runs that the process returns the answer it is supposed to, by pooling the within-group spread into a repeatability figure, separating the between-operator and between-rig spread as reproducibility, estimating bias against a reference specimen of known value, combining the three into an expanded uncertainty and comparing that with the tolerance the process...

ai-agentspythongo
0
2
Q2007 Qs RepsA

Assess a test centre's quality and safety representative appointments under ECSS-Q-ST-20-07C clause 5.3.4. Use when the register has to show each representative really holds stop-test authority and direct access to management rather than a title: grade the appointment form, the authorities the role must carry, and independence from the test-execution reporting line, count the escalation hops to top management, refuse a verbal appointment as cover, and compute the authority-coverage ratio and ...

ai-agentspython
0
2
Q2007 ResponsibilityA

Allocate responsibility and authority for quality and safety items as ECSS-Q-ST-20-07 clause 5.3.3 asks, and say whether the matrix in place holds. Use when a test centre's duties, delegations or reporting lines are being set or audited: refuse a matrix never assigned, separate an item with nobody against it from an item carrying two holders, compare each holder's authority level with what the item's criticality demands, catch a delegation granting more authority than the delegator holds or c...

ai-agentspythongo
0
2
Q2007 Safety ManualA

Maintain the safety manual of a space test centre under ECSS-Q-ST-20-07C clause 5.9.3: confirm it carries the hazard inventory, controls, responsibilities, emergency plans and the working chapters that hang off them; parse and order issue.revision identifiers so a chapter ahead of the manual is caught as an uncontrolled update; grade the review currency, the hazard-register changes that postdate issue, the acknowledged fraction of controlled copies and the withdrawal of superseded ones. Use w...

ai-agentspython
0
2
Q2007 Safety PolicyA

Evaluate the documented safety policy and safety objectives of a space test centre under ECSS-Q-ST-20-07C clause 5.9.2: confirm the policy carries every required commitment, was approved at a level that binds resources, was communicated to personnel and is inside its review interval; then grade each objective as a measurable target with baseline, unit, direction, owner and due day, and score the progress and attainment actually reached. Use when a centre safety policy statement, its commitmen...

ai-agentspythongo
0
2
Q2007 Safety ProgrammeA

Audit the safety programme of a space test centre under ECSS-Q-ST-20-07C clause 5.9.1: rank each facility hazard by consequence and likelihood into a risk index and acceptance band, place its controls on the control hierarchy and refuse a severe hazard held only by a procedure, confirm the safety officer is appointed, deputised and reporting outside the test-execution line, and grade accident, incident and emergency preparedness on response plans, reporting routes and drill intervals per 5.9....

ai-agentspythongo
0
2
Q2007 SecurityA

Audit test-centre site security and access control under ECSS-Q-ST-20-07C clause 5.5.4. Use when a centre has to show who may enter which zone, who was inside it, and where the hardware and its data were left: decide each access request against zone tier, badge validity and authorised hours, treat the escort as the admitting party for a visitor, list every reason a request fails instead of the first, find visits signed in and never signed out, reconstruct zone occupancy, and flag items or dat...

ai-agentspythonrust
0
2
Q2007 Specimen HstpA

Plan and check how a test centre handles, stores, transports and preserves a customer specimen inside its own walls, under ECSS-Q-ST-20-07C clause 5.7.4.4, which carries the provisions of ECSS-Q-ST-20-08 into the centre: score the storage log against the temperature, humidity and cleanliness limits the item was accepted under, total the time spent outside them, compare the preservation expiry with the planned use day, check the transport shock and tilt monitors against what the item may take,...

ai-agentspythongo
0
2
Q2007 SpecimenA

Assess the control a test centre keeps over a customer's test item under ECSS-Q-ST-20-07C clause 5.7.4.3: work the receipt inspection, confirm the item carries a marking unique inside the centre's register, compare the as-received build against the configuration the customer declared, weigh it against the declared mass within its allowance, list the accompanying documents that did not arrive, walk the custody chain for a handover whose receiving holder does not match the next holder, and retu...

ai-agentspythongo
0
2
Q2007 Test SequenceA

Structure a test campaign plan against the typical test process sequence offered by ECSS-Q-ST-20-07C Annex B: lay the planned phases on the reference flow, report a mandatory phase that is neither planned nor omitted against a recorded tailoring rationale, name every adjacent pair that runs the flow backwards, flag a rationale left behind for a phase that is planned anyway, and lay the durations into contiguous day windows so the plan carries a schedule. Use when a campaign plan is being draf...

ai-agentspython
0
2
Q2007 Tf CalibrationA

Evaluate the calibration control of a test facility measurement chain under ECSS-Q-ST-20-07 clause 5.6.3, and say whether the chain may carry the campaign. Use when facility instrumentation has to be shown fit before a run rather than after it: refuse a chain with no calibration plan, combine the element uncertainties in quadrature, form the accuracy ratio against the tolerance the measured parameter owes, check every certificate stays valid to the last run day, and separate a certificate alr...

ai-agentspython
0
2
Q2007 Tf ConfigA

Verify that a test facility is under configuration control as ECSS-Q-ST-20-07 clause 5.6.2 asks, and say what the state of the baseline obliges the test centre to do. Use when a campaign is about to run in a facility whose hardware, software, fluid lines and fixed instrumentation have moved since the last baseline: refuse a facility never baselined, check that every configuration item carries an identification, replay the approved and applied change records from the baseline version forward, ...

ai-agentspython
0
2
Q2007 Tf DependabilityA

Compute the achieved dependability of a test facility against its availability and reliability targets, as ECSS-Q-ST-20-07 clause 5.6.6 asks. Use when facility performance has to be monitored rather than asserted between campaigns: refuse targets that are not fractions or not positive times, take the achieved availability from the operating and downtime record, derive mean time between failures and mean time to restore, form the inherent availability those two imply, compare each against its ...

ai-agentspythongo
0
2
Q2007 Tf DesignA

Design and clear a new or modified test facility for use under ECSS-Q-ST-20-07C clause 5.6.1. Use when a facility development has to prove it is finished rather than merely delivered: take the ordered review set from the change category, capture each requirement with a criticality, verification method, status and reference, refuse a safety-critical requirement closed by design review alone or waived at all, name a review closed before an earlier one, report verification coverage as a fraction...

ai-agentspythongo
0
2
Q2007 Tf MaintenanceA

Assess the maintenance control of a test facility under ECSS-Q-ST-20-07 clause 5.6.4 and say whether the facility may be released to a campaign. Use when preventive tasks and corrective work orders have to be read together before a run rather than separately after it: refuse a facility with no maintenance plan, measure every preventive task against its own interval instead of one calendar, age the open corrective work orders against their close-out allowance, and hold a facility whose complet...

ai-agentspythongo
0
2
Q2007 Tf RiskA

Assess the hazards of a test facility and the residual risk left after mitigation, as ECSS-Q-ST-20-07 clause 5.6.5 asks. Use when a safety case for a facility has to be argued before a campaign rather than asserted: refuse an assessment covering fewer hazard categories than the facility owes, take a severity and a likelihood index per hazard into a risk band, credit only the mitigations actually implemented, recompute the residual band, and require a named acceptance authority for every resid...

ai-agentspythongo
0
2
Q2008 Review DeliverablesA

Plan the storage, handling and transportation deliverables of ECSS-Q-ST-20-08C Annex E against the reviews a project actually holds: anchor each deliverable to its listed review, re-anchor it to the nearest earlier held review when the project does not run that one, step the agreed lead back in working days with weekends skipped to get a submission due day, then grade each planned submission as on time, late or unplanned and separate what blocks a schedule from what is only advisory. Use when...

ai-agentspython
0
2
Q2010 DossierA

Maintain the off-the-shelf item evaluation dossier that ECSS-Q-ST-20-10C clause 5.1.3 and its Annex B data-requirement description ask for, as an append-only record of every evaluation performed on every candidate. Use when evidence is arriving from several evaluations and somebody has to say which Annex B sections a candidate still owes and whether any finding is unresolved. Adds entries without overwriting history, supersedes only by a higher revision, refuses a conclusion with no source re...

ai-agentspython
0
2
Q2010 Equipment SpecA

Define the equipment specification an off-the-shelf candidate has to be matched against under ECSS-Q-ST-20-10C clause 5.1.2. Use when a shortlisted unit must be held against the functional, performance and interface requirements of the application before any evaluation effort is spent on it. Builds the requirement set, refuses a specification that populates no interface requirement, grades each candidate datum as met, not met or undeclared, keeps an undeclared datum out of the compliance rati...

ai-agentspythongo
0
2
Q2010 PlanA

Produce the off-the-shelf utilisation plan of ECSS-Q-ST-20-10C clause 5.1.1 against its Annex A DRD and grade the draft before it is issued: report an absent DRD section apart from one present with no content, require every listed candidate to carry an attributed evaluation, compare each evaluation completion with the day its result is needed ahead of the procurement commitment, and require each declared interface to name two distinct parties and a defined exchange. Use when the plan is being...

ai-agentspythongo
0
2
Q2010 ProcessA

Scope the off-the-shelf item utilisation process of ECSS-Q-ST-20-10C clause 4 against the project product tree: decide the stage each candidate has actually reached across market investigation, characterization and selection, and procurement and qualification, refusing to count a later stage while an earlier one is still open, add the delta qualification plan an item not already qualified for this application owes, and reconcile candidates with the tree so a candidate on a make node, a candid...

ai-agentspythongo
0
2
Q2030 Applicability TablesA

Determine which harness requirement sets apply to a given cable or harness type at a given product category using the informative applicability tables of ECSS-Q-ST-20-30C Annex A. Use when the task is refusing a table that states one address twice, grouping a pair's requirement sets into applicable, excluded and conditionally open, holding an undecided condition open instead of reading it as a yes or a no, reporting a set the table never addressed as undetermined rather than excluded, and let...

ai-agentspythongo
0
2
Q2030 Comp BranchingA

Assess a breakout in a metallic braid-shielded bundle against the complementary branching rules of ECSS-Q-ST-20-30C clause 7.7. Use when the task is computing the braid angle, filling factor and optical coverage each branch braid achieves from its construction, holding every branch to the coverage the trunk already carried rather than only to a floor, adding the trunk, junction and branch segments into one shield-continuity resistance and grading it, refusing a takeoff whose junction is not b...

ai-agentspythonexpress
0
2
Q2030 Comp CrimpingA

Verify a crimp-termination lot against the complementary crimping requirements of ECSS-Q-ST-20-30C clause 7.4, which take precedence over the delegated workmanship criteria wherever both speak. Use when the task is resolving which limit governs a crimp characteristic, grading a measured crimp height against the window the contact and wire gauge carry, sizing the tensile sample a lot owes and grading every pull against the minimum force its gauge carries, refusing a barrel holding an unqualifi...

ai-agentspythongo
0
2
Q2030 Comp Emc FoilA

Validate a conductive metal foil EMC shield against the complementary application and termination criteria of ECSS-Q-ST-20-30C clause 7.8. Use when the task is sizing the foil thickness against the skin depth of its metal at the lowest frequency the shield must work from, turning a helical wrap overlap into a pitch, a layer count over every point and the tape length the run consumes, confirming the conductive face is applied inward against the drain wire, and costing the drain-wire pigtail in...

ai-agentspythongo
0
2
Q2030 Comp GeneralA

Determine which requirement governs a harness topic under ECSS-Q-ST-20-30C sections 7.1 and 7.2. Use when the task is reconciling an IPC/WHMA-A-620 acceptance criterion with the space addendum row that modifies it and the complementary requirement that sits above both: filtering each requirement by the harness type and assurance level it applies to, ranking the surviving sources so a complementary requirement outranks an addendum row and an addendum row outranks the external basis, demoting a...

ai-agentspythongo
0
2
Q2030 Comp LabellingA

Audit harness labelling and marking against the complementary content, format and durability requirements of ECSS-Q-ST-20-30C clause 7.6. Use when the task is decomposing a label token into the fields the project format prescribes, grading each field against the character set its position carries, scaling the minimum character height to the distance the marking is read from, placing the label inside its window from the termination, requiring both ends of a wire routed through a bundle to be m...

ai-agentspythonshell
0
2
Q2030 Comp SleevingA

Evaluate the insulation sleeving applied over terminated contacts against the complementary requirements of ECSS-Q-ST-20-30C clause 7.5. Use when the task is choosing a sleeve size that will pass over the largest diameter on its assembly path and still close onto the diameter it must grip, sizing the cut length from the covered span, the overlap owed at each end and the longitudinal shrinkage, confirming the installed sleeve clears the contact retention and mating features, and deciding wheth...

ai-agentspythongo
0
2
Q2030 Comp SolderingA

Assess a soldered harness termination against the complementary requirements of ECSS-Q-ST-20-30C section 7.3, which sit on top of the IPC soldered-termination and crimp acceptance criteria. Use when the task is grading the additions a solder joint owes: alloy lead content and the whisker mitigation plan a near pure tin alloy needs, flux activation and the cleaning it obliges, iron tip temperature inside its window, a dwell and reheat budget scaled to conductor cross-section, the insulation cl...

ai-agentspythongo
0
2
Q2030 Demating LogbookA

Maintain the per-connector (de-)mating logbook of the ECSS-Q-ST-20-30 Annex B worked example: hold the entry order, refuse a demate with no mate before it, a connector mated twice or a sheet running backwards in time, count the mating cycles each connector has consumed, subtract them from its declared maximum to give the remaining-cycle countdown, and render the maximum-cycle control table with an approaching-limit band computed in integers. Use when a connector logbook is opened, an integrat...

ai-agentspython
0
2
Q2030 HvA

Compute the high-voltage provisions an electrical harness owes under ECSS-Q-ST-20-30C section 6.20 and its IPC section 20 basis. Use when the task is sizing clearance and creepage at a harness termination and grading the as-built distances: derating the breakdown gradient of air with operating pressure, refusing air as an insulator inside the Paschen minimum band unless the feature is encapsulated, taking the surface-flashover gradient below that band, scaling creepage with the insulating mat...

ai-agentspythongo
0
2
Q2030 TestingA

Audit the test programme of a manufactured electrical harness under ECSS-Q-ST-20-30C section 6.19 and its IPC section 19 acceptance basis. Use when the task is deciding which tests a harness owes and whether the recorded results support acceptance: nondestructive examination, continuity graded against a loop resistance computed from conductor length, cross-section and mated contact count, insulation resistance at its electrification time, a dielectric withstanding voltage derived from the wor...

ai-agentspythongo
0
2
Q40 02 Generic Hazard LibraryA

Map a space system onto the generic-hazard library and hazard-register examples of the ECSS-Q-ST-40-02C informative annexes. Use when the task is seeding a hazard identification from declared system characteristics - stored pressure, propellant, pyrotechnics, high voltage, ionizing or laser sources, cryogens, moving mass, crew access, safety-critical command paths - instead of starting from an empty page, ranking each seeded candidate by how strongly those characteristics call it, naming the ...

ai-agentspythongo
0
2
Q40 02 Process PrinciplesA

Define the hazard-analysis process for a space programme under ECSS-Q-40-02 and grade the definition: check the mandatory process elements are declared, that each analysis level carries a technique suited to that level rather than one borrowed from another, that the iterations are tied to the safety reviews so the analysis reaches the decisions it informs, that the documentation set leaves a hazard log traceable to requirements, and that update triggers keep it alive between reviews. Use when...

ai-agentspythongo
0
2
Q40 02 RequirementsA

Audit a space-project hazard-analysis programme against the general requirements of ECSS-Q-ST-40-02C clause 5.1. Use when the task is confirming that the analysis reaches every mission phase and every planned operation rather than the flight phases alone, that a hazard log and a hazard report duty exist with a named custodian and an agreed update interval, that the analysis techniques and supporting tools are declared before the work starts, and that the events forcing a re-analysis - design ...

ai-agentspythondocumentation
0
2