All authors
ashfordeOU avatar

Claude Skills by ashfordeOU

github.com/ashfordeOU
3,212 skillsA× 3,2120 installs0 views
Pressurized Hardware FractureA

"Use when assess pressurized hardware for fracture criticality under

ai-agentspythongo
0
2
Production And Manufacturing ControlA

"Use when verify production and manufacturing controls for structural

ai-agentspythongo
0
2
Q1009 Action ImplementationA

Implement and track the actions a nonconformance carries under ECSS-Q-ST-10-09C clause 5.4.1. Use when agreed actions need owners and due dates, when the register has to be rolled up for a review board, or when an NCR is asking to progress while actions are still running: validate each entry, refuse a state jump the register cannot justify, count what is overdue and by how much, insist on evidence before an action counts as verified, and hold the nonconformance until every binding action has ...

ai-agentspythongo
0
2
Q1009 CapaA

Define the corrective and preventive actions a nonconformance owes under ECSS-Q-ST-10-09C clause 5.3. Use when a proposed action set has to be judged against the root causes it claims to remove, when containment is being offered as the fix, or when a recurring or systemic cause needs prevention as well as correction: rank the control each action installs, check that every cause carries a corrective action stronger than added inspection, demand prevention wherever the mechanism reaches further...

ai-agentspythongo
0
2
Q1009 Causes ConsequencesA

Analyze the cause and the consequences of a nonconformance under ECSS-Q-ST-10-09 clause 5.2.2.3, so that the board disposes of it on evidence and the corrective-action call rests on something. Use when a departure has been raised and its review package still needs a cause chain and an impact scope. Walks the chain from the observed departure to a root the organisation actually controls, refuses a root naming the person present rather than the control that failed, scores every consequence dime...

ai-agentspythongo
0
2
Q1009 ClassificationA

Determine whether a raised nonconformance is minor or major under ECSS-Q-ST-10-09 clause 5.2.2.2, and whether several minor ones on a single item have quietly become a major. Use when departures have to be sorted before the review board sits, because the category decides which board may dispose of them. Answers every clause 3.2 severity criterion explicitly and treats the set as a disjunction, so one true answer is major and is never traded against the false ones; then groups the minor depart...

ai-agentspythongo
0
2
Q1009 CloseoutA

Verify that a nonconformance has met its close-out criteria under ECSS-Q-ST-10-09C clause 5.4.2 before the report is closed. Use when an NCR is proposed for closure, when the retained record set has to be checked against the route that was taken, or when closure signatures and retention are in question: confirm the granted disposition was carried out and checked, hold closure while a condition or an agreed action is unfinished, name the records a departure route additionally owes, and compute...

ai-agentspythongo
0
2
Q1009 Customer MeetingA

Coordinate the customer review board sitting on a submitted major nonconformance under ECSS-Q-ST-10-09 clauses 5.2.3.1 to 5.2.3.3. Use when a supplier's package has reached the customer and the board has to establish whether it can take a disposition at all. Separates the two ways a sitting fails: the customer functions that constitute the board, and the supplier representative without whom nothing can be confirmed. Assesses the impacts the supplier cannot see from inside its own scope, meani...

ai-agentspythongo
0
2
Q1009 DatabaseA

Maintain the nonconformance database ECSS-Q-ST-10-09 clause 5.5.2 makes a project keep, and decide whether it is doing its job. Use when nonconformances are being raised on a programme and the register behind them has to be graded before a progress review or an audit: refuse a database never opened, check each row carries its identifier, raising day, affected item, category and status, take registration coverage against the count raised rather than the rows held, catch a status that moved bac...

ai-agentspythongo
0
2
Q1009 Internal MeetingA

Run the internal nonconformance review board sitting of ECSS-Q-ST-10-09 clause 5.2.2.1. Use when a supplier convenes its own board on internally raised nonconformances and the sitting, its agenda and its minutes all have to stand up to later scrutiny. Judges the roster against the mandatory board functions and against the voting quorum separately, because one shortfall is repaired by a delegate and the other by a reconvene; admits an agenda item only once its review package is complete, defer...

ai-agentspython
0
2
Q1009 Major DispositionA

Determine the disposition a major nonconformance may be granted at the customer nonconformance review board under ECSS-Q-ST-10-09C clause 5.2.3.4. Use when a major NCR needs a use-as-is, rework, repair, scrap or return-to-supplier decision, when a departure left in delivered hardware has to be recorded as a concession, or when the board's quorum is in doubt: assess every disposition against safety, interface and lifetime impact, attach conditions that carry an owner and a means of verificatio...

ai-agentspython
0
2
Q1009 Major EscalationA

Prepare a major nonconformance for submission to the customer review board under ECSS-Q-ST-10-09 clause 5.2.2.5, which the supplier may never dispose of on its own authority. Use when a departure has been categorized major and its analysis package has to leave the supplier inside the agreed window. Checks the report reference against the programme identifier pattern so the customer can track it to closure, tests the package against the larger set a deciding board needs rather than an informed...

ai-agentspythongo
0
2
Q1009 Minor DispositionA

Evaluate a proposed disposition for a minor nonconformance under ECSS-Q-ST-10-09 clause 5.2.2.4 before the supplier board signs it off. Use when a minor departure has been categorized and somebody has written rework, repair, use-as-is, return to supplier or scrap against it. Tests three things that fail independently of each other: whether the item can physically carry that disposition at all, whether the supplier board may authorize it or the case rises to the customer board on a permanent d...

ai-agentspythongo
0
2
Q1009 Ncr DrdA

Generate or validate a nonconformance report against the normative data item of ECSS-Q-ST-10-09 Annex A. Use when a nonconformance has been raised on a deliverable item and the report has to be graded before it goes to a review board or is closed out: grade it at the stage it has actually reached rather than against the closure blocks, add the content the proposed disposition path carries, whether acceptance justification, repair requalification, reinspection, scrap authorisation or supplier ...

ai-agentspythongo
0
2
Q1009 Ncr FormatsA

Validate a nonconformance report against the programme's format and content fields under ECSS-Q-ST-10-09C clause 5.5.1. Use when reports are being raised on inconsistent forms, when a status code or a disposition field has to be checked against the rest of the record, or when an audit needs the missing fields named: check every field against its kind, derive the conditional duties a departure disposition or a closed status creates, refuse a status code that moves backwards, and report complet...

ai-agentspythongo
0
2
Q1009 Records AnalysisA

Analyze the nonconformance records periodically as ECSS-Q-ST-10-09 clause 5.5.3 asks, and say what the result obliges the project to do. Use when a reporting milestone falls due and the records collected so far have to be turned into trends, recurring causes and indicators feeding product assurance reporting and corrective action: refuse a study never run or gone stale, normalise every period by the exposure it carries, take the least-squares slope over the normalised rates rather than the en...

ai-agentspythongo
0
2
Q1009 Status List DrdA

Validate or produce the NCR status list required by the normative data item of ECSS-Q-ST-10-09 Annex B. Use when a progress meeting or an audit needs the open and closed nonconformance reports as one register at a stated date: reconcile the list against the nonconformances the database holds rather than against itself, name the registered reports it omits and the rows the register cannot trace, catch a row closed with no disposition or closure day and an open row carrying one, group the count...

ai-agentspythongo
0
2
Q1009 TemplateA

Evaluate a candidate nonconformance report form against the informative template of ECSS-Q-ST-10-09 Annex C, whose headings and fields follow the normative Annex A data item. Use when a project is adopting or reviewing its default NCR form: refuse a form carrying no section for a content group the data item fixes, weigh field coverage as the mean over the groups rather than a count of fields found, measure a re-sequenced form as an inversion share against the annex order, record local additio...

ai-agentspython
0
2
Q1009 Waiver DeviationA

Prepare and route a deviation or waiver request against an agreed requirement under ECSS-Q-ST-10-09C clause 5.2.3.5 and the M-ST-40 configuration rules. Use when a departure has to be authorised before build or accepted after the fact, when the request package is short of fields, or when affected items risk being used before approval: derive deviation against waiver from whether the departure already exists, complete the configuration record and its impact headings, route the signature to the...

ai-agentspythongo
0
2
Q20 Acceptance ProcessA

Execute the acceptance and delivery decision of ECSS-Q-ST-20C clause 5.7.1 from the evidence rather than from the delivery date: grade the verification register so a requirement called verified carries evidence and anything short of verified rests on an approved, attributed deviation or waiver, block on an open critical nonconformance and on lesser ones whose disposition is unapproved, check every mandatory acceptance hold point is signed by the party that owns it, and return accept, conditio...

ai-agentspython
0
2
Q20 Coc DrdA

Prepare and assess the certificate of conformity of ECSS-Q-ST-20C Annex D against its document requirements description: validate the identification and signature fields the DRD names, refuse a certificate asserting full conformity while enumerating deviations or qualifying its conformity with none listed, resolve every evidence reference against the delivered evidence register, report the coverage, and reject a signature held by a function inside the organisation that built the item or dated...

ai-agentspython
0
2
Q20 Coc ExampleA

Draft and grade a certificate of conformity against the worked example of ECSS-Q-ST-20C Annex H, taken as the standard sheet format: hold the printed block order, name every mandatory block left blank as one finding, parse each serial range into a prefix, a first and a last serial at one padded width, refuse a mixed prefix or a backwards range, report two ranges covering the same serial, reconcile the serials covered with the declared quantity, rebuild the certificate number from the contract...

ai-agentspythonrust
0
2
Q20 DeliveryA

Manage the delivery of a consignment under ECSS-Q-ST-20C clause 5.7.5: derive the shipping control documents the consignment owes from its own states rather than from a standing list, read the transport monitoring record for excursions outside each declared environmental limit, treat the unmonitored part of a journey as unknown instead of compliant, reconcile the identification on the certificate of conformity with the consignment it covers, and decide whether that certificate may be issued a...

ai-agentspythongo
0
2
Q20 DrbA

Run the delivery review board that decides whether a finished item may leave, under ECSS-Q-ST-20C clause 5.7.3: test the roster for the functions that must sit on it and for the independence the quality seat needs, name the end-item data package documents the board was never given, take every open nonconformance and every waiver to its own disposition instead of one verdict, and return deliver, deliver-with-reservation or hold with the minute fields the record owes. Use when a board has to co...

ai-agentspython
0
2
Q20 Eidp ContentA

Build and grade the end item data package of ECSS-Q-ST-20C clause 5.7.2 and its Annex B document requirements description: resolve the record list the product type actually owes rather than reusing a neighbouring delivery's index, mark each required record present and approved at a stated revision, validly declared not applicable with a justification and an approver, or missing, refuse a not-applicable declaration on a core conformity record, and confirm the certificate of conformity points a...

ai-agentspythongit
0
2
Q20 Eidp DrdA

Structure and assess the end item data package of ECSS-Q-ST-20C Annex B against its document requirements description: emit the numbered table of contents the DRD fixes, group every submitted document under the design, manufacturing, test or acceptance data it belongs to, raise a document filed under the wrong category as its own finding, name what each category is short of, list an unrecognised document as an extra instead of failing on it, and return the per-category and whole-package compl...

ai-agentspythongo
0
2
Q20 Eidp Example ContentsA

Structure and grade the contents list of an end item data package against the worked example of ECSS-Q-ST-20C Annex G, taken as the house document-set checklist: hold the numbered section order the example fixes, file each document under the section its kind belongs to rather than where the compiler put it, demand a document number, an issue and a page count on every ticked line, run the page ranges on from the first sheet with no gap or overlap, check a tabbed page against the running count,...

ai-agentspythonrust
0
2
Q20 Eidp Example CoverA

Prepare and assess the end item data package cover page of ECSS-Q-ST-20C Annex F, used as the house header format for the Annex B package: hold the field order the worked example fixes, refuse a blank mandatory field or a non-positive issue and document count, rebuild the package number from the contract and serial number, check the three-signature approval block for one person holding two roles or signatures taken out of order or after the cover issue, and reconcile the declared document cou...

ai-agentspythonrust
0
2
Q20 Gse AcceptanceA

Evaluate the acceptance of ground support equipment under ECSS-Q-ST-20C clause 5.8.4.2: grade each acceptance result against the agreed GSE requirement it answers, keep the measured margin rather than only the verdict, refuse a reported pass whose own measurement misses the bound, insist that a safety-critical requirement be shown by test or inspection instead of argued on paper, compute acceptance coverage over the requirement set, and separate a failure carried on an approved waiver from on...

ai-agentspython
0
2
Q20 Gse ConfigA

Maintain configuration control over ground support equipment under ECSS-Q-ST-20C clause 5.8.2: assess whether each GSE item is identified well enough to be controlled as one unit, hold the set as a baseline, replay the change log against that baseline in order so an unapproved, out-of-sequence or version-jumping change is refused and named rather than silently absorbed, then compare the as-built result with the configuration the equipment is declared to be at. Use when GSE has drifted from it...

ai-agentspython
0
2
Q20 Gse DeliveryA

Coordinate the delivery review and the handover of ground support equipment under ECSS-Q-ST-20C clauses 5.8.4.3 and 5.8.4.4: check that the board had the functions it needed and a chair independent of the work under review, confirm the agenda covered every subject it owes, let the open action list decide hold, reserve or deliver, derive the conformity certificates the item's own states demand, test each one against the delivery day so an expired or not-yet-issued certificate is caught, and re...

ai-agentspythongo
0
2
Q20 Gse DesignA

Audit the design, development and verification of ground support equipment under ECSS-Q-ST-20C clause 5.8.1: trace each GSE requirement up to a source requirement that actually exists and down to a verification record, compare the method a record used with the method the requirement planned, refuse a paper closure on a requirement that protects flight hardware or people, compute the closure coverage of the set, and return approved, approved-with-actions or not-approved. Use when a GSE design ...

ai-agentspythongo
0
2
Q20 Gse EidpA

Produce the end item data package a delivered piece of ground support equipment owes under ECSS-Q-ST-20C clause 5.8.4.1: derive the package sections from the item's own states instead of a standing table, refuse a section still in draft or marked approved with nobody behind it, force every open nonconformance into the package the receiving side accepts the item with, compute the approved fraction of the required set and decide whether the package may be released. Use when GSE is about to chan...

ai-agentspython
0
2
Q20 Gse GeneralA

Audit the general quality assurance requirements that follow ground support equipment under ECSS-Q-ST-20C clause 5.8.8: test each identification mark against the marking scheme, catch a mark repeated across the register and a mark on the item that disagrees with the register entry, derive the record set the item's category and states demand, size the record retention shortfall in years against service life plus margin, and name every handling provision a safety-critical item owes at its point...

ai-agentspythongo
0
2
Q20 Gse MaintenanceA

Maintain ground support equipment under ECSS-Q-ST-20C clause 5.8.9: measure each planned task against its own clock, calendar days or operating hours, report how much of every interval has been consumed and by how much a task has run past it, treat a task landing exactly on its interval as due rather than late, derive the reverification an intervention owes from the part it touched, name every recalibration or inspection still outstanding before the equipment goes back to work, and return the...

ai-agentspythongo
0
2
Q20 Gse ProductionA

Evaluate the production of a ground support equipment item under ECSS-Q-ST-20C clause 5.8.3: grade each bought-in lot on supplier approval state, incoming inspection, conformity evidence and lot traceability, apply the surveillance a conditionally approved supplier owes, replay the manufacturing, assembly and integration operations in sequence against process qualification and operator certification validity, check every mandatory inspection point for completion and the right witness, and ret...

ai-agentspythongo
0
2
Q20 Logbook DrdA

Maintain and assess the unit logbook of ECSS-Q-ST-20C Annex C against its document requirements description: validate each history, inspection, modification and environmental entry against the fields its type owes, check the numbering for a gap or a repeat, refuse a date that runs backwards down the sequence, trace the configuration through the modification chain so each one starts where the last left off, flag an environmental excursion or a failed inspection carrying no nonconformance refer...

ai-agentspythonrust
0
2
Q20 Logbook ExampleA

Prepare and assess the logbook cover page of ECSS-Q-ST-20C Annex E, used as the house record header for the Annex C content: hold the field order the worked example fixes, refuse a blank mandatory field, a non-positive issue, a period running backwards or a sheet numbered past its own total, render the header with labels aligned to one column, compute the sheets the entry count needs at the book's ruling, and cross-check the cover serial, period and sheet total against the entries it heads. U...

ai-agentspythonrust
0
2
Q20 Prep For DeliveryA

Prepare a finished item for delivery under ECSS-Q-ST-20C clause 5.7.4: size the cushioning from the declared drop height and the fragility level, check the bearing stress the item puts on that cushion against the window the material is rated over, size the desiccant charge from barrier area, vapour transmission and storage duration, then derive the label fields and the protection means the item's own states make mandatory and name every one the prepared package does not carry. Use when a pack...

ai-agentspython
0
2
Q20 PretailoringA

Derive the tailored clause 5 requirement set from the ECSS-Q-ST-20C clause 6 pre-tailoring matrix for one space product type: refuse a matrix row that says nothing about a product type or calls a requirement modified without stating the modification, keep each surviving requirement with its disposition, name every requirement the matrix does not cover, reconcile the project's own proposal against the baseline so a relaxation needs an approved justification while a tightening does not, and rep...

ai-agentspython
0
2
Q20 Qa DeliverablesA

Plan and audit the quality assurance documents a project owes at each review from the mapping table of ECSS-Q-ST-20C Annex I: resolve the rows the declared scope actually turns on, separate a document reissued at every review in its window from one delivered twice, hold the maturity each review owes on the draft, issued and approved ladder, measure a submission against its lead time in days before the review date, score the review as the satisfied fraction of what it owed, and walk the sequen...

ai-agentspython
0
2
Q20 Qap DrdA

Generate and assess the quality assurance plan of ECSS-Q-ST-20C Annex A against its document requirements description: build the numbered DRD outline the contract level owes, decide whether each section carries the subjects the DRD names, confirm the organisation section states a quality function independent of the line that builds the product, reconcile the task provisions with the level's set, resolve every procedure the plan cites against its own reference list, and refuse a tailoring decl...

ai-agentspythongo
0
2
Q20 Test EquipmentA

Verify that the equipment a test is about to be run with satisfies the quality assurance control ECSS-Q-ST-20 clause 5.6.2 places on it, electrical ground support equipment included. Use when a test readiness review or a set-up check falls due: judge calibration at the day of use rather than the day of the audit, refuse a due day contradicting the calibration interval, weigh the uncertainty carried against the tolerance being judged as an accuracy ratio, keep a guard band at each end of the i...

ai-agentspythonrust
0
2
Q20 Test MonitoringA

Monitor the quality surveillance of a test while it runs, under ECSS-Q-ST-20C clause 5.6.4: derive which timeline steps demand a product-assurance presence and which add the customer, compare that demand with the attendance record end to end rather than by sampling, grade each mandatory hold point for release by its owning authority and for a following step that started before the release, and check every anomaly was logged, attributable to a step window and witnessed by the roles that owed p...

ai-agentspythonrust
0
2
Q20 Test ProceduresA

Audit the quality-assurance control of a test procedure set under ECSS-Q-ST-20C clause 5.6.3.1: confirm each procedure carries its engineering and product-assurance approvals, signed no later than issue, that every specification requirement is exercised by a step and no step cites a requirement the specification does not hold, that the procedure quotes the specification revision actually in force rather than a stale or unreleased one, and that a revision advance is backed by an approved chang...

ai-agentspythongo
0
2
Q20 Test ReportsA

Evaluate a test report against the quality-assurance content and approval rules of ECSS-Q-ST-20C clause 5.6.3.2: check the mandatory sections are present, that every parameter the procedure demanded carries a finite measured value in the demanded unit or a justified not-measured declaration, grade each value against its limits with a value sitting on a limit counted inside, confirm every anomaly seen during the run was written up with a nonconformance reference and a disposition, and refuse a...

ai-agentspythongo
0
2
Q20 Test ReviewsA

Perform the readiness and post-test reviews of ECSS-Q-ST-20C clause 5.6.5 as graded decisions rather than meetings: grade each review against the criterion list its own kind owns, refuse a waiver on a criterion that kind holds mandatory and demand a reference and an approver on the waivers it does allow, check the chair and product assurance were present with minutes referenced and no blocking action left open, and check a readiness review closed before the test started and a post-test review...

ai-agentspythongo
0
2
Q2007 Campaign SafetyA

Manage the safety of a test campaign under ECSS-Q-ST-20-07C clause 5.9.4 from the declaration rather than from the booking date: decide per hazard family whether a declared item or operation reaches the threshold that makes it hazardous, reconcile the customer safety questionnaire against that hazard set in both directions so an unanswered topic and an undeclared item both surface, flag a hazardous entry placed outside a controlled area, and derive the safety inputs the test process design ow...

ai-agentspython
0
2
Q2007 CleanlinessA

Compute and police test-centre cleanliness per ECSS-Q-ST-20-07C clause 5.5.3. Use when each activity has to carry a stated cleanliness level and evidence it was held: derive the airborne particle limit from the class number and particle size rather than quoting a table, compare the worst count with a margin ratio, read the surface obscuration limit off the cleanliness level, reject a certificate coarser than the activity asks for, grade monitoring cadence separately from conformance, and roll...

ai-agentspythonexpress
0
2
Q2007 Competence TrainingA

Manage test-centre personnel competence and training under ECSS-Q-ST-20-07C clause 5.4. Use when a person has to be cleared for a test role rather than merely assigned to it: fix the competence need per role on a level scale, measure each person against it, separate the four ways a competence fails - absent, below level, certificate lapsed, level asserted with no training behind it - check the assessment record against the retention window, order the remaining work into a stable training plan...

ai-agentspython
0
2