Coordinate the customer review board sitting on a submitted major nonconformance under ECSS-Q-ST-10-09 clauses 5.2.3.1 to 5.2.3.3. Use when a supplier's package has reached the customer and the board has to establish whether it can take a disposition at all. Separates the two ways a sitting fails: the customer functions that constitute the board, and the supplier representative without whom nothing can be confirmed. Assesses the impacts the supplier cannot see from inside its own scope, meani...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill q1009-customer-meeting --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Q1009 Customer Meeting?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-q1009-customer-meeting)More formats (shields.io, HTML) on the badges page.
---
name: q1009-customer-meeting
description: "Coordinate the customer review board sitting on a submitted major nonconformance under ECSS-Q-ST-10-09 clauses 5.2.3.1 to 5.2.3.3. Use when a supplier's package has reached the customer and the board has to establish whether it can take a disposition at all. Separates the two ways a sitting fails: the customer functions that constitute the board, and the supplier representative without whom nothing can be confirmed. Assesses the impacts the supplier cannot see from inside its own scope, meaning system budget share, every interface parameter against its agreed range and slip against the activity float, then holds each submitted cause and consequence to a confirmed, disputed or open state. Trigger: ecss, q-st-10-09, customer-review-board-sitting, higher-level-impact-assessment, interface-parameter-range-breach, activity-float-consumption, supplier-confirmation-of-causes, disposition-deferral."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, q-st-10-09-nonconformance-control-scope, q1009-customer-meeting, customer-review-board-sitting, higher-level-impact-assessment, interface-parameter-range-breach, activity-float-consumption, supplier-confirmation-of-causes]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Nonconformance Control — Customer Review Board (space-systems/ecss/q1009-customer-meeting)
Use when the task is the customer-side processing of ECSS-Q-ST-10-09
clauses 5.2.3.1 to 5.2.3.3 — the board that actually disposes of a major
departure meeting on it, working out what it costs at a level the
supplier cannot see, and settling with the supplier what is true.
## Domain quick reference
- A customer board fails in two independent ways and they have different
repairs. Missing a customer function leaves it unconstituted and it
cannot sit at all. Missing the supplier representative leaves it
perfectly constituted and unable to confirm anything, because
confirmation is a two-party act. Merging the two verdicts sends the
wrong people to the next meeting.
- The customer board owns the impacts the supplier's analysis structurally
cannot reach. The supplier knows what the departure does to its own
item; only the customer knows what it does to the system budget it was
allocated from, to the interface the neighbouring unit was built to,
and to the schedule the activity sits in.
- A budget is assessed as a share of its allocation, and consuming the
whole allocation is not an overrun. A share that lands exactly on its
limit is a representation question absorbed by a named tolerance, not
a reason to widen the allocation.
- An interface parameter is judged against the range the interface
document agreed, and a value exactly on a bound conforms. Interface
bounds are the classic place where a strict comparison on a float
turns a conforming unit into a finding on one machine and not on
another.
- Schedule impact is float first, critical path second. A slip inside
the activity float costs float and nothing else; a slip equal to the
float exhausts it without delaying anything, and is worth saying
because the next slip has nowhere to go; a slip beyond it delays the
programme by the difference.
- Confirmation is per statement, not per package. Each submitted cause
and each submitted consequence comes back confirmed, disputed or still
open, and a single disputed statement defers the disposition — the
board cannot dispose of a departure whose cause the two parties do not
agree on.
- An unacceptable impact is not a reason to defer. The board that
discovers the departure blows the mass budget is exactly the board
that has to decide what happens to the item; deferring on bad news is
how a departure sits open for two quarters.
## Workflow
1. Validate attendance and split the verdict: the mandatory customer
functions sitting, and the supplier representative present. Report
quorum and confirmation capability separately.
2. Assess the system budget: the consumed share of the allocation, with
the at-allocation boundary absorbed by a named tolerance.
3. Assess every interface parameter against its agreed range, refusing
an inverted range as an input error and treating an on-bound value as
conforming. Name every breaching parameter.
4. Assess the schedule: float remaining, float exhausted, and the delay
in days when the slip runs past the float.
5. Take each submitted statement's confirmation state. With the supplier
absent nothing can be confirmed, so every statement reverts to open
for this sitting and the block is named as the absent supplier rather
than as a supplier disagreement.
6. Decide the outcome: not quorate, deferred pending confirmation, or a
disposition the board can decide. Impact findings are reported
against the decision, never used to defer it.
## Pitfalls
- Reporting one attendance verdict. "The board was not quorate" sends a
customer delegate when what was missing was the supplier engineer who
could have answered the cause question in five minutes.
- Accepting the supplier's impact assessment as the higher-level one. It
was made from inside the supplier's scope and cannot see the budget
the item was allocated from or the unit on the other side of the
interface.
- Using a strict comparison on an interface bound. A parameter landing
exactly on its limit then fails or passes on floating-point rounding,
and the same unit is judged differently by two sites.
- Reading an exhausted float as a schedule impact. Nothing is late yet;
saying so loudly is right, recording a delay that does not exist is
not.
- Confirming the package rather than the statements. One disputed cause
hidden inside a confirmed package is exactly the disagreement that
reopens the disposition later.
- Deferring because the impacts came back bad. The bad news is the
board's own business; deferral is for what it cannot yet know, which
is an unconfirmed cause or an empty supplier chair.
## Behavior contract (gate 3)
The split attendance verdict, the budget-share assessment with its
at-allocation boundary, the interface-range check with its on-bound
case, the float-then-critical-path schedule assessment, the per-statement
confirmation with the absent-supplier case and the outcome selection are
exercised by the gate 3 contract test:
scripts/test_q1009_customer_meeting.py against
scripts/q1009_customer_meeting_logic.py (stdlib unittest, offline).
Run: python3 scripts/test_q1009_customer_meeting.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.