Plan the test process of a campaign under ECSS-Q-ST-20-07 clause 5.7.1 and say whether the plan can be committed to the customer. Use when activities, resources, reviews and customer interfaces have to be reconciled into one schedule rather than four: refuse a dependency graph that closes on itself, take the longest path through the activities as the campaign duration, measure the margin left against the customer milestone, load every resource against the capacity declared for it, and check t...
Scanned 9/27/2026
Install to Claude Code
npx -y skills add ashfordeOU/aero-agent-skills --skill q2007-process-planning --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Q2007 Process Planning?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/ashfordeou-q2007-process-planning)More formats (shields.io, HTML) on the badges page.
---
name: q2007-process-planning
description: "Plan the test process of a campaign under ECSS-Q-ST-20-07 clause 5.7.1 and say whether the plan can be committed to the customer. Use when activities, resources, reviews and customer interfaces have to be reconciled into one schedule rather than four: refuse a dependency graph that closes on itself, take the longest path through the activities as the campaign duration, measure the margin left against the customer milestone, load every resource against the capacity declared for it, and check the required reviews and the customer notification lead. Trigger: ecss, q-st-20-07-test-process-clause-5-7-1, test-campaign-critical-path-duration, test-campaign-schedule-margin, test-campaign-resource-capacity-shortfall, test-campaign-review-coverage."
license: Apache-2.0
compliance: STANDARDS-REF
standards:
- id: ecss
reference-only: true
gated: false
domain: space-systems
pack: space-systems
compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"
metadata:
domain: space-systems
subdomain: ecss
tags: [ecss, q-st-20-07-test-centre-scope, q2007-process-planning, q-st-20-07-test-process-clause-5-7-1, test-campaign-critical-path-duration, test-campaign-schedule-margin, test-campaign-resource-capacity-shortfall, test-campaign-review-coverage, test-campaign-customer-notification-lead]
version: 0.1.0
author: Aero Agent Skills
---
# ECSS Test Centres — Test Process Planning (space-systems/ecss/q2007-process-planning)
Use when the task is clause 5.7.1 of ECSS-Q-ST-20-07: a test campaign
has to be planned before it is run, the activities, the resources, the
reviews and the customer interfaces all sit in the same plan, and the
question is whether that plan can be committed to.
## Domain quick reference
- A campaign duration is the longest path, not the sum. Activities that
do not depend on each other run together, so adding the durations
overstates the campaign and adding only the durations of the named
chain understates it; the longest path through the dependency graph
is the campaign.
- A dependency graph that closes on itself has no duration at all. A
cycle is an input error, not a long path, and returning any number
for it invents a plan that cannot be executed.
- Margin is against the customer milestone, not against the plan. The
plan always fits itself; what matters is the span left between the
end of the longest path and the date the customer is holding.
- Resource loading is per resource. A campaign can be inside its total
effort and still be impossible because one shaker, one clean room or
one qualified operator is committed twice, so each resource is loaded
against its own declared capacity.
- The reviews are part of the plan. A campaign plan that names no test
readiness review or no post-test review is short of the interfaces
the clause asks for, whatever its schedule looks like.
- The customer interface has a lead time. A notification sent after the
lead the contract carries denies the customer the chance to attend or
to object, and it is checked against the start of the campaign rather
than against the plan date.
## Workflow
1. Validate the planning policy first: the schedule margin the test
centre requires, the reviews a campaign owes and the customer
notification lead. A negative margin requirement is refused.
2. Refuse a campaign with no activities; that closes on the process not
being planned rather than on a zero-length campaign.
3. Validate the activities: a label, a positive duration, a resource
and a predecessor list naming only declared activities. Refuse the
same activity twice and refuse an activity that depends on itself.
4. Order the activities topologically; a graph that will not order is a
cycle and is refused rather than truncated.
5. Walk the order, taking each activity's earliest start as the latest
finish among its predecessors, and keep the greatest finish as the
campaign duration. Collect the chain that produced it.
6. Take the schedule margin as the customer milestone less the campaign
duration, and compare it with the margin required.
7. Load each resource with the durations of the activities assigned to
it and compare against the capacity declared for that resource.
8. Check the required reviews against those the plan names, and the
notification lead against the campaign start. Close on one verdict
in order: process not planned, a required review missing, schedule
margin negative, a resource over capacity, the customer notified
late, margin below the required span, or the plan committable.
## Pitfalls
- Summing the activity durations. Parallel activities are the reason a
campaign fits at all, and a summed duration turns a feasible plan into
a rejected one.
- Taking the longest named chain by inspection. The longest path is
rarely the chain anyone wrote down; it has to be computed over the
whole graph, including the branches that look short.
- Returning a duration for a cyclic graph. A cycle means somebody wired
a predecessor backwards, and a number returned for it is a plan that
cannot be run.
- Checking total effort against total capacity. One over-committed
shaker sinks a campaign whose total effort is comfortably inside the
test centre's total, so the load is taken per resource.
- Measuring the notification lead from the plan date. The lead the
customer is owed runs back from the start of the campaign, and a plan
written late does not shorten it.
## Behavior contract (gate 3)
The policy validation, activity validation, the self-dependency and
cycle refusals, the topological order, the longest-path duration and
its chain, the schedule margin, the per-resource load against capacity,
the review coverage, the customer notification lead and the verdict
ordering are exercised by the gate 3 contract test:
scripts/test_q2007_process_planning.py against
scripts/q2007_process_planning_logic.py (stdlib unittest, offline).
Run: python3 scripts/test_q2007_process_planning.py
## Compliance
- ECSS standards are freely downloadable (ESA); cite the source and
paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.