
Claude Skills by ashfordeOU
github.com/ashfordeOUValidate the ordered set of stress and inspection steps a hybrid microcircuit batch ran on every one of its units, under ECSS-Q-ST-60-05 clause 10.3. Use when a performed screening run has to be graded against the sequence it was meant to follow: name every inversion on both steps it involves, catch a step performed on the wrong side of the sealing operation, test that each step covered the whole batch and not part of it, report the mandatory steps nobody ran, and return the sequence-conformi...
Determine whether a hybrid procurement case has the technology identification form it needs and what that form must cover before supplier assessment can begin, under ECSS-Q-ST-60-05C clause 6.2. Use when a hybrid is being procured, the supplier has declared its construction technologies, and the assessment team needs to know which form sections are owed, which assessment activities the form unlocks, and which stay blocked. Maps each declared technology onto the assessment areas it feeds, repo...
Map a hybrid manufacturer validation programme onto the path ECSS-Q-ST-60-05 clause 6.1 lays out: hold its purpose - demonstrated, repeatable capability inside a declared technology scope - and order the stages from request and documentation review through audit, validation vehicle build, evaluation testing and validation review to the surveillance that keeps a granted validation alive. Use when a validation plan is drafted or reviewed, when a supplier asks what the path costs in stages, or w...
Determine how a hybrid technology identification form is completed when the supplier already holds approved production line status, under ECSS-Q-ST-60-05C clause 6.2.2. Use when an approved line is offered against a hybrid order and the buyer needs to know whether the approval really covers the technologies requested, which entries may be answered by reference to it, and which must still be written out in full. Matches every requested technology against the approval scope, places the order da...
Evaluate the identification form content a supplier owes when its hybrid production line holds no approval at all: derive the blocks the case owes, including the three that stand in for the missing approval, validate the submission against the registry, grade each block complete, partial or absent, read every blank cell as absent rather than supplied, split the absent fields into the deciding ones and the merely supporting ones, and decide admissibility on the deciding fields alone. Use when ...
Evaluate a hybrid technology identification form against the preparation and upkeep rules that apply to every supplier case under ECSS-Q-ST-60-05C clause 6.2.1. Use when a form has been issued, amended or is approaching its periodic review and the procurement authority needs to know whether it is still valid, who owes the next action, and what the next issue number is. Assesses the mandatory entries, the preparing and accepting roles, the issue identification, the change-driven reissue trigge...
Determine how a hybrid identification form is handled while the named production line is still working toward its capability approval: validate the milestone record, count the steps closed and the ones closed only by waiver, score the completion share against the provisional threshold, date the re-confirmation the form owes and the day it lapses, compare the approval target with the hardware need date, and return an accept-provisionally, hold or reject disposition with its findings. Use when ...
Audit the images of an assembled hybrid microcircuit interior captured before the package closes, and decide whether they hold as permanent evidence of the as-built configuration, under ECSS-Q-ST-60-05 clause 10.3.4. Use when a photographic record has to be graded rather than filed: test that the smallest feature spans enough pixels, drop unreadable frames before counting coverage, name every declared die, interconnect region and attach area no frame shows, weigh the archive format and retent...
Determine whether an element inside an opened hybrid assembly may be removed and a replacement fitted under ECSS-Q-ST-60-05C clause 10.5.2. Use when a chip or other mounted part has to come out of a unit that is already built: count the replacement attempts the site has left, add the thermal excursions the removal and refit impose and weigh them against the site allowance, find the neighbours inside the keep-out radius whose temperature limit the attach method would pass, and return permitted...
Calculate whether the failures charged to a hybrid microcircuit lot have passed the limits that refuse the whole batch under ECSS-Q-ST-60-05C clause 10.4.2: validate that the per-stage record describes one consistent flow of hardware, compute the percentage defective at each screening stage against its stated limit, apply an absolute accept number instead below the small-lot population, add the cumulative percentage over the whole sequence, and return accept or reject naming every limit excee...
Determine whether a delivered batch of material or piece parts may enter hybrid manufacture under ECSS-Q-ST-60-05C clause 9.4: compute the batch age at receipt and the shelf life left against the planned time to use, test the observed storage temperatures against the declared storage regime, confirm the lot carries one manufacturing identity, check the lot documentation owed by that item category, and return release, conditional-release or quarantine with every failing condition named. Use wh...
Audit whether the specification defining a material or piece part procured for hybrid microcircuit construction settles everything an order needs under ECSS-Q-ST-60-05C clause 9.3: build the content set from the core items plus the ones the item's own category adds, read a placeholder such as TBD as undefined rather than declared, compute the completeness ratio over the applicable set alone, confirm the document is approved and dated, and compare the specification issue with the issue the ord...
Determine whether a sealed hybrid may be reopened under ECSS-Q-ST-60-05C clause 10.5.5, and what the reseal then owes. Use when a delid is proposed on a closed unit, for repair or for analysis: test whether that seal type can be reinstated at all, spend the reopen-cycle allowance and the sealing land each reseal consumes, read the reason to see whether the unit can return to deliverable stock, build the retest set the reseal carries, and return reopen-permitted, reopen-permitted-non-deliverab...
Assess the protective packing, electrostatic precautions and shipping arrangements a finished hybrid microcircuit lot travels under, per ECSS-Q-ST-60-05 clause 13.3. Use when a shipment is being packed or a packing specification reviewed: derive the electrostatic protection level the device withstand voltage demands and compare it with the packaging actually used, size the cushion from the declared drop and allowable shock, budget the moisture against the desiccant enclosed, test the transpor...
Assess a particle impact noise detection run on a sealed-cavity hybrid under ECSS-Q-ST-60-05C clause 10.3.6. Use when the task is deciding whether the package even presents a cavity to listen into, bounding the shock and vibration excitation by peak, frequency and the stroke it implies, counting the shock-and-listen cycles a quiet result owes, deriving the particle mass that can bridge the smallest conductor spacing, and withdrawing a block of quiet units when the closing sensitivity check fa...
Determine whether a lot of bare passive chips is bondable from the destructive wire pull sample ECSS-Q-ST-60-05C clause 8.2.2 calls for before the lot is used: read the minimum pull force for the wire material and diameter actually used from an interpolated table, size the sample as a floor on bonds pulled and on the chips they spread over, categorize where each bond separated, fail a lift at the termination or a termination off the chip body whatever force was read, and reduce the forces to ...
Assess a delivery of bare passive chips against the baseline conditions ECSS-Q-ST-60-05C clause 8.2.1 holds for every purchase, whatever the element type: judge the supply route as an approved manufacturer, an approved distributor with an unbroken traceability chain, or open market; size the visual examination from the lot size through a banded sample plan with a zero accept number; convert the date code and the delivery week into an age against the limit; grade carriage, static protection an...
Evaluate the lot acceptance evidence behind an incoming batch of passive chips for hybrid assembly under ECSS-Q-ST-60-05C clause 8.2.3. Use when the task is sizing the attribute sample a lot owes from its population, setting the acceptance number a destructive test drives to zero, computing the observed defective fraction and the lot tolerance the plan actually buys, grading that fraction against the percent-defective-allowable its chip family carries, and refusing a rejected lot resubmitted ...
Evaluate the purchase of a bare passive chip element under ECSS-Q-ST-60-05C clause 8.2: resolve the order line to a chip resistor, capacitor or inductor, merge the type-specific ordering data set with the baseline every bare chip carries, name what the line failed to declare, check the termination metallization against the attachment method the assembly will use, form the applied-to-rated stress ratio against the derating limit that type carries, confirm one production lot per delivery, and r...
Verify a finished hybrid package against its drawing tolerances and the host site it has to enter, under ECSS-Q-ST-60-05C clause 10.3.8. Use when the task is holding asymmetric plus and minus limits apart instead of folding them, grading a reading against those limits with its own measurement uncertainty in hand, judging whether the gauge can resolve the tolerance band at all, fitting the largest package the drawing permits into the site with its keep-out intact, and accumulating terminal pos...
Compute what a biased thermal soak run on an open hybrid microcircuit package actually delivered, and decide whether the unit survived it, under ECSS-Q-ST-60-05 clause 10.3.3. Use when a burn-in log has to be graded rather than counted: convert the chamber hours to equivalent hours at the reference condition through the Arrhenius relation, test every segment against the permitted band, discard the hours before a break long enough to cool the unit, weigh each monitored parameter's drift agains...
Plan the per-batch acceptance scheme an approved hybrid line operates under ECSS-Q-ST-60-05C clause 12.2.1: validate the production lot and its acceptance groups, allocate units from the lot to each group without letting samples share units, separate the units destroyed from the units returned to stock, disposition each group against its own acceptance number and then the lot against its groups, and track resubmissions and consecutive rejected lots to the point where the option itself is susp...
Assess the acceptance of a hybrid built by a maker validated for one programme only, under ECSS-Q-ST-60-05C clause 12.3: validate the programme validation record and the build it is read against, decide whether the validation reaches this build on programme, technology, hybrid type and date, assemble the production acceptance steps the build owes with the additions a first lot and an enhanced reliability level bring, name what is still outstanding, and keep an out-of-scope validation separate...
Evaluate the radiographic screening of a sealed hybrid package under ECSS-Q-ST-60-05C clause 10.3.10. Use when the task is deciding how many views the interior owes, showing the image can resolve the smallest rejectable feature, keeping beam transmission inside the band where a lid is neither opaque nor washed out, grading attachment voiding by total area, worst single void and what sits under the active area, and judging loose material by the conductor spacing it can span. Trigger: ecss, q-s...
Evaluate what may be done with a hybrid microcircuit batch that has been refused under ECSS-Q-ST-60-05C clause 10.4.3: test each disposition route — rework and resubmission, screening to a lower grade, return to the manufacturer, use as is under a customer waiver, and scrapping — against the rejection context, report the conditions keeping each closed, keep scrapping as the always-open fallback, treat customer notification as unconditional and prior, and recommend the first open route with th...
Verify that a proposed repair on a hybrid microcircuit satisfies the general conditions of ECSS-Q-ST-60-05C clause 10.5.1: test the operator's certification for this specific action and its validity on the day of the work, count the attempts already spent at the bond site and on the element against their allowances, measure the fraction of the unit's elements that would have been repaired, confirm the record set that travels with the work, and return the permission with every failing conditio...
Evaluate whether a hybrid line may keep substituting statistical monitoring and a technical review board for batch sampling under ECSS-Q-ST-60-05C clause 12.2.2: validate the per-lot yield window, draw control limits from the line's own history, find the lots outside them and the runs drifting off centre inside them, check the board's roles, quorum and review currency, and return continue, revert to per-lot testing, or suspend with every reason named. Use when auditing a monitored hybrid prod...
Evaluate the baseline provisions that govern how a hybrid microcircuit screening sequence is planned, applied and recorded, under ECSS-Q-ST-60-05 clause 10.3.1. Use when a screening programme needs grading above the level of its individual steps: test that the sequence reached every delivered unit, that it was written and approved beforehand, that each reject criterion was fixed before the data arrived and that results were kept per unit, weigh the batch against its screening reject allowance...
Evaluate the form filed when likeness to an already approved hybrid design is offered as grounds for a reduced approval programme, against the entries Annex C of ECSS-Q-ST-60-05C requires it to record. Use when the claim reaches the procurement authority and the record itself must be judged sound before the route is even considered: check the reference identity block and the recorded approval status, confirm a comparison row exists for every mandated attribute, test each declared same-or-diff...
Determine whether a hybrid microcircuit that cannot carry a normal direct body mark may be identified by an alternative arrangement, and which one, under ECSS-Q-ST-60-05 clause 10.2.2. Use when a package is too small to letter or its finish will not hold lettering: compute the footprint the mandatory field set needs at the legibility floor, substantiate the special case before allowing any fallback, rank the fallbacks by how hard the identification is to separate from the unit, require the co...
Verify the information a delivered hybrid microcircuit carries on its package body and the durability its lettering has to keep, under ECSS-Q-ST-60-05 clause 10.2.1. Use when a body mark is graded against the standard content set: test every mandatory field for presence and for form, validate the lot date code and the serial number, size the character height against the body area, compute the mark-to-body contrast, weigh the solvent-resistance evidence and the legibility left after it, and re...
Assess an on-site quality and technical audit of a hybrid supplier's production line and decide whether that line supports a category two validation, under ECSS-Q-ST-60-05 clause 6.3.3. Use when the audit evidence has to be graded rather than summarised: require an audit team carrying both a quality auditor and a technology specialist, treat a desk review of a mandatory area as uncovered, score quality-system maturity and technical capability on separate axes so a strong one cannot mask a wea...
Audit a technology identification form delivered as a data item against the entries and arrangement Annex A of ECSS-Q-ST-60-05C mandates. Use when a hybrid manufacturer hands the completed form over and the procurement authority must accept or hold the deliverable: confirm every mandated header and body entry is present and carries a value, fire each conditional rule so a declared option pulls in the further entries it owes, place an entry that sits outside the mandated set, measure how far t...
Analyze an infrared image of a biased hybrid microcircuit taken before its package is sealed and decide which sites are behaving as the design predicted, under ECSS-Q-ST-60-05 clause 10.3.2. Use when a thermographic screening run has to be graded rather than glanced at: test that the detector resolves the smallest feature, correct the reading for surface emissivity and reflected background, take every rise against the recorded reference, weigh each site against the absolute surface limit and ...
Evaluate a proposed reattachment of an interconnect wire inside a hybrid against the bonding limits of ECSS-Q-ST-60-05C clause 10.5.3. Use when a lifted or broken wire has to be put back and the question is how many attempts the site has left: count the attempts against the allowance for that pad kind, add the accumulated bond footprints and test whether the proposed bond still fits the bondable area, apply the remnant-removal and over-footprint placement rules, flag the wire-to-pad metal pai...
Determine whether a microwave die may be approved for the application it is actually intended to serve, and by which route. Use when an ECSS-Q-ST-60-12C clause 8.1 application approval has to be established: widen every declared usage condition to its worst case in the direction of the bound it is judged against, normalise the margin on the envelope span so a temperature scale with an arbitrary zero still decides, then pick between reuse of an approval already held, a delta approval for bound...
Build the ordered evaluation test flow that earns a microwave die its application approval, and decide whether that flow can be run at all. Use when an ECSS-Q-ST-60-12C clause 8.2 approval programme has to be laid out: resolve the declared dependencies into one deterministic execution order, reject a cycle instead of silently dropping a step, cut that order into sample groups ending at the step that consumes their samples, add the group demands into a total, take elapsed time from the longest...
Verify a proposed MMIC block architecture against its electrical design requirements. Use when the review item is the chosen topology of ECSS-Q-ST-60-12C clause 7.3.2: validate every declared block, add the chain gain in decibels, propagate noise figure through the Friis contribution of each stage divided by the gain ahead of it, combine the output third-order intercepts as reciprocals referred to the chain output, sum the DC draw, check the topology realises every required function, then tur...
Assess the assembly review item of ECSS-Q-ST-60-12C clause 7.3.9 for a microwave die: confirm the declared die-attach medium is one the programme allows, size the die-to-carrier expansion mismatch across the qualification temperature swing against that medium's allowance, build the junction-to-case path from bondline thickness, conductivity and attached footprint, derive the junction temperature at the dissipated power and compare it against the derated rating, count the bond wires the derate...
Verify that an MMIC gain stage cannot oscillate anywhere in its operating envelope. Use when an amplifier has to be shown stable over frequency, bias and termination before release, per ECSS-Q-ST-60-12C clause 7.2.8: build the determinant and Rollett factor from the two-port scattering parameters at every analysed frequency, derive the geometric mu factor, place the source and load stability circles, test whether the terminations the matching networks will really present fall in the stable re...
Audit the compliance matrix review item of ECSS-Q-ST-60-12C clause 7.3.10 for a microwave die design: normalize every row onto a canonical requirement identifier, reject a requirement stated twice, confront the tabulated conformance statements with the applicable design requirement list to expose the requirements no row answers and the rows answering nothing, find the conformance claims carrying no evidence reference and the departures carrying no deviation or waiver, check each exclusion is ...
Verify at a design review that every declared device stress stays inside the reduced limit its derating rule sets, not merely inside the absolute maximum rating. Use when an ECSS-Q-ST-60-12C clause 7.3.6 derating review item has to close or stay open: resolve each rule into a derated limit by permitted-fraction or absolute-offset reduction in the conservative direction of the bound, open a nominal stress up to its worst case with the declared uncertainty, judge it on margin so a scale running...
Audit the design documentation review item of ECSS-Q-ST-60-12C clause 7.3.13 for a microwave die: fold every document identifier onto one canonical spelling, reject a document stated twice at one issue or issued under two types, take the controlling issue of each, confront the record with the document types the programme requires, expose the controlling issues still in draft and the earlier issues still circulating as released, walk every derivation chain to its root to find a dangling refere...
Assess whether an MMIC die carries the measurement access its acceptance flow needs. Use when a design has to be shown testable before tape-out, per ECSS-Q-ST-60-12C clause 7.2.7: map every parameter that will be characterised or screened onto the access the layout actually provides, check each probe pad against the probe card pitch and minimum landing area, categorize a parameter with no reachable access as assembly-level or unobservable, spend the touchdown budget and the die area the test ...
Size the development cycles an MMIC design plans before its freeze. Use when ECSS-Q-ST-60-12C clause 7.1.3 asks how many iterations the effort carries: derive the per-cycle convergence factor from process-model maturity, compute the cycles that close the predicted-to-required performance gap down to the acceptance gap, raise that to the novelty floor a heritage, derivative or new design carries, divide the schedule left after the non-recurring front-end by the foundry turnaround to get what t...
Validate the simulation models, foundry design kit and tools an MMIC development runs on, against ECSS-Q-ST-60-12C clause 5.3: compare each model's validated frequency, bias and temperature envelope with the envelope the design actually exercises, match every model to the process release the wafers are run on, hold measurement-correlation error inside tolerance, require electromagnetic verification of passive structures once the band reaches the frequency a lumped equivalent stops holding at,...
Determine whether an MMIC design effort holds its baseline conditions at every stage. Use when ECSS-Q-ST-60-12C clause 7.1.2 general provisions are established or audited: validate the declared specification-to-freeze stage order, map each mandatory provision — process-kit currency, model validity band, thermal derating baseline, layout rule compliance, radiation baseline, lifetime baseline — onto the stage it applies from, build the provision-by-stage coverage matrix, name the first stage wh...
Assess whether a microwave design review was validly convened and properly closed out. Use when the task is the conduct half of ECSS-Q-ST-60-12C clause 7.3.1 rather than the technical content: measure the convening notice lead time against the required minimum, test the attendee roster for quorum over the mandatory roles, confirm the chair sits outside the design team under review, validate every register entry for a consistent open or closed state with a recognised disposition, age the open ...
Evaluate the candidate MMIC architectures against performance, yield, die size and dc power together. Use when ECSS-Q-ST-60-12C clause 7.1.4 settles a microwave circuit architecture: eliminate the candidates that miss a requirement threshold and name every criterion each one missed, normalise the survivors onto a clamped threshold-to-goal utility so over-delivery on one axis cannot buy a shortfall on another, weight and rank them, report scores inside the tie tolerance as ties rather than a p...
Assess whether the alternative circuit versions sharing one mask set can be released together, under ECSS-Q-ST-60-12 clause 7.2.2. Use when several MMIC variants are placed on a common wafer or reticle and someone must decide the mask set is buildable: refuse a duplicate variant identifier or a derivation loop, confirm every variant traces to a baseline the mask set itself declares, detect process options that cannot coexist on one wafer, hold a variant whose die carries no distinct marking a...