# Generate Implementation Plan
**Overview Document:** $ARGUMENTS
---
## Phase 0: Context Retrieval
1. **Fetch the overview document** from parent: `{Overview_Document}`
2. **Extract from document:**
- `{Epic_Key}` - The epic ticket key (e.g., MA-123)
- `{Jira_Project}` - Link to the Jira project/board
- Related ticket links
3. **FAILURE CONDITION - Missing Information:**
If epic key or project cannot be determined:
**STOP and prompt the user:**
```
I was unable to extract required information from the overview document.
Found: [list what was found]
Please provide:
1. Epic Key: [e.g., MA-123]
2. Jira Project URL: [paste link]
```
**DO NOT PROCEED** until confirmed.
4. **MANDATORY CHECKPOINT - Document Confirmation:**
```
Please confirm the following before I proceed:
Overview Document: {Overview_Document}
Epic Key: {Epic_Key}
Jira Project: {Jira_Project}
Is this correct? (Yes / No / Correct)
```
**DO NOT PROCEED** without explicit user confirmation.
---
## Phase 1: Discovery
1. **Read the overview document** for epic context, scope, and risk assessments
2. **Read all Jira tickets** linked to this epic for detailed requirements
3. **Explore the codebase** to understand:
- File structure and naming conventions
- Similar existing implementations to reference
- Test patterns and fixtures available
- API patterns and data models
---
## Phase 2: Ticket Refinement
Analyze existing tickets and prepare adjustments (see Ticket Management below).
**MANDATORY CHECKPOINT - Proposed Ticket Changes:**
Before making ANY ticket changes, present to user:
```
## Proposed Ticket Changes for {Epic_Key}
### New Tickets to Create
| Title | Description | Points | Justification |
|-------|-------------|--------|---------------|
| [title] | [brief desc] | [pts] | [why needed] |
### Tickets to Split
| Original | New Tickets | Reason |
|----------|-------------|--------|
| [KEY] | [list new] | [why split] |
### Story Point Updates
| Ticket | Current | Proposed | Reason |
|--------|---------|----------|--------|
| [KEY] | [old] | [new] | [justification] |
### Dependencies to Add
| Ticket | Blocked By | Reason |
|--------|------------|--------|
| [KEY] | [blocker] | [why] |
Proceed with these changes? (Yes / No / Modify)
```
- **Yes** → Make the changes and continue
- **No** → Skip ticket changes, proceed to Phase 3
- **Modify** → User provides adjustments, re-confirm
**DO NOT modify any Jira tickets** without explicit approval.
---
## Phase 3: Implementation Plan
Generate a detailed, agent-executable implementation plan (see structure below).
**MANDATORY CHECKPOINT - Plan Review:**
Before publishing, present the complete implementation plan to the user:
```
## Implementation Plan Preview for {Epic_Key}
[Full implementation plan content]
---
Review the plan above. Proceed to publish? (Yes / No / Modify)
```
- **Yes** → Continue to Phase 4
- **No** → Discard and ask what changes are needed
- **Modify** → User provides feedback, regenerate and re-confirm
**DO NOT PROCEED** to publishing without explicit approval.
---
## Phase 4: Publish
1. **MANDATORY CHECKPOINT - Parent Document Updates:**
Before updating the parent planning document, present proposed changes:
```
## Proposed Updates to Overview Document
I will add the following "Adjustments Section" to {Overview_Document}:
[Show exact content to be added]
Proceed with update? (Yes / No / Modify)
```
**DO NOT UPDATE** the parent document without explicit approval.
2. Publish the implementation plan as a Confluence subpage (`{Implementation_Plan}`)
3. **Update all tickets with Implementation Plan link:**
- After publishing, `{Implementation_Plan}` URL is now known
- Update ALL epic tickets to replace placeholder with actual URL:
```
Overview Document: {Overview_Document}
Implementation Plan: {Implementation_Plan}
```
- This ensures `/execute-ticket` can extract both links from any ticket
4. Update the parent planning document with approved adjustments
---
## Ticket Management
Before creating the implementation plan, analyze the existing tickets and adjust as needed.
### Ticket Description Format (MANDATORY)
**ALL tickets** (new and existing) MUST have these links at the TOP of their description:
```
Overview Document: {Overview_Document}
Implementation Plan: {Implementation_Plan}
---
[Rest of ticket description]
```
- **New tickets:** Add this header when creating
- **Existing tickets:** Update description to add this header if missing
- `{Implementation_Plan}` will be the URL of the subpage created in Phase 4
**Note:** Since the Implementation Plan doesn't exist yet during Phase 2, use a placeholder:
```
Implementation Plan: [To be added after plan is published]
```
Then update all tickets with the actual URL after Phase 4 publishing.
### Create New Tickets
- Identify gaps in coverage (missing functionality, edge cases, setup tasks)
- Create tickets for discovered technical dependencies
- Add tickets for required refactoring or tech debt that blocks implementation
### Split Large Tickets
- Any ticket estimated at >8 story points should be split
- Each ticket should represent a single, deliverable unit of work
### Add Story Points
Estimate and add story points to ALL tickets (new and existing):
| Points | Complexity | Example |
|--------|------------|---------|
| 1-2 | Simple, isolated change | Fix typo, update config, add simple validation |
| 3-5 | Moderate, few files | New API endpoint, component with tests |
| 8 | Complex, multiple components | Feature spanning frontend + backend |
| 13+ | Too large - must be split | Epic-level work |
### Link Dependencies
- Set "blocked by" relationships in Jira for all dependencies
- Ensure no circular dependencies exist
---
## Implementation Plan Structure
### Summary Section
- Total number of tasks (including any new tickets created)
- Overall complexity assessment (Low/Medium/High based on risk scores)
- Total story points
- Key dependencies overview
- Suggested execution order
### Task Breakdown
For **each Jira ticket**, create a task entry with:
#### Task Header
- Ticket key and title (e.g., "MA-124 - Add user authentication")
- Link to the Jira ticket
- Story points
- Risk level from the planning doc (Low/Medium/High)
- Dependencies (list any tickets that must be completed first)
#### Implementation Steps
Provide **detailed, agent-executable steps** including:
- Specific file paths to create or modify
- Code patterns to follow (reference existing codebase patterns)
- API endpoints to implement
- Database changes if any
- Configuration updates needed
- Follow existing conventions for naming, file structure, and architecture
Each step should be concrete enough that an AI coding agent can execute it directly without additional context.
#### Files to Modify
List all files that will be touched:
- `path/to/file.ts` - Brief description of changes
#### Tests to Write
Specify exactly what tests are needed:
- **Unit tests:** List specific functions/components to test
- **Integration tests:** List API endpoints or service interactions to test
- **E2E tests:** List user flows to test (if applicable)
#### Acceptance Criteria
Each task is complete when:
- [ ] All implementation steps are done
- [ ] Pre-commit hooks pass (linting, formatting, type checks)
- [ ] Pre-push hooks pass (tests, build)
- [ ] Unit tests written and passing
- [ ] Integration tests written and passing (if applicable)
- [ ] E2E tests written and passing (if applicable)
- [ ] 90% branch coverage maintained
- [ ] All existing tests continue to pass
- [ ] Code reviewed and approved
- [ ] Jira ticket acceptance criteria met
---
### Execution Order
Provide a **topologically sorted** list of tasks based on dependencies:
1. Task A (no dependencies) - X points
2. Task B (depends on A) - X points
3. Task C (depends on A) - X points
4. Task D (depends on B, C) - X points
---
### Parallel Execution Strategy
Identify tickets that can be worked on **simultaneously** by independent agents:
#### Parallel Execution Waves
Group tickets into waves where all tickets in a wave can be executed concurrently:
```
Wave 1 (no dependencies - execute in parallel):
- TICKET-101: [title] (3 pts) → frontend-developer
- TICKET-102: [title] (5 pts) → backend-developer
- TICKET-103: [title] (2 pts) → test-automator
Wave 2 (depends on Wave 1 - execute in parallel after Wave 1):
- TICKET-104: [title] (5 pts) → fullstack-developer
- TICKET-105: [title] (3 pts) → frontend-developer
Wave 3 (depends on Wave 2):
- TICKET-106: [title] (8 pts) → fullstack-developer
```
#### Agent Specialization Recommendations
For each ticket, recommend the optimal agent type based on the work involved:
| Work Type | Recommended Agent |
|-----------|-------------------|
| Frontend UI/components | frontend-developer |
| API/backend services | backend-developer |
| Database changes | database-optimizer |
| Full-stack features | fullstack-developer |
| Test coverage | test-automator |
| Security-sensitive | security-auditor |
| Performance-critical | performance-engineer |
#### Coordination Notes
- Tickets in the same wave have no dependencies on each other
- Wave N+1 tickets depend on one or more Wave N tickets
- Independent agents can work simultaneously within each wave
- Synchronize and verify completion before starting next wave
---
## Parent Document Updates
After completing the implementation plan, update the original Confluence planning, `{Overview_Document}`,document with:
### Adjustments Section (add to planning doc)
- **Tickets Added:** List any new tickets created with justification
- **Tickets Split:** List any tickets that were split and why
- **Scope Changes:** Document any scope adjustments discovered
- **New Risks:** Add any new risks discovered during implementation planning
- **Revised Dependencies:** Update dependency graph if changed
- **Updated Estimates:** Revised total effort based on story points
---
## Output Location
Publish the implementation plan to Confluence as a subpage:
- Parent page: `{Overview_Document}`
- Subpage title: "{Epic_Key} Implementation Plan"
If the subpage already exists, update it. If you cannot create subpages, ask the user for an alternative location.
Also update the parent planning document at `{Overview_Document}` with the "Adjustments Section" content.
---
## Output
When complete, provide:
1. **Implementation Plan URL** (new subpage) - needed for ticket execution
2. **Updated Overview Document URL** (parent page)
3. **Summary of changes made** - tickets created, split, updated
---
## Agent Delegation
**Deep Exploration:** Thoroughly explore the codebase to understand:
- Current implementation patterns and conventions
- Affected components and their dependencies
- Existing test coverage and testing patterns
**Design Review:** Have the architectural approach reviewed for scalability,
maintainability, and alignment with existing patterns.
**Codebase Analysis:** Before proceeding, thoroughly explore the existing
codebase to understand current patterns, architecture, and conventions.
**Architecture Review:** Have the proposed structure reviewed for completeness
and proper organization.