Guides identification of survey and title issues in a mixed-use development site acquisition by systematically comparing the survey against the title commitment and related diligence documents and flagging issues affecting the proposed use and lender requirements.
Scanned 9/11/2026
Install to Claude Code
npx -y skills add sunyifeisb-art/legalwork --skill identify-issues-in-altansps-land-title-survey --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Identify Issues In Altansps Land Title Survey?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/sunyifeisb-art-identify-issues-in-altansps-land-title-survey)More formats (shields.io, HTML) on the badges page.
---
name: identify-issues-in-altansps-land-title-survey
task_id: real-estate/identify-issues-in-altansps-land-title-survey
description: Guides identification of survey and title issues in a mixed-use development site acquisition by systematically comparing the survey against the title commitment and related diligence documents and flagging issues affecting the proposed use and lender requirements.
activates_for: [planner, solver, checker]
---
# Skill: Identify Issues in ALTA/NSPS Land Title Survey — Issue Memorandum for Mixed-Use Acquisition
## 1. Subject-matter triage
- Treat the survey as a comparison document, not a standalone deliverable: identify what is plotted, noted, or omitted, then test it against the title commitment, site plan, lender instructions, and any lease or covenant materials in the package.
- If only one property is in scope, state that expressly; if multiple parcels, tracts, phases, or legal descriptions appear, analyze each separately before synthesizing project-level risk.
- Prioritize items that affect buildability, access, utilities, parking, setbacks, height, density, financing, or closing deliverability.
## 2. Failure modes the skill is correcting
- Reviewing the survey in isolation and missing discrepancies between the survey, title exceptions, and other diligence materials.
- Listing encumbrances without tying them to the proposed mixed-use program or site plan.
- Treating title exceptions as complete even when the survey reveals additional matters not yet scheduled by title.
- Missing lender-driven survey standards, endorsements, or gap conditions that must be satisfied for closing.
- Under-analyzing restrictive covenants, easements, access rights, encroachments, and lease rights that can limit development.
- Collapsing distinct issues into one generic risk statement instead of separating source, impact, severity, and cure.
## 3. Legal frameworks / domain conventions that apply
- Use the applicable survey standard for the jurisdiction and transaction type, and confirm whether optional survey items were required or provided.
- Compare the survey face, notes, legend, and exhibits against the title commitment schedule of exceptions and legal description.
- Treat unplotted title exceptions, unlisted survey matters, and mismatched legal descriptions as separate diligence gaps.
- For easements, assess beneficiary, location, scope, exclusivity, appurtenance, and consistency with proposed improvements.
- For restrictive covenants, analyze use limits, density, height, setback, parking, signage, architectural controls, and any consent or approval mechanism.
- For access, confirm that legal access exists from a public way or valid appurtenant private access right adequate for the planned use.
- For utilities and drainage, confirm easement location, width, reserving language, and whether planned improvements interfere with service or maintenance.
- For encroachments, evaluate whether they burden the subject, invade a neighbor, or sit within an easement/setback area, and whether title coverage or curative action is required.
- For existing tenancy, review whether occupancy, expansion rights, termination rights, construction access, restoration duties, or exclusivity provisions affect the project.
- For lender requirements, treat required endorsements, certifications, and survey content as closing conditions that may exceed buyer-facing title standards.
## 4. Analytical scaffolds
- Start by enumerating the property footprint, each survey-identified encumbrance, each title exception, and each lender or lease condition that could affect the deal.
- For each item, answer in sequence: what is it, where is it located, what source document shows it, does any other document corroborate or conflict with it, and how does it affect the intended development?
- Separate “survey-only,” “title-only,” and “cross-document mismatch” issues so the memo makes clear whether the problem is disclosure, scope, or curative coverage.
- For each restriction or easement, test the planned use against the governing document’s operative language and the project’s apparent footprint or operating assumptions.
- For each issue, state the practical consequence: buildability constraint, title insurance gap, financing condition, closing delay, redesign need, or post-closing operational limitation.
- Assign every issue an ordinal severity label using a consistent scale defined once at the top, and apply that scale uniformly.
- Use the project’s own dimensions, deadlines, or transaction milestones when available to calibrate urgency; if not available, say that the urgency is tied to closing, financing, or permit readiness.
- Close every issue with a concrete cure or next step, such as a survey revision, title update, endorsement request, covenant consent, easement confirmation, lease amendment, or plan adjustment.
## 5. Vertical / structural / temporal relationships
- Analyze vertical relationships between the survey, title commitment, and source exhibits: a matter disclosed in one but not the others is itself an issue.
- Analyze structural relationships between legal rights and physical placement: off-site rights, appurtenant access, shared driveways, setback areas, and utility corridors can all constrain the footprint even if they do not prohibit ownership.
- Analyze temporal relationships between current rights and future development: existing tenancy, deferred access, or unexpired restrictions may be acceptable now but disruptive at commencement, construction, or occupancy.
- If the package includes phased development, assess whether each phase changes access, easement conflicts, or title coverage needs.
## 6. Output structure conventions
- Open with a brief executive summary that identifies the highest-severity items, the document mismatches, and the main closing risks.
- Define the severity scale once, then use it consistently for each issue entry.
- Organize the memo by conventional diligence buckets such as survey/title mismatches, easements and access, restrictive covenants, encroachments, utilities/drainage, leases, lender requirements, and closing conditions.
- For each issue entry, include:
- source document and location reference,
- concise issue description,
- cross-document comparison,
- development or financing impact,
- severity,
- recommended cure or next step.
- When citing legal or transactional propositions, identify the governing authority or document provision by name and section or comparable location reference, rather than stating conclusions in abstract terms.
- End with a Recommended Actions section that assigns each action to the appropriate responsible party and ties it to closing, financing, or another relevant milestone.
- Use the requested filename: `survey-title-issue-memo.docx`.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!