Plan the build: vertical slice, milestones, scope cuts, and what actually ships in the first playable. Use when planning milestones, scoping features, or building roadmaps.

  • 4 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added September 22, 2026
designgo

Security analysis

A100/100

Pro scans all 3 files and shows the line behind each finding

Scanned September 22, 2026

npx -y skills add poorvith-mp/skills-gamedev --skill production-planning --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Production Planning?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Production Planning
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/poorvith-mp-production-planning/badge)](https://www.skillsdirectory.com/skills/poorvith-mp-production-planning)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: production-planning
last_reviewed: 2026-09-06
group: Plan
description: >-
  Plan the build: vertical slice, milestones, scope cuts, and what actually ships in the first
  playable. Use when planning milestones, scoping features, or building roadmaps.
---

# production-planning

## Core Philosophy
Game development is the most chaotic engineering discipline in tech because creative fun cannot be scheduled on a Gantt chart. Traditional waterfall planning leads to catastrophic death marches, while unstructured agile causes endless scope creep where games remain in development for 7 years without shipping. Successful game production operates on rigorous phased gating: moving from a brutal Proof of Concept to a polished Vertical Slice, enforcing aggressive scope triage, and defining an unshakeable Definition of Done for First Playable milestones.

---

## 4-Step Game Production Framework

### Step 1: The Phased Milestone Lifecycle
1. **Prototype / Core Loop Validation (Months 1-3)**:
   - *Goal*: Prove the core interaction is mechanically fun with gray-box geometry and zero final art. If the movement and combat do not feel satisfying with untextured cubes, no amount of 4K graphics will save the game.
2. **Vertical Slice (Months 4-7)**:
   - *Goal*: Build 10-15 minutes of final-quality gameplay containing all systems: final art, shaders, combat, UI, audio, save/load, and localization pipeline. This proves the production budget and velocity.
3. **Production / Content Scalpel (Months 8-16)**:
   - *Goal*: Factory-line asset and level generation using established Vertical Slice pipelines.
4. **Alpha $\to$ Beta $\to$ Gold Master (Months 17-20)**:
   - *Alpha*: Feature complete. Zero new systems allowed.
   - *Beta*: Content complete. Bug fixing, balancing, and optimization only.
   - *Gold*: Zero blocker/crash bugs. Console platform certification compliance.

### Step 2: The Vertical Slice Audit Criteria
1. **Vertical Slice Must Include**:
   - 1 complete, polished level/mission.
   - Fully animated player character and minimum 2 enemy archetypes.
   - Polished HUD, inventory, pause menu, and audio mix.
   - Profiler telemetry demonstrating stable frame budget (60 FPS on target hardware).
2. **The "Throwaway Code" Purge**:
   - Strip all prototype hacks and spaghetti code before beginning full production.

### Step 3: Scope Triage: The MoSCoW Feature Razor
1. **Must Have (Core Pillar)**:
   - Features without which the core loop collapses (e.g. gun recoil, cover system, enemy AI).
2. **Should Have (High Value)**:
   - Deepens gameplay but game could launch without it (e.g. weapon crafting, dynamic weather).
3. **Could Have (Scope Cut Candidates)**:
   - First to be chopped when schedule slips: photo mode, fishing mini-game, branching dialogue trees.
4. **Won't Have (Post-Launch / Sequel)**:
   - Multiplayer co-op in a planned single-player game, procedural world generation.

### Step 4: Velocity Tracking & Burndown Metrics
1. **Asset Velocity Calculation**:
   $$\text{Sprint Asset Velocity} = \frac{\text{Completed Game-Ready Assets}}{\text{Target Asset Quota}}$$
2. **Scope Contingency Rule**:
   - Always budget **25% buffer time** before certification and submission dates for unanticipated console platform compliance (TRC/TCR) failures.

---

## Deliverable Format: Milestone Roadmap & Scope Triage Ledger

```markdown
# Project: "Aetheria" Production Roadmap

## Milestone Gates:
- [x] M1: Graybox Core Loop (Movement + Melee Combat) — Approved Week 6
- [x] M2: First Playable (1 Boss Arena + Graybox Telemetry) — Approved Week 14
- [ ] M3: Vertical Slice (15 Min Final Level + 60 FPS Target) — Deadline: Week 26
- [ ] M4: Alpha Gate (Feature Complete, 4 Levels Playable) — Deadline: Week 42
- [ ] M5: Beta Gate (Content Complete, Zero P1 Bugs) — Deadline: Week 54

## Scope Cut Contingency Tiers:
| Tier | Feature Name | Estimated Dev Weeks | Cut Trigger Date |
|---|---|---|---|
| Tier 1 | Dynamic Day/Night Lighting Cycle | 4 Weeks | If M3 delayed by > 2 weeks |
| Tier 2 | Companion Pet AI System | 6 Weeks | If Alpha milestone slips by 3 weeks |
| Tier 3 | Weapon Dye Customization UI | 2 Weeks | Immediate cut if console cert fails |
```

---

## Worked Example: Emergency Scope Cut to Save a 6-Month Slipping Release

- **Context**: An action-adventure studio was 14 weeks behind schedule entering Alpha. The team was attempting to build 12 distinct weapon classes and 4 open-world vehicle types.
- **Intervention**: The production lead applied the MoSCoW razor: slashed the 4 vehicle classes entirely (saving 18 weeks of physics engineering and animation), and consolidated the 12 weapon classes into 5 highly polished archetypes.
- **Outcome**: The team recovered 12 weeks of schedule, eliminated mandatory weekend crunch, and hit console certification on the first submission attempt.

---

## Verification Checklist

- [ ] Every milestone has an objective, non-negotiable Definition of Done.
- [ ] Prototype phase verifies gameplay fun before art asset production begins.
- [ ] Vertical Slice benchmarks real production velocity and frame budgets.
- [ ] Pre-determined Scope Cut list exists before delays occur.
- [ ] Minimum 25% schedule buffer allocated for console certification (Sony TRC / Microsoft TCR).

---

## Anti-Patterns

- **Starting Full Production on Unfun Graybox**: Investing $500K in 3D character art while the movement mechanics still feel clunky and unresponsive.
- **Endless Prototyping (Feature Creep)**: Adding new mechanics every week based on whatever game the creative director played over the weekend.
- **Zero Scope Cut Contingency**: Treating every single planned feature as a sacred requirement until the studio runs out of runway.

Files in this skill

  • SKILL.md5.6 KB
  • evals/routing.yaml977 B
  • production-planning.skill3.5 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.