Estimate Calibrator

ASecurity

Produces calibrated three-point PERT estimates (best/likely/worst) with confidence intervals, unknowns, and assumptions. Triggers on: "estimate this", "how long will this take", "effort estimate", "confidence interval", "story points", "t-shirt sizing". NOT for task decomposition, use task-decomposer.

  • 318 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added May 27, 2026
developmentgoapidocumentation

Works with

  • api

Security analysis

A100/100

Pro scans all 6 files and shows the line behind each finding

Scanned May 27, 2026

npx -y skills add Mathews-Tom/armory --skill estimate-calibrator --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Estimate Calibrator?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Estimate Calibrator
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mathews-tom-estimate-calibrator/badge)](https://www.skillsdirectory.com/skills/mathews-tom-estimate-calibrator)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: estimate-calibrator
description: 'Produces calibrated three-point PERT estimates (best/likely/worst) with confidence intervals, unknowns, and assumptions. Triggers on: "estimate this", "how long will this take", "effort estimate", "confidence interval", "story points", "t-shirt sizing". NOT for task decomposition, use task-decomposer.'
metadata:
  version: 1.1.1
  category: development
  tags: [estimation, pert, confidence-interval, planning]
  difficulty: intermediate
  phase: plan
---

# Estimate Calibrator

Replaces single-point guesses with structured three-point estimates: decomposes work
into atomic units, estimates best/likely/worst case for each, identifies unknowns and
assumptions, calculates aggregate ranges using PERT, and assigns confidence levels with
explicit rationale.

## Reference Files

| File                               | Contents                                                                  | Load When              |
| ---------------------------------- | ------------------------------------------------------------------------- | ---------------------- |
| `references/estimation-methods.md` | PERT formula, three-point estimation, Monte Carlo basics                  | Always                 |
| `references/unknown-categories.md` | Technical, scope, external, and organizational uncertainty types          | Unknown identification |
| `references/calibration-tips.md`   | Cognitive biases in estimation, historical calibration, buffer strategies | Always                 |
| `references/sizing-heuristics.md`  | Common task size patterns, complexity indicators, reference class data    | Quick sizing needed    |

## Prerequisites

- Work item description (feature, task, project)
- Decomposed tasks (or use task-decomposer skill first)
- Context: team familiarity, tech stack, existing codebase

## Workflow

### Phase 1: Decompose Work

If the work item is not already decomposed into atomic units:

1. **Break into tasks** — Each task should be estimable independently.
2. **Right granularity** — Tasks should be 1 hour to 3 days. Larger tasks have higher
   uncertainty; break them down further.
3. **Identify dependencies** — Tasks on the critical path determine the minimum duration.

### Phase 2: Three-Point Estimate

For each task, estimate three scenarios:

| Scenario    | Definition                              | Mindset                                       |
| ----------- | --------------------------------------- | --------------------------------------------- |
| Best case   | Everything goes right. No surprises.    | "If I've done this exact thing before"        |
| Likely case | Normal friction. Some minor obstacles.  | "Realistic expectation with typical setbacks" |
| Worst case  | Significant problems. Not catastrophic. | "Murphy's law but not a disaster"             |

**Key rule:** Worst case is NOT "everything goes wrong." It's the realistic bad scenario
(90th percentile), not the apocalyptic one (99th percentile).

### Phase 3: Identify Unknowns

Categorize unknowns that affect estimates:

| Category       | Example                               | Impact                                       |
| -------------- | ------------------------------------- | -------------------------------------------- |
| Technical      | "Never used this library before"      | Likely case inflated, worst case much higher |
| Scope          | "Requirements may change"             | All estimates may shift                      |
| External       | "Depends on API access from partner"  | Blocking risk — could delay entirely         |
| Integration    | "Haven't tested with production data" | Hidden complexity at integration             |
| Organizational | "Need design approval"                | Calendar time, not effort time               |

### Phase 4: Calculate Ranges

For individual tasks, use the PERT formula:

```text
Expected = (Best + 4 × Likely + Worst) / 6
Std Dev = (Worst - Best) / 6
```

For aggregate (project) estimates:

- **Sum of expected values** for total expected duration
- **Root sum of squares of std devs** for aggregate uncertainty

### Phase 5: Assign Confidence

| Confidence | Meaning                          | When                                          |
| ---------- | -------------------------------- | --------------------------------------------- |
| High       | Likely case within ±20%          | Well-understood task, team has done it before |
| Medium     | Likely case within ±50%          | Some unknowns, moderate familiarity           |
| Low        | Likely case within ±100% or more | Significant unknowns, new technology          |

## Output Format

```text
## Estimate: {Work Item}

### Summary
| Scenario | Duration |
|----------|----------|
| Best case | {time} |
| Likely case | {time} |
| Worst case | {time} |
| **PERT expected** | **{time}** |
| **Confidence** | **{High/Medium/Low}** |

### Task-Level Estimates

| # | Task | Best | Likely | Worst | PERT | Unknowns |
|---|------|------|--------|-------|------|----------|
| 1 | {task} | {time} | {time} | {time} | {time} | {key unknown or "None"} |
| 2 | {task} | {time} | {time} | {time} | {time} | {key unknown} |
| | **Total** | **{sum}** | **{sum}** | **{sum}** | **{pert}** | |

### Key Unknowns

| # | Unknown | Category | Impact on Estimate | Mitigation |
|---|---------|----------|-------------------|------------|
| 1 | {unknown} | {Technical/Scope/External} | +{time} if realized | {spike, prototype, early test} |

### Assumptions
- {Assumption 1 — what must be true for this estimate to hold}
- {Assumption 2}

### Risk Factors
- {Risk}: If realized, adds {time}. Likelihood: {High/Medium/Low}.

### Confidence Rationale
**{High/Medium/Low}** because:
- {Specific reason — e.g., "Team has built 3 similar features"}
- {Specific reason — e.g., "External API is a new integration"}

### Recommendation
{Commit to PERT expected with {X}% buffer, or spike the top unknown first.}
```

## Calibration Rules

1. **Three points, not one.** Single-point estimates are always wrong. Three points
   communicate uncertainty — the most important part of any estimate.
2. **Worst case is the 90th percentile, not the 99th.** "Asteroid hits the office" is
   not a useful worst case. "The API documentation is wrong and we need to reverse-engineer
   the protocol" is realistic worst case.
3. **Unknowns inflate estimates more than known difficulty.** A hard but well-understood
   task is more predictable than an easy but novel one.
4. **Estimates are not commitments.** Communicate ranges, not deadlines. If stakeholders
   need a single number, give the PERT expected plus a buffer for confidence level.
5. **Spike unknowns early.** If a single unknown dominates the estimate range, invest
   1-2 days spiking it before estimating the rest.

## Error Handling

| Problem                               | Resolution                                                                                          |
| ------------------------------------- | --------------------------------------------------------------------------------------------------- |
| Work item not decomposed              | Decompose into 3-8 tasks first (or suggest task-decomposer skill).                                  |
| No historical reference               | Estimate relative to a known task: "This is about 2x the auth feature."                             |
| Stakeholder wants a single number     | Provide PERT expected with buffer matching confidence level (High: +20%, Medium: +50%, Low: +100%). |
| Estimate seems too large              | Check for scope creep in task list. Remove non-essential tasks. Identify what can be deferred.      |
| Team has never done this type of work | Mark confidence as Low. Recommend a spike before committing to an estimate.                         |

## When NOT to Estimate

Push back if:

- The work is exploratory (research, spikes) — timebox instead of estimating
- Requirements are completely undefined — define scope first
- The user wants precision (hours) for a large project — provide ranges, not false precision
- The estimate will be used as a commitment without acknowledging uncertainty

Files in this skill

  • SKILL.md8 KB
  • evals/cases.yaml2 KB
  • references/calibration-tips.md4.4 KB
  • references/estimation-methods.md4 KB
  • references/sizing-heuristics.md5.4 KB
  • references/unknown-categories.md6.3 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.