Skip to content
Back to skills

Build

ASecurity

Use when developing a major feature: research the project, create a phased implementation plan, track progress and verify phase outcomes before declaring completion.

  • 8 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added November 7, 2026
developmenttesting

Security analysis

A100/100

Pro scans all 2 files and shows the line behind each finding

Scanned November 7, 2026

npx -y skills add huytran1120/vietnam-agentic-skills --skill build --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Build?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Build
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/huytran1120-build/badge)](https://www.skillsdirectory.com/skills/huytran1120-build)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: build
argument-hint: "[subcommand] [name]"
metadata:
  author: Shpigford
  version: "1.0"
description: "Use when developing a major feature: research the project, create a phased implementation plan, track progress and verify phase outcomes before declaring completion."
risk: critical
source: community
date_added: "2026-03-06"
---


Feature development pipeline - research, plan, track, and implement major features.

## Detailed Guide

Read [the detailed guide](references/detailed-guide.md) before executing this skill. It retains the complete procedure and reference material. Treat its safety, prerequisites, and validation requirements as mandatory. For focused work, load the relevant sections; for end-to-end work, read the guide completely.

## When to Use
- You need a structured workflow for building a major feature across research, planning, implementation, and tracking.
- The task involves moving a feature through named phases such as `research`, `implementation`, `progress`, or `phase`.
- You want one command to coordinate status, next steps, and phased delivery for a feature effort.

## Example

Input: `/build status export-csv` for an authorized project whose implementation
plan exists but whose CSV encoding test is still failing. Output: implementation
in progress, failed encoding test and the next repair step; the presence of three
planning files does not justify claiming the feature is complete. With no slash
command support, interpret “show the status of export-csv” the same way.

## Limitations
- Use this skill only when the task clearly matches the scope described above.
- Do not treat the output as a substitute for environment-specific validation, testing, or expert review.
- Validate feature IDs and destination containment before writing. Host-specific command and question tools are optional interfaces, not prerequisites.
- Read-only status/research does not authorize deployment; existing plans and unrelated work must be preserved.

Files in this skill

  • SKILL.md1.9 KB
  • references/detailed-guide.md18.3 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.