Startup Launch Day Playbook — Hour-by-hour execution checklist for your big launch day. Covers timezone timing, channel sequencing, real-time crisis management, and post-launch momentum. By @WeiYipei.
Scanned 9/12/2026
Install to Claude Code
npx -y skills add Gingiris-1031/gingiris-skills --skill startup-launch --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Startup Launch?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/gingiris-1031-startup-launch)More formats (shields.io, HTML) on the badges page.
---
name: startup-launch
description: |
Startup Launch Day Playbook — Hour-by-hour execution checklist for your big launch day. Covers timezone timing, channel sequencing, real-time crisis management, and post-launch momentum. By @WeiYipei.
source: https://github.com/Gingiris-1031/gingiris-skills/tree/main/skills/startup-launch
tags:
- startup-launch
- launch-strategy
- go-to-market
- gtm
- product-launch
- mvp
- traction
- first-users
- early-stage
- distribution
- claude-code
- ai-agent-skill
- agent-skill
- latest
---
## ⚠️ 区分 B2B 与 2C
本 skill 默认偏 dev / 开源 / B2B SaaS。若产品是 **2C 消费品 / 教育 / 应用 / 游戏**:核心指标换成 D1/D7/D30 留存、激活率、病毒系数 K(非 MRR/CAC/LTV);冷启动渠道换成垂类社区 / 短视频 / 垂直 KOL(非 PH/HN/LinkedIn)。完整 2C 适配指南 + 各国渠道公开数据见 → `gingiris-seo-geo/references/2c-adaptation.md`。
---
# Startup Launch Day Playbook — Hour-by-Hour Checklist
> 🌍 **Language / 语言**: [中文](#中文版) | [English](references/en/README.md) | [日本語](references/ja/README.md) | [한국어](references/ko/README.md)
## 📦 Install
```bash
clawhub install startup-launch
```
**What you get after installing:**
- Hour-by-hour execution plan from T-12h to 72h post-launch
- Coordinated multi-channel activation sequence
- Crisis management playbook (site down, negative feedback, competitor attacks)
---
Your launch day is ONE shot. This playbook gives you an hour-by-hour execution plan so nothing falls through the cracks. From T-minus-12-hours prep to the 72-hour post-launch sprint.
## What You'll Learn
- T-12h: Final checks (servers, links, payment, copy)
- Hour 0: Coordinated channel activation sequence
- Hours 1-6: Real-time monitoring and engagement tactics
- Hours 6-24: Second-wave amplification
- 72-hour post-launch momentum playbook
- Crisis management (site down, negative feedback, competitor attacks)
## Who This Is For
- Founders with a launch date already set
- Teams who have the product ready but need execution confidence
- Anyone who's been burned by a disorganized launch before
## Traffic Engineering for Launch Day (2026 field addendum)
### Plan the day as arithmetic, not vibes
Fix a total-visits target, then reverse-engineer per-channel quotas — each with its own UTM short link and a named owner. Anonymized reference (an AI Agent product, late 2025): a 500K-visit launch day was assembled as ~400K from 40 creator quote-tweets, plus ~20K each from Reddit threads, geo-targeted YouTube ads, and messaging-group distribution. Final tally: ~800 signups at $6.25 per registration. The lesson cuts both ways — traffic is buildable to spec; conversion is the bottleneck you can't buy.
### Sequencing patterns worth stealing
- **Split objectives across two days**: half your amplifiers push the website on day one, the other half push the leaderboard (PH, etc.) on day two. One day, one goal — otherwise the streams dilute each other.
- **Burst window**: get 50–100 creators publishing inside the same 24–48h. Algorithms reward density, not totals.
- **Platform relay** (from the Manus/Devin post-mortems): days 0–3, X/Twitter builds the conversation → days 3–10, YouTube and newsletters consolidate it → day 10+, Reddit/HN carry the long tail. For a big launch, concentrate ~80% of spend on the same day.
### Hacker News: the 30-minute verdict
The front page is decided in the first half hour — roughly 30 points and 10 comments, posted during the US morning window. Flat at minute 40 = done. Bring 2–3 prepared angles (a "Show" post, an open-source-alternative link, a how-it-works writeup) rather than one perfect post, and translate the winner for regional dev forums — one text, two communities.
### Readiness gate
Don't set the date until **at least 10 external developers are satisfied and still actively using the product**. Pre-launch time split: 60% talking to users, 40% preparing the launch — start asset prep once the product hits "60 points," copy first, visuals later.
---
Built by Gingiris — orchestrated 30+ launches with combined 100k+ first-day visitors.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!