Deliver multi-file changes in thin vertical slices — implement, test, verify, commit, repeat. Load when implementing a feature from a plan, building across more than one file, refactoring, or when tempted to land a large change in one pass. Also triggers on "incremental implementation", "vertical slice", "thin slice", "one slice at a time", "don't do it all at once". Routes single-file fixes to direct execution. Pairs with test-driven-development and git-workflow-and-versioning.
Scanned 9/11/2026
Install to Claude Code
npx -y skills add dvy1987/agent-loom --skill incremental-implementation --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Incremental Implementation?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/dvy1987-incremental-implementation)More formats (shields.io, HTML) on the badges page.
---
name: incremental-implementation
description: >
Deliver multi-file changes in thin vertical slices — implement, test, verify,
commit, repeat. Load when implementing a feature from a plan, building across
more than one file, refactoring, or when tempted to land a large change in one
pass. Also triggers on "incremental implementation", "vertical slice",
"thin slice", "one slice at a time", "don't do it all at once". Routes
single-file fixes to direct execution. Pairs with test-driven-development and
git-workflow-and-versioning.
license: MIT
metadata:
author: dvy1987
version: "1.2"
category: project-specific
sources: addyosmani/agent-skills incremental-implementation (11/12, 2026-05-29), obra/superpowers verification-before-completion + executing-plans (Phase 4 merge)
resources:
references:
- examples.md
---
# Incremental Implementation
You ship multi-file work as a sequence of small, working slices. Each slice leaves the repo buildable and tests green.
## Hard Rules
Never write more than ~100 lines without running the project's test command.
Never mix unrelated concerns in one slice (feature + refactor + deps = separate slices).
Never expand scope beyond the current task — note adjacent issues; do not fix them.
Never skip verify because "you'll test at the end."
After each slice: test → verify → commit (see `git-workflow-and-versioning`).
---
## Workflow
### Step 1 — Confirm slice plan
Read the approved plan or task. Pick **one** slice: the smallest end-to-end path (vertical slice preferred). State what's in scope and explicitly out of scope for this slice.
### Step 2 — Implement one slice
Build only that slice. Prefer the simplest thing that could work — no abstractions before the third real use case.
### Step 3 — Test and verify
Run the project's test command. Run build/typecheck/lint if the change could affect them. Do not re-run the same command on unchanged code.
### Step 4 — Commit and pick next slice
Commit with a descriptive message (`git-workflow-and-versioning`). If the slice came from a saved plan, tick its checkbox in the plan file before moving on — the plan is the durable progress record across sessions. Repeat Steps 2–4 until the task is done.
### Step 5 — End-to-end check
Identify the exact verify command (test/build/lint), run it fresh, and read its actual output — never report "done" or "tests pass" from memory or assumption. Full test suite, build clean, feature matches spec/plan. Report slices completed and commits made.
---
## Slicing strategies
| Strategy | When |
|----------|------|
| **Vertical slice** (default) | One complete path through stack (e.g. create → API → UI) |
| **Contract-first** | Parallel FE/BE — define API contract first, then implement each side |
| **Risk-first** | Prove the riskiest integration before surrounding code |
---
## Gotchas
- A bug in slice 1 invalidates slices 2–5 — test each slice.
- "While I'm here" refactors belong in a separate commit, not this slice.
- Feature flags beat long-lived branches for incomplete user-visible work.
- Agents that skip verify to save time usually cost more time in debugging.
---
## Common Rationalizations
| Excuse | Reality |
|--------|---------|
| "I'll test everything at the end" | Failures compound; you won't know which slice broke. |
| "Faster to do it all at once" | Until one of 500 lines is wrong and you can't bisect. |
| "Too small to commit" | Small commits are free; giant commits are expensive to revert. |
| "I'll add the feature flag later" | Incomplete features must not be user-visible without a flag. |
| "Let me run tests again for reassurance" | Re-run only after code changed since last green run. |
| "It should pass now" | Claims of done require a fresh command run and read output — not a prediction. |
---
## Output Format
```markdown
## Incremental implementation — [task/slug]
Slices planned: N | Completed: N
Current slice: [name] — [in scope / out of scope]
Verification:
- Tests: [command] → [pass/fail]
- Build: [command] → [pass/fail/skip]
Commits: [list or "pending user commit policy"]
Next slice: [one line] | Done
```
---
## Examples
<examples>
<example>
<input>Implement task creation from the plan — DB, API, and UI.</input>
<output>
Slice 1 only: POST /tasks + migration + minimal form. Out of scope: list/edit/delete.
After `npm test` passes → commit `feat: add task creation endpoint and form`.
Next slice: list tasks.
</output>
</example>
</examples>
---
## Verification
- [ ] Slice scope stated before coding
- [ ] Tests run for slice
- [ ] Commit advised after verification
- [ ] Traceability to plan tasks
## Red Flags
- Slice shipped without tests while later slices depend on it
- While-I-am-here refactor bundled into feature slice
- Long-lived branch used instead of flag for partial UX
- Slice boundary unclear — spans unrelated subsystems
## Prune Log
Last pruned: 2026-07-09
- Added evidence-before-claims verify gate + plan-checkbox ticking (agent-loom Phase 4, obra/superpowers)
## Impact Report
```
Task: [slug] | Slices: N/M | Last verify: [pass/fail]
Commits: [count] | Scope expansions noted: [count]
```
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!