Skip to content
Back to skills

Verification Before Completion

ASecurity

Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always

  • 26 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added May 26, 2026
developmentrustgobashexpressdebuggingdocumentation

Security analysis

A100/100

Scanned May 27, 2026

npx -y skills add DollarDill/beads-superpowers --skill verification-before-completion --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Verification Before Completion?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Verification Before Completion
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/dollardill-verification-before-completion/badge)](https://www.skillsdirectory.com/skills/dollardill-verification-before-completion)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: verification-before-completion
description: Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always
---

# Verification Before Completion

## Overview

Claiming work is complete without verification is dishonesty, not efficiency.

**Core principle:** Evidence before claims, always.

**Violating the letter of this rule is violating the spirit of this rule.**

## The Iron Law

```
NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE
```

If you haven't run the verification command in this message, you cannot claim it passes.

## The Gate Function

```
BEFORE claiming any status or expressing satisfaction:

1. IDENTIFY: What command proves this claim?
2. RUN: Execute the FULL command (fresh, complete)
3. READ: Full output, check exit code, count failures
4. VERIFY: Does output confirm the claim?
   - If NO: State actual status with evidence
   - If YES: State claim WITH evidence
5. ONLY THEN: Make the claim
6. CLOSE: If this verification gates a bead closure, run `bd close <id> --reason "description with evidence from step 4"`

Skip any step = lying, not verifying
```

## Common Failures

| Claim | Requires | Not Sufficient |
|-------|----------|----------------|
| Tests pass | Test command output: 0 failures | Previous run, "should pass" |
| Linter clean | Linter output: 0 errors | Partial check, extrapolation |
| Build succeeds | Build command: exit 0 | Linter passing, logs look good |
| Bug fixed | Test original symptom: passes | Code changed, assumed fixed |
| Regression test works | Red-green cycle verified | Test passes once |
| Agent completed | VCS diff shows changes | Agent reports "success" |
| Requirements met | Line-by-line checklist | Tests passing |

## Red Flags - STOP

- Using "should", "probably", "seems to"
- Expressing satisfaction before verification ("Great!", "Perfect!", "Done!", etc.)
- About to commit/push/PR without verification
- Trusting agent success reports
- Relying on partial verification
- Thinking "just this once"
- Tired and wanting work over
- **ANY wording implying success without having run verification**

## Rationalization Prevention

| Excuse | Reality |
|--------|---------|
| "Should work now" | RUN the verification |
| "I'm confident" | Confidence ≠ evidence |
| "Just this once" | No exceptions |
| "Linter passed" | Linter ≠ compiler |
| "Agent said success" | Verify independently |
| "I'm tired" | Exhaustion ≠ excuse |
| "Partial check is enough" | Partial proves nothing |
| "Different words so rule doesn't apply" | Spirit over letter |

## Key Patterns

**Tests:**
```
✅ [Run test command] [See: 34/34 pass] "All tests pass"
❌ "Should pass now" / "Looks correct"
```

**Regression tests (TDD Red-Green):**
```
✅ Write → Run (pass) → Revert fix → Run (MUST FAIL) → Restore → Run (pass)
❌ "I've written a regression test" (without red-green verification)
```

**Build:**
```
✅ [Run build] [See: exit 0] "Build passes"
❌ "Linter passed" (linter doesn't check compilation)
```

**Requirements:**
```
✅ Re-read plan → Create checklist → Verify each → Report gaps or completion
❌ "Tests pass, phase complete"
```

**Agent delegation:**
```
✅ Agent reports success → Check VCS diff → Verify changes → Report actual state
❌ Trust agent report
```

## Why This Matters

From 24 failure memories:
- your human partner said "I don't believe you" - trust broken
- Undefined functions shipped - would crash
- Missing requirements shipped - incomplete features
- Time wasted on false completion → redirect → rework
- Violates: "Honesty is a core value. If you lie, you'll be replaced."

## When To Apply

**ALWAYS before:**
- ANY variation of success/completion claims
- ANY expression of satisfaction
- ANY positive statement about work state
- Committing, PR creation, task completion
- Moving to next task
- Delegating to agents

**Rule applies to:**
- Exact phrases
- Paraphrases and synonyms
- Implications of success
- ANY communication suggesting completion/correctness

## Beads Completion

`bd close` without fresh verification evidence is lying. Before closing any bead:
1. Run the verification command that proves the work is done
2. Annotate the bead with evidence: `bd note <id> "test output: 14 passed, 0 failed"`
3. Include the summary in the `--reason` flag
4. Only then execute `bd close`

Use `bd note` to attach detailed evidence (test output, diff stats, verification logs) to the bead before closing. The `--reason` flag is the summary; `bd note` is the full evidence trail.

A bead closed without evidence is worse than a bead left open — it corrupts the ledger.

If you discovered something reusable, capture it before closing:

```bash
# Only if worth preserving for future sessions:
bd remember "lesson: <what was learned during this task>"
```

## The Bottom Line

**No shortcuts for verification.**

Run the command. Read the output. THEN claim the result.

This is non-negotiable.

## Integration

**Invoked by:** Any task claiming completion — mandatory before `bd close`, commits, or PRs.

**Pairs with:**
- **systematic-debugging** — verify the fix worked before claiming success.
- **document-release** — docs audit is part of completion evidence.
- **write-documentation** — prose quality checks are completion evidence.
- **stress-test** — stress-test validates designs; this skill validates implementations.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.