Protect power equipment and power cabling for the system from damage and destruction.
Scanned 9/3/2026
Install to Claude Code
npx -y skills add CyberStrikeus/CyberStrike --skill PE-9_power-equipment-and-cabling --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of PE 9 Power Equipment And Cabling?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/cyberstrikeus-pe-9-power-equipment-and-cabling)More formats (shields.io, HTML) on the badges page.
---
name: "PE-9_power-equipment-and-cabling"
description: "Protect power equipment and power cabling for the system from damage and destruction."
category: "configuration"
version: "5.2.0"
author: "cyberstrike-official"
tags:
- nist
- sp800-53
- rev5
- pe-9
- pe
tech_stack:
- any
cwe_ids: []
chains_with:
- PE-4
prerequisites: []
severity_boost:
PE-4: "Chain with PE-4 for comprehensive security coverage"
---
# PE-9 Power Equipment and Cabling
## High-Level Description
**Family:** Physical and Environmental Protection (PE)
**Framework:** NIST SP 800-53 Rev 5
Organizations determine the types of protection necessary for the power equipment and cabling employed at different locations that are both internal and external to organizational facilities and environments of operation. Types of power equipment and cabling include internal cabling and uninterruptable power sources in offices or data centers, generators and power cabling outside of buildings, and power sources for self-contained components such as satellites, vehicles, and other deployable systems.
## What to Check
- [ ] Verify PE-9 Power Equipment and Cabling is documented in SSP
- [ ] Confirm control is operating effectively
- [ ] Review evidence of continuous monitoring for PE-9
## How to Test
### Step 1: Review Documentation
Examine the System Security Plan (SSP) and related artifacts for PE-9 implementation details. Verify the organization has documented how this control is satisfied.
### Step 2: Validate Implementation
```
# For cloud environments, use cloud-audit-mcp tools
# For on-premises, review system configurations directly
# Example: Check if account management policies exist
grep -r "account.management\|access.control" /etc/security/ 2>/dev/null
```
### Step 3: Test Operating Effectiveness
Verify the control is actively functioning, not just documented. Check logs, configurations, and operational evidence.
## Tools
| Tool | Purpose | Usage |
| ------------- | --------------------------------- | ----- |
| Manual Review | Documentation and interview-based | N/A |
## Remediation Guide
### Control Statement
Protect power equipment and power cabling for the system from damage and destruction.
### Implementation Guidance
Organizations determine the types of protection necessary for the power equipment and cabling employed at different locations that are both internal and external to organizational facilities and environments of operation. Types of power equipment and cabling include internal cabling and uninterruptable power sources in offices or data centers, generators and power cabling outside of buildings, and power sources for self-contained components such as satellites, vehicles, and other deployable systems.
## Risk Assessment
| Finding | Severity | Impact |
| ------------------------------------------------ | -------- | ------------------------------------------------ |
| PE-9 Power Equipment and Cabling not implemented | Medium | Physical and Environmental Protection |
| PE-9 partially implemented | Low | Incomplete Physical and Environmental Protection |
## CWE Categories
| CWE ID | Title |
| ------ | --------------------- |
| N/A | No direct CWE mapping |
## References
- [NIST SP 800-53 Rev 5 - PE-9](https://csrc.nist.gov/projects/cprt/catalog#/cprt/framework/version/SP_800_53_5_1_1/home?element=pe-9)
- [NIST SP 800-53A Rev 5 (Assessment Procedures)](https://csrc.nist.gov/pubs/sp/800/53/a/r5/final)
- [NIST SP 800-53 Rev 5 Full Catalog](https://csrc.nist.gov/pubs/sp/800/53/r5/upd1/final)
## Checklist
- [ ] Control documented in SSP
- [ ] Implementation evidence collected
- [ ] Operating effectiveness validated
- [ ] Continuous monitoring in place
- [ ] Related controls (PE-4) reviewed
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!