Provide an alternate power supply for the system that is activated [organization-defined] and that can maintain minimally required operational capabil
Scanned 9/3/2026
Install to Claude Code
npx -y skills add CyberStrikeus/CyberStrike --skill pe-11-1-alternate-power-supply-minimal --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Pe 11 1 Alternate Power Supply Minimal?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/cyberstrikeus-pe-11-1-alternate-power-supply-minimal)More formats (shields.io, HTML) on the badges page.
---
name: "PE-11(1)_alternate-power-supply-minimal-operational-capability"
description: "Provide an alternate power supply for the system that is activated [organization-defined] and that can maintain minimally required operational capabil"
category: "configuration"
version: "5.2.0"
author: "cyberstrike-official"
tags:
- nist
- sp800-53
- rev5
- pe-11-1
- pe
- enhancement
tech_stack:
- any
cwe_ids: []
chains_with: []
prerequisites:
- PE-11
severity_boost: {}
---
# PE-11(1) Alternate Power Supply — Minimal Operational Capability
> **Enhancement of:** PE-11
## High-Level Description
**Family:** Physical and Environmental Protection (PE)
**Framework:** NIST SP 800-53 Rev 5
Provision of an alternate power supply with minimal operating capability can be satisfied by accessing a secondary commercial power supply or other external power supply.
## What to Check
- [ ] Verify PE-11(1) Alternate Power Supply — Minimal Operational Capability is documented in SSP
- [ ] Confirm control is operating effectively
- [ ] Review evidence of continuous monitoring for PE-11(1)
- [ ] Verify enhancement builds upon base control PE-11
## How to Test
### Step 1: Review Documentation
Examine the System Security Plan (SSP) and related artifacts for PE-11(1) implementation details. Verify the organization has documented how this control is satisfied.
### Step 2: Validate Implementation
```
# For cloud environments, use cloud-audit-mcp tools
# For on-premises, review system configurations directly
# Example: Check if account management policies exist
grep -r "account.management\|access.control" /etc/security/ 2>/dev/null
```
### Step 3: Test Operating Effectiveness
Verify the control is actively functioning, not just documented. Check logs, configurations, and operational evidence.
## Tools
| Tool | Purpose | Usage |
| ------------- | --------------------------------- | ----- |
| Manual Review | Documentation and interview-based | N/A |
## Remediation Guide
### Control Statement
Provide an alternate power supply for the system that is activated [organization-defined] and that can maintain minimally required operational capability in the event of an extended loss of the primary power source.
### Implementation Guidance
Provision of an alternate power supply with minimal operating capability can be satisfied by accessing a secondary commercial power supply or other external power supply.
## Risk Assessment
| Finding | Severity | Impact |
| -------------------------------------------------------------------------------- | -------- | ------------------------------------------------ |
| PE-11(1) Alternate Power Supply — Minimal Operational Capability not implemented | Medium | Physical and Environmental Protection |
| PE-11(1) partially implemented | Low | Incomplete Physical and Environmental Protection |
## CWE Categories
| CWE ID | Title |
| ------ | --------------------- |
| N/A | No direct CWE mapping |
## References
- [NIST SP 800-53 Rev 5 - PE-11(1)](https://csrc.nist.gov/projects/cprt/catalog#/cprt/framework/version/SP_800_53_5_1_1/home?element=pe-11.1)
- [NIST SP 800-53A Rev 5 (Assessment Procedures)](https://csrc.nist.gov/pubs/sp/800/53/a/r5/final)
- [NIST SP 800-53 Rev 5 Full Catalog](https://csrc.nist.gov/pubs/sp/800/53/r5/upd1/final)
## Checklist
- [ ] Control documented in SSP
- [ ] Implementation evidence collected
- [ ] Operating effectiveness validated
- [ ] Continuous monitoring in place
- [ ] Related controls (none) reviewed
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!