Heuristic search-based temporal planning and scheduling for complex multi-constraint environments
Scanned 9/11/2026
Install to Claude Code
npx -y skills add curiositech/windags-skills --skill hsts-planning-scheduling --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Hsts Planning Scheduling?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/curiositech-hsts-planning-scheduling)More formats (shields.io, HTML) on the badges page.
---
license: Apache-2.0
name: hsts-planning-scheduling
description: Heuristic search-based temporal planning and scheduling for complex multi-constraint environments
category: Research & Academic
tags:
- planning
- scheduling
- constraint-satisfaction
- temporal-reasoning
- space-systems
---
# SKILL.md: HSTS — Integrated Planning & Scheduling
Wisdom from Muscettola's HSTS framework for building intelligent systems that unify planning (what to do) and scheduling (when/how to do it). Activates when designing constraint-based agents, solving resource allocation problems, building robust execution systems, or reasoning about commitment under uncertainty.
## DECISION POINTS
### Decision 1: Unified vs. Separated Planning/Scheduling
```
IF domain has resources with time-varying availability
AND causal goals interact with resource constraints
AND execution environment is uncertain
→ Use unified state variable approach
→ Model as evolving constraint network
IF problem is purely causal (no resource contention)
→ Classical planning may suffice
IF problem has fixed task structure with only temporal constraints
→ Classical scheduling may suffice
IF you see "planner feeds into scheduler" architecture
→ QUESTION: Is the seam creating coordination debt?
```
### Decision 2: Commitment Level Selection
```
FOR each variable binding decision:
IF decision is reversible AND more information is coming
→ Post ordering constraint only
→ Example: "A before B" instead of "A at 10:00, B at 11:30"
IF decision resolves high-contention bottleneck (measured via simulation)
→ Commit to specific value now
→ Example: Assign spacecraft antenna to high-priority download
IF tempted to fix exact times early in search
→ STOP: Can ordering relation achieve same progress?
→ Preserve temporal flexibility for executor
```
### Decision 3: Search Focus Priority
```
BEFORE resolving any disjunction:
1. Run stochastic simulation on current partial solution
2. Sample 100+ paths without resolving open choices
3. Count conflicts per resource-time pair
4. Focus next decision on highest-contention resource
IF search is thrashing (many backtracks, little progress)
→ You're attacking non-bottleneck variables first
→ Re-estimate contention distribution
→ Switch to highest-conflict resource
```
### Decision 4: Domain Modeling Approach
```
IF domain has objects with internal state evolving over time
→ Model each as state variable with transition graph
→ Example: Satellite antenna {idle, tracking, downloading, slewing}
IF domain has shared resources (consumable/reusable)
→ Model resource levels as state variables
→ Track availability windows, not just capacity numbers
IF expert rules exist ("X and Y can't overlap during Z")
→ Encode as compatibility constraints
→ NOT as search pruning hacks
```
## FAILURE MODES
### Anti-Pattern 1: "Nominal Trajectory Planning"
**Detection Rule**: If schedule output is sequence of exact times/actions with no flexibility
**Root Cause**: Confusing schedule with execution plan; over-committing temporal decisions
**Symptom**: Any runtime deviation requires full replanning
**Fix**: Output behavioral envelopes (constraint networks) not nominal sequences
**Timeline**: Becomes critical when execution uncertainty > 5% of plan duration
### Anti-Pattern 2: "Premature Value Commitment"
**Detection Rule**: If binding variables to specific values before constraints force it
**Root Cause**: Not distinguishing between progress and commitment
**Symptom**: Search space artificially shrunk; solutions exist but aren't found
**Fix**: Post weakest constraint that enables progress; commit only when forced
**Timeline**: Shows up immediately in search statistics (solution quality drops)
### Anti-Pattern 3: "Bottleneck Ignorance"
**Detection Rule**: If resolving disjunctions without measuring which matter most
**Root Cause**: Treating all constraints as equally important
**Symptom**: Search thrashing on easy variables while hard constraints fester
**Fix**: Use stochastic simulation to estimate conflict probability before each decision
**Timeline**: Becomes exponentially worse as problem size grows
### Anti-Pattern 4: "Constraint Network Bloat"
**Detection Rule**: If propagation time grows quadratically with problem size
**Root Cause**: Not respecting module boundaries; monolithic constraint posting
**Symptom**: Solver becomes unusably slow on realistic problems
**Fix**: Decompose into state variable modules; make interaction topology explicit
**Timeline**: Hits performance wall around 50-100 activities
### Anti-Pattern 5: "Expert Knowledge as Hardcoded Heuristics"
**Detection Rule**: If domain knowledge exists as ad-hoc search pruning rules
**Root Cause**: Encoding constraints implicitly instead of declaratively
**Symptom**: Knowledge invisible to debugging; doesn't compose across modules
**Fix**: Express expert rules as formal compatibility constraints with causal semantics
**Timeline**: Maintenance nightmare emerges when domain complexity grows
## WORKED EXAMPLES
### Example 1: Satellite Mission Planning
**Scenario**: Mars orbiter with 2 instruments (camera, spectrometer), 1 antenna, 4 GB storage. Plan 8-hour observation session with data downlink.
**Novice Approach**:
1. Plan observation sequence first
2. Schedule exact start times
3. Add downlink at end
*Fails when storage constraint discovered late*
**Expert HSTS Approach**:
1. Model state variables: storage_level, antenna_state, instrument_states
2. Run stochastic simulation: storage fills to 95% probability by hour 3
3. **Decision**: Storage is bottleneck, not antenna time
4. Commit to downlink at hour 3 (value commitment for bottleneck)
5. Leave observation ordering flexible (constraint posting for non-bottleneck)
6. Output: behavioral envelope with storage invariant + flexible observation sequence
**Alternative Path Shown**: If simulation revealed antenna conflicts instead of storage, would commit to antenna schedule first, leave storage management flexible.
### Example 2: Manufacturing Job Shop
**Scenario**: 5 jobs, 3 machines, delivery deadlines. Machine M2 has 50% uptime, others 90%.
**Novice Approach**: Schedule assuming all machines available; handle breakdowns reactively.
**Expert HSTS Approach**:
1. Model machine_availability as time-varying state variable
2. Stochastic simulation: M2 unavailable 40% of time slots
3. **Trade-off Analysis**:
- Option A: Route critical jobs around M2 (safer, longer makespan)
- Option B: Use M2 with backup plans (shorter nominal, replanning risk)
4. **Decision**: Critical path jobs avoid M2; non-critical use M2 with ordering constraints only
5. Output: schedule robust to M2 failures without pessimistic assumption about availability
**What Expert Catches**: M2 unreliability creates secondary bottleneck at other machines when jobs reroute. Plans for cascade effects.
## QUALITY GATES
Schedule is valid and complete when:
- [ ] All state variables have legal transitions throughout timeline
- [ ] No resource oversubscription in any sampled execution path
- [ ] All goals reachable within temporal flexibility bounds
- [ ] Bottleneck resources identified with >90% confidence via simulation
- [ ] Constraint network admits multiple execution paths (not nominal trajectory)
- [ ] Module interactions explicit and bounded in complexity
- [ ] Search focused on measured conflicts, not assumed priorities
- [ ] Expert domain knowledge encoded as testable compatibility constraints
- [ ] System degrades gracefully under 20% execution deviation
- [ ] Computational cost scales linearly with number of state variables
**Automated Validation Signals**:
- Stochastic simulation runs complete without contradiction
- Constraint propagation converges in bounded time
- Multiple distinct solutions exist in final envelope
- Module coupling metrics within acceptable bounds
## NOT-FOR BOUNDARIES
**This skill should NOT be used for**:
- Pure optimization problems without temporal/resource constraints → Use mathematical programming instead
- Real-time reactive control → Use control theory instead
- Simple project management with known task durations → Use critical path method instead
- Problems where optimal solution required → Use complete search methods instead
- Domains where expert knowledge unavailable → Use machine learning approaches instead
**Delegation Rules**:
- For route planning: use `path-planning-algorithms` instead
- For resource allocation without time: use `constraint-satisfaction-methods` instead
- For predictive analytics: use `time-series-forecasting` instead
- For execution monitoring: use `plan-execution-monitoring` instead
**Boundary Signals**: If you're spending more effort encoding the domain than solving instances, consider whether classical OR methods might suffice for your use case.Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.