Builds depletion models with production decline, reserve replacement economics, and terminal value analysis for finite-life assets. Use when modeling depletion, analyzing resource longevity, or evaluating reserve life economics.
Scanned 9/12/2026
Install to Claude Code
npx -y skills add CaseMark/skills --skill modeling-resource-depletion-economics --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Modeling Resource Depletion Economics?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/casemark-modeling-resource-depletion-economics)More formats (shields.io, HTML) on the badges page.
---
name: modeling-resource-depletion-economics
language: en
description: Builds depletion models with production decline, reserve replacement economics, and terminal value analysis for finite-life assets. Use when modeling depletion, analyzing resource longevity, or evaluating reserve life economics.
tags:
- modeling
- real-assets-and-natural-resources
metadata:
author: casemark
practice_areas:
- Natural Resources
- Energy Capital
- Commodity Investment
document_types:
- Financial Model
skill_modes:
- Modeling
- Forecasting
---
# Modeling Resource Depletion Economics
Builds depletion models with production decline, reserve replacement economics, and terminal value analysis for finite-life assets.
## When To Use
- Valuing oil & gas properties, mining concessions, or timber tracts where asset life is bounded by extractable reserves
- Forecasting production revenue streams under hyperbolic, exponential, or harmonic decline assumptions
- Evaluating reserve replacement economics — whether infill drilling, secondary recovery, or exploration capex extends economic life at acceptable returns
- Calculating terminal/salvage value and asset retirement obligations (ARO) for finite-life assets
- Stress-testing resource investments against commodity price, decline rate, and cost escalation scenarios
## Inputs To Gather
- **Reserve estimates**: Proved (1P), proved + probable (2P), and contingent resource volumes with classification basis (SEC, PRMS, NI 51-101) [VERIFY classification standard used]
- **Current production rates**: Recent monthly/quarterly production data (BOE/d, tons/month, MBF/year as applicable)
- **Decline curve parameters**: Initial decline rate (Di), b-factor (hyperbolic exponent), and minimum decline rate (Dmin) if using modified hyperbolic
- **Commodity pricing**: Strip pricing, flat-price assumptions, or escalation model; specify real vs. nominal terms
- **Operating costs**: LOE/per-unit lifting costs, royalties/overriding royalties, severance/ad valorem taxes [VERIFY applicable fiscal regime]
- **Capital program**: Maintenance capex, development capex schedule, and reserve replacement investment plan
- **Discount rate / WACC**: Risk-adjusted rate appropriate to resource type and jurisdiction
- **ARO / reclamation costs**: Plugging & abandonment, mine closure, or reforestation obligations with timing estimates
## Workflow
1. **Establish reserve base and production profile**
- Classify reserves by category (PDP, PDNP, PUD, probable, possible)
- Fit decline curves to historical production; select decline model (exponential for mature assets, hyperbolic for unconventional, harmonic where warranted)
- Set economic limit — production rate at which net revenue equals operating cost
2. **Build revenue forecast**
- Apply production volumes to commodity price deck on a per-period basis
- Account for product mix (oil/gas/NGL ratios, ore grade variation over mine life)
- Incorporate hedging or contract pricing if applicable
3. **Layer in cost structure**
- Fixed vs. variable opex separation; apply per-unit variable costs to production schedule
- Schedule development capex tied to reserve category conversion (PUD → PDP)
- Include royalty burdens, production taxes, and income tax modeling [VERIFY royalty/tax rates by jurisdiction]
4. **Model reserve replacement economics**
- For each tranche of replacement capex, calculate incremental reserves added, F&D cost ($/BOE or $/ton), and recycle ratio (netback ÷ F&D)
- Compare recycle ratios against hurdle (typically >1.5× for conventional, >2.0× for unconventional) [VERIFY current market benchmarks]
- Determine whether reserve additions extend asset life beyond base decline or merely slow decline rate
5. **Calculate terminal value and ARO**
- Terminal value = salvage value of surface equipment + land residual − ARO obligation (discounted)
- For mining: include reclamation bonding costs and post-closure monitoring
- If perpetual tail production exists (e.g., low-rate stripper wells), capitalize at economic limit or apply a terminal multiple
6. **Run depletion and valuation**
- Compute unit-of-production depletion for each period: (period production ÷ remaining reserves) × depletable basis
- Generate PV-10 (undiscounted and at 10% per SEC convention) and NPV at project WACC
- Calculate reserve life index (RLI = reserves ÷ annual production) at each forecast point
7. **Sensitivity and scenario analysis**
- Vary commodity price (±20%, ±40%), decline rate (b-factor ±0.2), and opex escalation (CPI vs. oilfield-specific indices)
- Run breakeven analysis: minimum commodity price to achieve target IRR or positive NPV
- Tornado chart of top-5 value drivers ranked by impact on PV-10
## Output
The completed model should include:
- **Production forecast table**: Annual volumes by reserve category with cumulative depletion percentage
- **Cash flow waterfall**: Revenue → royalties → opex → capex → taxes → net cash flow, per period
- **Depletion schedule**: Unit-of-production depletion by period with remaining depletable basis
- **Reserve replacement summary**: F&D cost, recycle ratio, and incremental RLI per capex tranche
- **Valuation summary**: PV-10, NPV at WACC, IRR, and payback period
- **Sensitivity outputs**: Tornado chart, breakeven price, and scenario comparison table
- **Assumptions log**: Every key input with source, date, and [VERIFY] flags where data is uncertain
## Quality Checks
- Confirm cumulative production in forecast does not exceed total recoverable reserves (1P or 2P as specified)
- Verify decline curve fit against at least 12 months of historical production — flag assets with insufficient history
- Check that economic limit is correctly applied: no periods should show negative net operating income unless explicitly modeling pre-production or development phases
- Ensure depletion basis ties to acquisition/development cost less accumulated depletion and impairment
- Validate that PV-10 calculation uses pre-tax, pre-financing cash flows per SEC methodology when presented as PV-10 (vs. post-tax NPV)
- Cross-check RLI trajectory — if RLI is increasing while production declines, confirm reserve additions are the driver
- Confirm ARO timing is consistent with expected plug/abandonment or closure schedule, not artificially deferred
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.