**Recommendation: Extend Fieldbook to North and Islands in Q1, contingent on completing three system fixes before go-live.** Fieldbook has been live in four regions for two quarters and has delivered strong operational gains in adoption leaders Central and East: overtime is down 12%, fuel costs are down 9%, and technicians now complete 5.3 jobs per day (up from 4.6). The business case for extending to North and Islands is favorable if adoption matches Central/East's pace; however, South and W...
Scanned 9/19/2026
Install to Claude Code
npx -y skills add welltraum/minto --skill raw --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Raw?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/welltraum-raw-4e15e36f)More formats (shields.io, HTML) on the badges page.
# FIELDBOOK ROLLOUT — Q1 EXTENSION RECOMMENDATION
**Recommendation: Extend Fieldbook to North and Islands in Q1, contingent on completing three system fixes before go-live.**
Fieldbook has been live in four regions for two quarters and has delivered strong operational gains in adoption leaders Central and East: overtime is down 12%, fuel costs are down 9%, and technicians now complete 5.3 jobs per day (up from 4.6). The business case for extending to North and Islands is favorable if adoption matches Central/East's pace; however, South and West lagged significantly. Analysis shows the difference is driven by three fixable gaps that recurred across regions because the program had no early-feedback mechanism to close issues between launches. Closing these gaps before launch will replicate Central/East's economics.
## Three mandatory prerequisites for launch
**1. Restructure onboarding to replicate fast-adoption pattern**
Central and East reached 80%+ adoption within six weeks. West achieved only 71% after nine weeks. Root cause: a single classroom training session left technicians hired after the course to learn the platform second-hand from colleagues, slowing uptake. Regional coordinators improvised shadowing arrangements to compensate, consuming an estimated 380 technician-hours of lost route time in South and West combined.
Fix: Finalize the onboarding plan before launch using the model that succeeded in Central/East — ongoing support and flexible shadowing rather than a one-time classroom session.
Payoff: Replicates the fast adoption curve, preventing the 380+ technician-hour workaround costs that slow regions incurred.
**2. Activate asset-register integration to close the highest-impact support gap**
Fieldbook does not receive equipment service history from the legacy asset register, so technicians open each job without knowing prior service or warranty status. This missing data drives 19% of all support tickets (escalations and repeat searches) and causes 9% of jobs to include unnecessary parts replacements — parts already replaced under warranty within the past year.
Fix: Prioritize the nightly export request to the legacy asset register team (currently in their backlog since month two). The vendor integration is complete and ready; it requires only internal data-coordination decisions.
Payoff: Eliminates the majority of support volume tied to missing data and prevents warranty-related parts waste.
**3. Configure billing-code mapping with vendor to eliminate manual rework**
Job-completion codes in Fieldbook do not match the invoicing system, forcing the billing team to re-key approximately 300 job records per week by hand. This introduces transcription errors visible to customers on invoices, required hiring a temporary clerk (£8,400 for two quarters), and creates a 2–4% weekly variance that finance reconciles manually at month end.
Fix: Assign an integration owner to configure the billing-code mapping table. The vendor has confirmed this is a 1-day setup requiring no additional development.
Payoff: Eliminates manual re-keying, reduces billing errors, and simplifies finance reconciliation.
## Financial case with these fixes in place
Central and East demonstrate the model: operational savings (12% overtime reduction, 9% fuel cost reduction) deliver £30k/month recurring benefit, exceeding the £13,500/month incremental licensing cost for new regions. Payback occurs within the second quarter of operation.
South and West reached break-even only because slow adoption extended payback to two quarters and generated unplanned labor costs (workaround shadowing). Without the three fixes above, North/Islands will follow West's pattern and the business case fails. With the fixes in place and adoption matching Central/East, the extension is financially justified.
## Next step
Approval to proceed with Q1 launch, with confirmation that these three actions will be prioritized, owned, and completed before go-live.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!