Compact live-execution checklist companion for approved GitHub issue work. Use during active implementation as a fast operational route; gh-work-execution remains the canonical source of truth.
Scanned 9/9/2026
Install to Claude Code
npx -y skills add vamseeachanta/workspace-hub --skill gh-work-execution-checklist --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Gh Work Execution Checklist?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/vamseeachanta-gh-work-execution-checklist)More formats (shields.io, HTML) on the badges page.
---
name: gh-work-execution-checklist
description: Compact live-execution checklist companion for approved GitHub issue work. Use during active implementation as a fast operational route; gh-work-execution remains the canonical source of truth.
version: 1.0.0
author: Hermes Agent
category: software-development
license: MIT
related_skills:
- gh-work-execution
- github-issues
- github-pr-workflow
tags: [execution, checklist, github, tdd, verification, review]
---
# GH Work Execution Checklist
Compact companion skill for live execution.
`gh-work-execution` is the canonical and authoritative route. Use this checklist to stay on-track during active work, not to replace the full route.
## Trigger notes
Use when:
- the issue is already planned and approved
- you need a fast execution checklist while working
- you want to keep GitHub updates, validation, and closeout disciplined
Do not use this instead of the canonical route when scope, delegation, policy, or closeout decisions are unclear.
## Live checklist
1. Entry gate
- Confirm the issue is approved for execution.
- Confirm repo/worktree/policy context is known.
- Confirm you know the intended validation path.
- Post a concise execution-start note if execution is proceeding.
- If approval, authz, environment, or validation path is missing: stop and route back per `gh-work-execution`.
2. Already-done check first
- Inspect the deliverable surface before changing code.
- Run the most relevant targeted validator/test.
- Check issue comments, linked PRs, and recent history if it may already be landed.
- Decide explicitly: `already done`, `not done`, or `uncertain`.
- If `already done`, post evidence and close from the verification-first path.
3. Central vs delegated decision
- Default to central unless ownership boundaries are crisp.
- Delegate only when owned paths, validators, GitHub authority, and integration ownership are explicit.
- Use hybrid only when recon/slices can be delegated safely but final integration stays central.
- If the decision changes execution ownership or reporting flow, post that change to GitHub.
4. TDD loop
- Write or update the failing targeted test first.
- Implement the smallest change that should pass.
- Run the narrowest relevant test loop.
- Refactor only after green.
- Repeat until acceptance is satisfied.
5. Targeted validation gate
- Run the specific tests/validators that prove the issue is done.
- Add broader validation only where risk or repo policy requires it.
- Capture exact evidence for GitHub and commit messaging.
- If validation is incomplete or ambiguous, do not advance.
6. Adversarial review gate
- Challenge the change like a skeptical reviewer.
- Check acceptance coverage, regressions, edge cases, and policy fit.
- Check whether new work should become a future issue instead of being absorbed.
- If non-trivial concerns remain, fix them and re-run validation.
7. Commit/push gate
- Confirm the diff matches approved scope.
- Confirm tests/validators used as evidence are still green.
- Commit with a message tied to the landed work.
- Push only after validation and review are complete.
- Post the landed summary and verification evidence to GitHub.
8. Closeout
- Close only when the issue is landed, or proven already satisfied/invalid with evidence.
- Link any future issues discovered during execution.
- Post concise final verification evidence.
- Leave the issue with a clear done-state, not an implied one.
## Operating note
When in doubt, stop using the checklist as a shortcut and return to `gh-work-execution` for the full decision framework, delegation rules, GitHub posting cadence, blocker handling, and closeout requirements.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!