Skip to content
Back to skills

Wiki Project Review

ASecurity

Stress-test an existing project's plan through a one-question-at-a-time interview before anything gets built. Use when the user says 'review this project', 'stress-test [project]', 'interview me about [project]', \"let's think through [project]\", 'poke holes in this plan', or wants to challenge a plan rather than just orient to it (that's wiki-project-open). Pairs with the plan approval gate — this is the skill that uses the moment where the plan exists and nothing has been built.

  • 5 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added September 5, 2026
ai-agentsgobash

Security analysis

A100/100

Scanned September 21, 2026

npx -y skills add Ulef1005/benchbook --skill wiki-project-review --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Wiki Project Review?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Wiki Project Review
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/ulef1005-wiki-project-review/badge)](https://www.skillsdirectory.com/skills/ulef1005-wiki-project-review)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: wiki-project-review
description: "Stress-test an existing project's plan through a one-question-at-a-time interview before anything gets built. Use when the user says 'review this project', 'stress-test [project]', 'interview me about [project]', \"let's think through [project]\", 'poke holes in this plan', or wants to challenge a plan rather than just orient to it (that's wiki-project-open). Pairs with the plan approval gate — this is the skill that uses the moment where the plan exists and nothing has been built."
maturity: tested
license: MIT
metadata:
  version: 1.0.0
---

# Wiki Project Review

## Purpose

Attack a plan while changing it is still free.

This is the counterpart to the plan approval gate in
`domains/projects/agents-domain-projects.md`. The gate creates a moment where the plan exists
and no code does. **This skill is what makes that moment useful** — without it, the gate is
just "please read the plan carefully," which is exactly what everyone already fails to do.

Your job here is **not** to help write the plan. It's to find what's wrong with it.

---

## Step 1 — Read everything first

Read the project page in full, plus every entity page it links under
`## Hard- and Software`. Do not start asking questions until you've read the lot — half the
weaknesses are visible on the page and asking about them wastes the user's attention.

### Also load the relation neighbourhood

```bash
./scripts/relations.py <slug>
```

The page tells you what the project says about itself; this tells you what the *rest of the wiki*
says about it — what it runs on, what backs it up, what already depends on it. Each fact is
stored once, on whichever page reads naturally, so half of a project's relations are never on its
own page.

This matters more here than anywhere else: **a stress-test that only reads the page can only
challenge the plan's internal logic, never its actual dependencies.** The best questions in a
review usually come from something the plan doesn't mention. Empty results are common and mean
nothing is recorded yet.

---

## Step 2 — Find the real weak points

Before asking anything, privately identify the 3–6 places this plan is most likely to fail.
Look for:

| Weakness | What it looks like |
|---|---|
| **Unstated assumption** | A phase that only works if something unverified is true |
| **Unjustified selection** | `## Hard- and Software` picks an option with no recorded reason, or with no alternatives listed at all |
| **Hidden dependency** | Phase 3 needs something no phase produces |
| **Undefined done** | No phase says how you'd know it worked |
| **Ordering risk** | The expensive, irreversible step comes before the cheap thing that would invalidate it |
| **Unpriced cost** | Money, time or ongoing maintenance nobody has estimated |
| **Silent scope** | The plan quietly grew past what `## Summary` claims |
| **Missing exit** | No stated condition under which you'd stop |

Rank them. Lead with the one most likely to sink the project.

---

## Step 3 — Interview, one question at a time

**One question per message. Always.** A numbered list of six questions gets one answer to the
first and a vague gesture at the rest.

For each:

1. Ask the question plainly
2. Say **why it matters** in one line — what breaks if the answer is bad
3. Offer 2–3 concrete options where they exist, with a recommendation
4. State how many questions remain

Push back on weak answers. A reflexive "yeah that'll be fine" on a load-bearing assumption is
the exact thing this skill exists to catch. Ask once more, concretely: *"what specifically
makes you confident about that?"*

Don't be nit-picky. If a concern is genuinely minor, note it and move on — burning the user's
patience on trivia means the important question lands on someone who's stopped reading.

---

## Step 4 — Record the outcome on the page

The interview is worthless if it evaporates into chat.

- **Answers that resolve something** → add to `## Open Questions` as `[x]` with the decision,
  or into the `## Hard- and Software` "Selected" reasoning
- **New problems found** → add as `[ ]` open questions
- **Plan changes agreed** → edit `## Plan / Phases`
- **Always** → append a `## Log` entry: what was reviewed, what changed, what's still open

Write the *reasoning*, not just the conclusion. "Chose B" is worth little in eight months;
"chose B because A needs a static IP we don't have" is worth an afternoon.

---

## Step 5 — Give a verdict

State plainly which of these applies:

- **Ready to approve** — remaining questions don't block starting
- **Not ready** — name the specific unresolved thing that blocks it
- **Should be reconsidered** — the review surfaced something that undermines the goal itself

That third outcome is a success, not a failure. A project abandoned at the plan stage costs an
hour. The same project abandoned in phase four costs a month — and the page will record why,
so it doesn't get re-proposed next year.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.