Skip to content
Back to skills

Dr Drill Runner

ASecurity

The full DR-drill discipline for one service: author the runbook (per-tier RTO + RPO), pre-drill checklist (data sync state, alert silencing, customer comms), drill workflow (announce, fail-over, verify, fail-back) with timestamps, the supervised run protocol (refuse without declared RTO/RPO or against production, RTO/RPO monitoring cadence, abort-on-breach), and an auditor-ready post-drill report. Backup-integrity verification (SHA-256 + signature, restore spot checks, cross-region replicati...

  • 10 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added October 12, 2026
testinggoawsterraformtestingsecurity

Security analysis

A100/100

Pro scans all 4 files and shows the line behind each finding

Scanned October 12, 2026

npx -y skills add testland/qa --skill dr-drill-runner --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Dr Drill Runner?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Dr Drill Runner
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/testland-dr-drill-runner/badge)](https://www.skillsdirectory.com/skills/testland-dr-drill-runner)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: dr-drill-runner
description: "The full DR-drill discipline for one service: author the runbook (per-tier RTO + RPO), pre-drill checklist (data sync state, alert silencing, customer comms), drill workflow (announce, fail-over, verify, fail-back) with timestamps, the supervised run protocol (refuse without declared RTO/RPO or against production, RTO/RPO monitoring cadence, abort-on-breach), and an auditor-ready post-drill report. Backup-integrity verification (SHA-256 + signature, restore spot checks, cross-region replication, retention, key recovery) and restore-time / RTO measurement (TTF segments, PITR latency, parallel-restore tuning, trend tracking) are worked in references. Per Google Cloud DR planning guide; covers cold / warm / hot standby tier-specific patterns. Use when a scheduled or post-incident failover drill for one service is being planned, executed, or written up, or when a new tier-1 service ships without a drill defined."
metadata:
  keywords: "disaster-recovery, dr-drill, rto, rpo, failover, runbook"
  version: "1.2.17"
---

# dr-drill-runner

Per the [Google Cloud DR planning guide], DR planning requires
"end-to-end recovery design addressing backup, restoration, and
cleanup procedures." Drills test that the procedure works AND that
the team can run it. Both surface different failures.

## When to use

- Quarterly DR drill (mandatory in compliance-heavy industries:
  banking, healthcare, defense).
- After a region-failover incident: rerun the drill with the
  lessons learned.
- New service onboarding: every new tier-1 service ships with its
  drill defined.

## Step 1 - Define RTO + RPO per service tier

Per the [Google Cloud DR planning guide]:

| Metric | Definition |
|---|---|
| RTO | Maximum acceptable length of time the application can be offline |
| RPO | Maximum acceptable data loss (time window) |

| Tier | Example RTO | Example RPO | Pattern |
|---|---|---|---|
| 1 (revenue-critical) | < 15 min | < 1 min | Hot standby (active-active) |
| 2 (customer-impacting) | < 4 hr | < 1 hr | Warm standby |
| 3 (internal) | < 24 hr | < 24 hr | Cold (rebuild from backup) |

Document per service in a service catalog; drills enforce the
contract.

## Step 2 - DR-pattern tier per service

Per the [Google Cloud DR planning guide]:

- **Cold**: Minimal preparation; recovery requires external
  intervention and extended downtime.
- **Warm**: Basic readiness with resources available; recovery
  stops normal ops temporarily.
- **Hot**: Continuous operation with built-in redundancy; minimal
  interruption.

Drill expectations differ:
- Cold: Test bring-up from backup (restore-time tests -
  [references/restore-time.md](references/restore-time.md)).
- Warm: Test failover automation + warm-up time.
- Hot: Test traffic redirection + sticky-session impact.

## Step 3 - Pre-drill checklist

```markdown
## Pre-Drill Checklist - `<service>` `<date>`

- [ ] Drill window scheduled (low-traffic; aligned with
      customer-comm window)
- [ ] Drill scope decided (region, single service, full app)
- [ ] Replication lag confirmed within RPO at T-30 min
- [ ] Monitoring alerts SILENCED for expected failure indicators
      (alert routing redirected to drill channel)
- [ ] On-call notified (avoid duplicate paging during drill)
- [ ] Customer comms sent if customer-impacting drill
- [ ] Rollback path documented (what triggers abort?)
- [ ] Drill commander assigned (owns go/no-go calls)
- [ ] Postmortem time scheduled (within 48hr of drill end)
```

Skipping the pre-drill = drills become incidents.

## Step 4 - Drill workflow

```markdown
## Drill Workflow

### T-0: Announce
- Post in #drill-channel; confirm all participants ready.
- Drill commander gives "GO" - record T-0 timestamp.

### T+0..N: Fail-over
- Execute the runbook step-by-step (everyone follows the doc; no
  improvisation).
- Capture timestamp of each step.

### Verify
- Run the verification suite (smoke + customer-impact + data integrity).
- Compare actual vs expected RTO; if RTO breached, decide:
  abort + rollback, or continue + capture learning.

### Fail-back
- If hot/warm: redirect traffic back to primary.
- If cold: tear down DR environment + restore primary.
- Verify primary is healthy before claiming drill complete.

### Cleanup
- Re-enable alerts (Step 3).
- Send "all clear" customer comms.
- Reconcile any drill-introduced data divergence.
```

## Step 5 - Post-drill report

```markdown
## Drill Report - `<service>` `<date>`

**Drill objective:** Verify warm standby fails over within RTO 4hr.

**Timeline:**
- T-30 min: Replication lag verified (52s - within RPO 1hr) ✓
- T-0: Announced, on-call silenced
- T+12m: Failover initiated
- T+47m: Standby took traffic
- T+1h22m: Verified service healthy on standby
- T+2h11m: Failback to primary
- T+3h05m: Drill complete

**RTO observed:** 1h22m (target: 4hr) ✓

**Issues found:**
1. CRITICAL: DNS TTL was 24hr in standby DNS records; users
   couldn't reach service for 23min after failover. Fix: lower
   TTL to 60s in standby zone before next drill.
2. MAJOR: Secret-manager copy step was undocumented; commander
   improvised. Fix: add Step 3.4 to runbook.
3. MINOR: One alert wasn't silenced in advance; on-call was paged.

**Action items (with owners + dates):**
- DNS TTL fix → @platform-team - 2026-05-20
- Runbook Step 3.4 → @sre - 2026-05-13
- Alert routing audit → @sre - 2026-05-13

**Next drill:** 2026-08-06 (quarterly cadence).
```

## Step 6 - Cold-tier-specific drill pattern

Cold drills = bring up from backup. Verifies:

- Backup is current within RPO ([references/backup-verification.md](references/backup-verification.md)).
- Restore time is within RTO ([references/restore-time.md](references/restore-time.md)).
- Infrastructure-as-code provisioning works (Terraform / CloudFormation /
  Bicep in DR account).
- Permissions + secrets are in place (per the [Google Cloud DR
  planning guide], "Permission and access validation in DR
  environments" + "Security synchronization").

## Step 7 - Hot-tier-specific drill pattern

Hot drills = redirect traffic between active replicas. Verifies:

- Health check propagation (load balancer detects standby is
  healthy).
- Sticky-session handling (do connections drain or break?).
- Cache warmup not required (or warmup time is within RTO).
- Cross-region replication lag stays within RPO during the drill.

## Step 8 - Cadence

| Tier | Cadence |
|---|---|
| 1 | Monthly (game-day style) |
| 2 | Quarterly |
| 3 | Annually |

Per the [Google Cloud DR planning guide]: "test it regularly,
noting any issues." Without cadence, runbooks rot.

## Run protocol (executing the drill end to end)

Nobody delegates failover execution; a human drill commander runs the five
stages below against this protocol. This is the **rehearsed** DR path - for
injecting unrehearsed failures see the `chaos-drill-protocol` skill in this plugin.

**Refuse to start when:**

- No declared RTO + RPO. Per the [Google Cloud DR planning guide], RTO is
  "the maximum acceptable length of time that your application can be
  offline" and RPO bounds acceptable data loss - without them there is no
  pass/fail criterion.
- The DR environment identifier matches `prod` / `production`.
- Any CRITICAL pre-drill item fails (backup integrity, key recovery, alert
  silencing) - halt and emit the blocking checklist instead of proceeding.

**Stage 1 - pre-drill.** Run the Step 3 checklist. Verify backup SHA-256
integrity, replication lag within RPO at T-30 min, and encryption-key
recoverability in the DR region per
[references/backup-verification.md](references/backup-verification.md).
Verify DR-environment configuration drift is within bounds - per the
[AWS DR testing whitepaper], "Manage configuration drift at the DR Region.
Ensure that your infrastructure, data, and configuration are as needed at
the DR Region."

**Stage 2 - failover.** Record T-0; execute the Step 4 runbook step by step,
capturing a timestamp per step. Per the [AWS DR testing whitepaper], "Our
experience has shown that the only error recovery that works is the path you
test frequently" - a runbook step that requires improvisation is logged as a
MAJOR finding immediately, never silently adapted.

**Stage 3 - RTO/RPO monitor.** While failover is active, sample on a fixed
interval (60 s is a workable default): replication lag at the DR side,
smoke-suite pass rate, and data-row spot checks. Measure time-to-functional
for the Restore + Verification segments per
[references/restore-time.md](references/restore-time.md) and compare against
the per-segment RTO budget. If observed TTF exceeds the RTO - abort the
failover, record the breach metrics, and skip directly to the report. Record
the peak RPO gap (replication lag at fail-over time); flag if it exceeds the
declared RPO.

**Stage 4 - fail-back.** Per Step 4: redirect traffic back (warm/hot) or
tear down + restore primary (cold), re-enable silenced alerts, send the all
clear, verify primary health before recording fail-back complete, reconcile
drill-introduced data divergence.

**Stage 5 - report.** Emit the Step 5 post-drill report, including the
observed TTF, total RTO, and peak RPO gap versus their declared targets.
Schedule the postmortem within 48 hours; every finding gets an owner + due
date before the drill closes.

[AWS DR testing whitepaper]: https://docs.aws.amazon.com/whitepapers/latest/disaster-recovery-workloads-on-aws/testing-disaster-recovery.html

## Anti-patterns

| Anti-pattern | Why it fails | Fix |
|---|---|---|
| Skip pre-drill checklist | Drill becomes incident | Step 3 mandatory |
| One person knows the runbook | Bus-factor 1; drill panics when they're out | Rotate drill commander |
| Skip post-drill report | Lessons lost; same issues recur | Step 5 mandatory + 48hr deadline |
| Test failover only; skip failback | Failback is the actual prod path; bugs hide | Step 4 covers both |
| Lower RTO target after a missed drill | Goalpost moving | Hold the line + invest in fixes |

## Limitations

- DR drills don't replace chaos engineering (this plugin's chaos skills) - they test rehearsed paths; chaos tests unrehearsed ones.
- Cloud-managed services may have built-in regional failover that
  bypasses your runbook; document boundaries.
- Some compliance regimes (FFIEC for banks) prescribe specific
  drill frequencies + scopes - verify per regulation.

## References

- [Google Cloud DR planning guide] - RTO / RPO / cold-warm-hot
  tiers / testing requirements
- [AWS DR testing whitepaper] - configuration-drift management,
  "test the path you execute" principle
- [references/backup-verification.md](references/backup-verification.md),
  [references/restore-time.md](references/restore-time.md) - drill
  prerequisites: backup integrity + RTO measurement
- `error-budget-tests` - incident
  metrics fed by drills (MTTR/MTBF schema in its references)

[Google Cloud DR planning guide]: https://docs.cloud.google.com/architecture/dr-scenarios-planning-guide

Files in this skill

  • .tessl-plugin/plugin.json1 KB
  • SKILL.md10.7 KB
  • references/backup-verification.md7.5 KB
  • references/restore-time.md9 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.