Specflo Plan

ASecurity

Use at a specflo project's plan phase, when turning a validated spec into a dependency-ordered, testable task plan before any code. Triggers include "write the plan", "break this into tasks", or `specflo status` showing the plan phase. Do NOT use for trivial fixes or before a spec has been validated.

  • 9 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added September 3, 2026
ai-agentsgo

Works with

  • cli

Security analysis

A100/100

Scanned September 29, 2026

npx -y skills add TacoTakumi/specflo --skill specflo-plan --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Specflo Plan?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Specflo Plan
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/tacotakumi-specflo-plan/badge)](https://www.skillsdirectory.com/skills/tacotakumi-specflo-plan)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: specflo-plan
description: Use at a specflo project's plan phase, when turning a validated spec into a dependency-ordered, testable task plan before any code. Triggers include "write the plan", "break this into tasks", or `specflo status` showing the plan phase. Do NOT use for trivial fixes or before a spec has been validated.
---

# plan

Drive a validated `spec.md` to a validated `plan.md` for the active project: a
synthesized approach, dependency-ordered `T-NN` tasks (each with behavioral
acceptance, a verification step, and `Implements: REQ-NN` traceability), and a
clean handoff toward execution. The CLI does the structured work (`specflo plan start`, `specflo task add`, `specflo validate plan`, `specflo advance`); this
skill carries the synthesis, decomposition judgement, and discipline.

## When to use

- At the **plan phase**, after a validated `spec.md`.
- **Synthesize, don't re-spec** — the spec captured *what* to build; the plan
  captures *in what order, and verified how*.

## When NOT to use

- Before a spec has been validated (`specflo validate spec` must pass).
- For trivial one-off fixes that don't warrant the pipeline.

## HARD-GATE

No implementation code until the plan is validated (`specflo validate plan`
passes) and the user approves. *"I'll just write the code"* → that's execution,
not planning.

## Process

1. **Preflight** — confirm an active project at the plan phase; run `specflo plan start` to create/locate `plan.md` (it prints the locator `<project>/plan`); **read the spec with `specflo doc show spec`** (the `REQ-NN`s + their
   acceptance + boundaries) and the brainstorm's architecture decisions (`specflo doc show brainstorm`) as input.
   Treat `spec.md` as read-only.
2. **Decompose into vertical slices** — each task is a thin, end-to-end,
   independently testable/reviewable deliverable. Reject horizontal layers.
   Split a task when it would take >2 h, needs >3 acceptance bullets, touches ≥2
   independent subsystems, or has "and" in its title.
3. **Shape each task** — a behavioral pass/fail **acceptance** criterion, a
   **verification** command/step, and `Implements: REQ-NN` (repeatable). Structure
   behavior-adding tasks as RED→GREEN (write the failing test first). Declare
   `Depends on` for ordering.
   **Decomposition rules (fan-out capable).** Every plan is shaped this way
   **regardless of** the project's execution mode, so an orchestrator could fan
   it out to subagents without replanning — and a linear run loses nothing:
   - **Files.** List every file a task edits in `--files`; the CLI parses it
     into the task's ownership set (a trailing parenthetical note per entry is
     allowed: `~/x/y (venv, outside repo)`).
   - **Shared files get an edge.** Wherever two tasks **share a file**, add a
     `--depends-on` edge so they never run at once; `specflo validate plan`
     warns naming the pair when you miss one.
   - **Parallel producers, one merge.** Give tasks that produce results in
     parallel their own per-task output files, then add one deterministic
     **merge task** that depends on all of them — never have producers append
     to a shared file.
   - **Contract first.** Order the task that fixes a **contract** (schema, wire
     format, interface) before the tasks on either side of it, so both sides
     can proceed against it at once.
   - **Pools.** Declare hardware and shared environments (a GPU, a venv, a
     port) with `--needs <pool>` and size them with `specflo pool add <name>
     --size N`; an undeclared pool has one slot.
   - **User in the loop.** Mark a task that needs the user (a by-eye verdict,
     a desktop session) with `--needs user`; it is never delegated.
4. **Capture inline** — run `specflo task add` with `--text … --acceptance … --verify … --from REQ-NN [--from REQ-NN …] [--depends-on T-NN …] [--files …] [--needs <pool> …]` the moment each task
   lands (un-batched). **Emit artifact-writing add calls sequentially: one at a
   time, never batched in parallel.** The CLI's advisory lock (D-01) makes
   concurrent adds safe but cannot fix ordering — minted `T-NN`/`M-NN` IDs follow
   execution order, so parallel emission can record IDs out of authoring order.
   Keep Approach / Global constraints / Open questions / Canonical refs updated
   with `specflo section set plan "<section>" --file <path>` (or `--stdin`): it
   replaces that one section's body and leaves every task and milestone
   untouched (Tasks, Milestones, and Pools are refused there — they belong to
   their own verbs).
5. **Scope-reduction guard** — the plan delivers what each `REQ-NN`/`D-NN`
   requires; never silently degrade to "v1 / simplified / for now / a stub." On
   genuine overflow, recommend a phase split or a superseding requirement. Clear
   `specflo validate plan` scope-reduction warnings before advancing.
6. **Coverage by construction** — every active `REQ-NN` is implemented by ≥1 task,
   and every task cites ≥1 live `REQ-NN`. Aim for this so `specflo validate plan` passes first try.
7. **Self-review** — coverage both ways, no placeholders, dependencies ordered and
   acyclic, ≤~5 files per task, every task has acceptance + verification.
8. **Readiness + phase boundary** — get an explicit user **"ready?"**, then
   `specflo validate plan` → fix issues + address warnings → re-validate. Then
   **pause at the boundary, don't auto-advance**: the plan is complete and
   validated, the **checkpoint is saved** (the project's `checkpoint.md`; resume any
   time with `specflo checkpoint`), so this is a **safe place to clear context**.
   `specflo advance` (moves `plan → execute`) is the user's to call — **wait** for
   their go; don't start executing tasks yourself.

   **Auto-mode carve-out.** The pause-and-wait above is the *manual* default.
   Under an opt-in `specflo auto` run, the auto-mode bootstrap's **boundary
   override** (marked `== specflo auto-mode bootstrap ==`) supersedes it — once
   the phase validates, advance across `brainstorm → spec → plan → execute` on
   your own without pausing here. This carve-out applies only under that
   bootstrap; absent it, pause as above.

## Milestones

Group the plan's tasks into ordered **milestones** — user-verifiable slices —
when it spans more than a couple. The CLI owns every milestone mechanic
(document-order sequence, rollup, the current milestone, the boundary beat); this
skill only directs *authoring*, so reference the commands rather than restating
that logic:

- Author each milestone with an **Exit checklist** (what proves the slice works):
  `specflo milestone add --text "Auth works" --exit "login" --exit "logout"`.
- Assign **every** task to a milestone — `--milestone M-NN` on `specflo task add`,
  or `specflo task set-milestone T-NN M-NN` after the fact. Once milestones
  exist, `specflo validate plan` flags any unassigned task, requires milestone
  dependencies to point backward, and checks the per-milestone `REQ-NN` union
  covers the spec.
- Milestones are **optional**: a plan with zero milestones stays dormant and
  behaves exactly as today — add them only when they earn their keep.

## Correcting and annotating tasks

Never hand-edit `plan.md` — the CLI owns it. While a task is not yet done, fix a
wrong field with `specflo task edit T-NN` (`--title`, `--acceptance`,
`--verify`, `--scope`, `--files`, `--needs`, `--implements`, and the repeatable
`--add-depends-on` / `--drop-depends-on`), rather than rewriting the entry by
hand or minting a near-duplicate task. Prose sections go through
`specflo section set plan "<section>"`; entries go through the task, milestone,
and pool verbs; nothing goes through an editor.

Record the reasoning behind a change — why an approach was dropped, what a
review resolved — with `specflo task note T-NN --text "…" --label Design`. The
labels are a closed set: `Note` (the default), `Design`, `Resolution`,
`Descoped`; `Edit` is reserved for `task edit --force`.

Once a task is done its entry is history: annotate it with `task note`, or
replace the work with `specflo task add --supersedes T-NN`. A superseded entry
is frozen.

## Fast level

When `specflo status` shows `Level: fast`, this skill runs short:

- **You make the decisions.** At most 3, recorded with `specflo decision add`.
  For each, weigh 2 or 3 approaches, pick one, and put the approaches weighed
  and why you chose that one in the `--rationale`.
- **Do not interview the user,** and **do not pause** at the phase boundary:
  once the phase validates, run `specflo advance` and go on, from brainstorm to
  spec to plan.
- **Deferred work** goes in the brainstorm's Out of scope / Deferred section.
- **Caps:** 3 decisions and 7 tasks. A cap only warns: finish the work already
  recorded, add no more, and put new work in the brainstorm's Out of scope /
  Deferred section. Do not move the project up; the user chose fast.
- **Targeted Verify.** Each task's `--verify` runs the tests that task adds or
  changes: a test file, a test ID or a `-k` filter, not the whole suite. A
  bare `uv run pytest` is the whole suite. The execute skill runs the full
  suite once, after the last task.
- **One approval, before execute.** When the plan validates, stop. Show the
  user `specflo doc show brief` and list every choice you made that they have
  not seen: each decision, and any requirement or task beyond what they asked
  for. Run `specflo advance` into execute only after they approve.

Keep to 3 to 7 tasks; skip milestones.

## Anti-sycophancy

Do not open with "Great plan!", "You're absolutely right", or similar. State the
plan's gaps plainly. A plan that hides a coverage hole to seem agreeable is worse
than no plan.

## Rationalizations

| Rationalization | Reality |
|---|---|
| "The spec is enough." | The spec says *what*; the plan says *in what order, verified how*. |
| "I'll just write the code." | That's execution, not planning — **HARD-GATE**. |
| "This task is obvious; skip the acceptance." | Every task carries a pass/fail criterion by construction. |
| "Ship a simplified version for now." | Deliver what the requirement needs, or split — don't silently reduce scope. |
| "Every task is one big slice." | Prefer many thin vertical slices over few thick ones. |

## Red flags

- A task with no `Implements: REQ-NN`, or an active requirement no task covers.
- Acceptance criteria that are not pass/fail, or a task with no verification step.
- Horizontal layer tasks ("all the models", "all the endpoints") instead of
  end-to-end slices.
- Dependency edges that form a cycle, or that reference a non-existent task.

## Verification

Before declaring the plan ready:

- [ ] `specflo validate plan` exits 0 (bidirectional coverage holds; every task has acceptance + verification; dependencies resolve and are acyclic).
- [ ] Every prose section was written with `specflo section set`, never by editing the file.
- [ ] Any `specflo validate plan` warnings are addressed or justified.
- [ ] The user has explicitly approved the plan.
- [ ] Then, and only then, surface the checkpoint-saved phase-end beat and leave `specflo advance` to the user.

Attribution