Review calibration control so instruments used for acceptance are in date, and out-of-date tools are not used. Use when the user mentions calibration, gage control, instrument due, calibration overdue, or asks for a calibration control note. Manufacturing and quality skill by Yasir Jilani.
Scanned 9/30/2026
npx -y skills add SYasJ/claude-business-skills --skill calibration-control --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Calibration Control?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/syasj-calibration-control)More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.
---
name: calibration-control
description: "Review calibration control so instruments used for acceptance are in date, and out-of-date tools are not used. Use when the user mentions calibration, gage control, instrument due, calibration overdue, or asks for a calibration control note. Manufacturing and quality skill by Yasir Jilani."
license: MIT
compatibility: Agent Skills standard. No network access, extra packages, or credentials required.
metadata:
author: Yasir Jilani
version: "1.0.0"
domain: manufacturing
---
<!-- GENERATED FILE - edits here are overwritten by scripts/generate.py.
Edit the 'calibration-control' entry in source/, then run:
python3 scripts/generate.py && python3 scripts/validate.py
See CONTRIBUTING.md. -->
# Calibration Control
Review calibration control so instruments used for acceptance are in date, and out-of-date tools are not used.
## When to use this skill
Use this skill when the user:
- calibration
- gage control
- instrument due
- calibration overdue
## When not to use this skill
- The user wants a different domain's specialist skill.
- The task requires a licensed professional to decide, and the user only needs a referral note rather than a draft.
- The request asks you to deceive, evade a control, or hide material facts.
## Professional boundary
Quality and safety procedures are drafts for the site's quality system. Do not bypass a hold, calibration, or safety step.
## Operating boundaries
- Use only information the user provides or files they explicitly ask you to read. Do not invent metrics, laws, citations, prices, credentials, or clinical facts.
- Do not ask for passwords, API keys, tokens, seed phrases, one-time codes, or payment card data.
- Do not send data to an external service, install packages, or add network calls as part of this skill.
- Separate facts, assumptions, and recommendations. If a required input is missing, state the assumption or ask one focused question.
- If the user asks you to deceive a person, evade a control, forge a record, or cause harm, stop. Offer a legitimate alternative.
- Work product that affects money, employment, health, safety, or legal rights is a draft for a qualified human to review before it is used.
## Inputs to collect
- The instrument list
- Due dates they have
- What the instrument accepts
- The quarantine practice
## Workflow
### 1. Step 1
Flag overdue instruments used for acceptance.
### 2. Step 2
Quarantine is the default they stated, or recommend it if they have none.
### 3. Step 3
Do not calculate a new calibration interval from memory.
### 4. Step 4
Record the last result they supplied.
### 5. Step 5
Assess impact only if they know the instrument was used while overdue. Do not invent affected lots.
### 6. Step 6
Name the owner of the recall or the review.
## Output
Deliver a **calibration control note**.
- Purpose of this calibration control note, in two sentences.
- Facts the user supplied, listed separately from assumptions.
- The work itself, in the structure the workflow names.
- Open questions, risks, and the single next action with an owner.
- What a qualified reviewer still needs to confirm, if the domain is regulated.
## Quality bar
- Every number, date, name, and citation came from the user or is marked as an assumption.
- The artifact can be used without reading this skill again.
- Recommendations are specific enough that someone could accept or reject them.
- Boundaries were respected: no credentials requested, no unsupported professional claim, no deception.
## Example
### Scenario
Gus Moretti, plant manager at Redline Parts in Nisku, needs a calibration control note by 30 September 2026. A caliper used for final accept is two months overdue and still on the bench.
### Example data
```text
From: Gus Moretti, plant manager
Organization: Redline Parts, Nisku
Date: 14 September 2026
Needed by: 30 September 2026
A caliper used for final accept is two months overdue and still on the bench.
The instrument list: Line 2; Lot 26-0914; Gauge 7
Due dates they have: 30 September 2026
What the instrument accepts: Gauge 7, last reviewed 14 September 2026. No owner named since
The quarantine practice: Line 2, recorded 14 September 2026. No supporting file attached
```
### Example outcome
**Calibration control note**
To: Gus Moretti, plant manager, Redline Parts
Date: 14 September 2026 · Needed by: 30 September 2026
**Decision**
Quarantines it and asks for a use review rather than inventing which lots moved.
**What the file supports**
| Input | Value | Status |
| --- | --- | --- |
| The instrument list | Line 2; Lot 26-0914; Gauge 7 | Needs confirmation |
| Due dates they have | 30 September 2026 | Carried into the draft |
| What the instrument accepts | Gauge 7, last reviewed 14 September 2026. No owner named since | Carried into the draft |
| The quarantine practice | Line 2, recorded 14 September 2026. No supporting file attached | Needs confirmation |
**How this draft was built**
**1. Flag overdue instruments used for acceptance**
**2. Quarantine is the default they stated, or recommend it if they have none**
**3. Do not calculate a new calibration interval from memory**
**4. Record the last result they supplied**
**5. Assess impact only if they know the instrument was used while overdue. Do not invent affected lots**
**Deliberately not done**
- Using an overdue gage for acceptance.
- An invented interval.
- Invented affected lots.
**Open items for a human**
- Confirm every row marked *Needs confirmation* above before this leaves draft.
- Anything absent from the file stayed absent. No figure, date, or name was supplied from outside it.
Next: Gus Moretti by 30 September 2026. This is a draft, not a sign-off.
## Anti-patterns
- Using an overdue gage for acceptance
- An invented interval
- Invented affected lots
## Related skills
- `incoming-inspection`
- `nonconformance-report`
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!