Guides preparation of a data room population plan from deal materials, requiring critical review of the request list for errors, separate tracking of contracts with assignment or change-of-control restrictions, distinction between copyleft and permissive open-source licenses, board minute redaction protocol, and resolution of instruction conflicts.
Scanned 9/11/2026
Install to Claude Code
npx -y skills add sunyifeisb-art/legalwork --skill scenario-01 --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Scenario 01?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/sunyifeisb-art-scenario-01-a51c86dc)More formats (shields.io, HTML) on the badges page.
---
name: draft-data-room-population-plan-s01
task_id: corporate-ma/draft-data-room-population-plan/scenario-01
description: Guides preparation of a data room population plan from deal materials, requiring critical review of the request list for errors, separate tracking of contracts with assignment or change-of-control restrictions, distinction between copyleft and permissive open-source licenses, board minute redaction protocol, and resolution of instruction conflicts.
activates_for: [planner, solver, checker]
---
# Skill: Draft Data Room Population Plan (Scenario 01)
## 1. Subject-matter triage
- Treat the assignment as a sell-side VDR population plan for an acquisition, not a generic document checklist.
- Start from the DDRL, org chart, contract inventory, prior deal indices, and partner instructions; reconcile them against each other before drafting the plan.
- If the materials point to multiple entity levels, business lines, or document owners, enumerate them first and assign collection responsibility separately rather than using one blended pass.
- Preserve the deal team’s practical objectives: populate the room, surface corrections, and flag pre-closing process items that need separate tracking.
## 2. Failure modes the skill is correcting
- Following the request list mechanically without checking whether an item is misstated, misplaced, or inconsistent with the transaction.
- Collapsing consent-sensitive contracts into the main collection workflow instead of maintaining a separate consent-tracking workstream.
- Treating open-source risk as a single bucket instead of separating copyleft components from permissive-license components.
- Uploading board minutes without a pre-upload redaction review for privileged, strategic, or otherwise sensitive content.
- Ignoring conflicts between partner instructions and the request list instead of flagging them for resolution before the VDR opens.
- Missing shareholder-consent coordination as a deal-execution item that must be tracked alongside, but not inside, the document-population plan.
- Writing a generic upload list without assigning owners, deadlines, and priority order tied to the expected opening and closing sequence.
## 3. Legal frameworks / domain conventions that apply
- Request-list validation: the request list is a starting point, not an error-free source; review it critically and correct obvious factual or deal-structure mismatches before collection begins.
- Anti-assignment and change-of-control restrictions: contracts containing consent requirements should be tracked separately because they may require third-party approvals before closing; use a dedicated consent tracker with owner, outreach step, and deadline.
- Open-source licensing: distinguish copyleft licenses from permissive licenses; where proprietary software may be combined with copyleft components, require an audit to identify source-disclosure or distribution-trigger risk, while permissive licenses are generally lower-friction.
- Board-minute privilege and sensitivity review: board minutes often contain merger discussions, legal advice, litigation strategy, and projections; they should be reviewed and redacted by counsel before upload.
- Instruction hierarchy: if a supervising lawyer directs that a document be withheld or handled specially, that instruction controls over a rote request-list item until the conflict is resolved.
- Shareholder consent rights: consent solicitation is a transaction-management task, not merely a collection task; assign a responsible person and a timing plan.
- Standard VDR taxonomy: organize by conventional M&A folders, typically corporate, financial, intellectual property, material contracts, employment, real estate, regulatory and environmental, litigation, insurance, and transaction-specific supplements.
## 4. Analytical scaffolds
- Build the plan in two layers:
1. the folder architecture and collection schedule; and
2. a separate issues / exceptions tracker.
- For each requested category, test whether the item is:
- correctly described for this deal,
- complete for all relevant entities or periods,
- sensitive enough to require redaction or withholding,
- subject to consent, approval, or external rights,
- better handled in a separate tracker rather than the main room.
- For each contract that may require consent, capture:
- contract identifier and business owner,
- why consent may be needed,
- who must pursue the consent,
- what needs to happen before upload versus before closing,
- whether the item should be listed in the room pending consent or withheld until cleared.
- For software / technology materials, run a targeted license screen:
- inventory relevant codebases, libraries, and dependencies,
- identify copyleft items separately from permissive items,
- flag any mixed-use area where proprietary and open-source components interact,
- note whether a follow-up technical/legal review is needed before disclosure.
- For board minutes, create a redaction protocol:
- identify custodian and reviewing lawyer,
- specify that redactions are approved before upload,
- distinguish redaction from withholding,
- keep an audit trail of the basis for redaction.
- For instruction conflicts, state:
- the instruction,
- the conflicting request-list item,
- the proposed resolution path,
- whether the item should be deferred, redacted, or withheld.
- For each issue or exception, attach a severity level using one consistent ordinal scale defined at the outset, and include the practical consequence for the VDR plan.
## 5. Vertical / structural / temporal relationships
- Separate pre-upload tasks from pre-closing tasks; do not let consent solicitation, counterparty outreach, or shareholder approvals disappear into the document-collection schedule.
- Track entity-level documents by relevant vertical: parent, subsidiaries, and business units, with special attention to any non-domestic entities or gaps in the org chart.
- Preserve the sequence: validate request list, assign collection owners, screen for sensitive materials, run consent and open-source reviews, then finalize the upload sequence.
- If the expected VDR opening date is known, work backward from it to set collection deadlines, review deadlines, and escalation points.
- If a document is both responsive and sensitive, identify the governing action order: review first, redact or clear next, upload last.
## 6. Output structure conventions
- Use an industry-conventional plan, not a rubric-shaped checklist.
- Begin with a concise summary of the VDR approach, scope assumptions, and any request-list corrections.
- Include a folder architecture section organized by standard M&A categories.
- Include a collection matrix or schedule showing document category, owner, reviewer, deadline, and status.
- Include a separate exceptions / issues section with an ordinal severity label for each entry.
- Include a dedicated consent-tracking subsection for anti-assignment, change-of-control, and shareholder-consent items.
- Include a dedicated open-source subsection that distinguishes copyleft from permissive components.
- Include a board-minutes redaction protocol subsection before the upload plan.
- Include an instruction-conflict subsection identifying any partner-instruction conflicts and proposed resolution.
- End with an action list that assigns next steps to specific roles and ties them to the VDR-opening or closing timeline.
- Keep the plan operational: every flagged item should tell the team what to do next, who owns it, and when it must happen.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!