Skip to content
Back to skills

Promo Case Glue

ASecurity

Use when a glue-heavy engineer needs a promo packet framing it as technical leadership. Trigger phrases include "promotion case for glue work", "I do a lot of glue work how do I get promoted", "frame my non-code work for promotion", "my manager says I need more technical accomplishments", "I'm a glue person how do I get senior". Mode of `report-promo-case`.

  • 7 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 22, 2026
toolsgodocumentation

Security analysis

A100/100

Scanned September 22, 2026

npx -y skills add shrwnsan/vibekit-claude-plugins --skill promo-case-glue --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Promo Case Glue?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Promo Case Glue
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/shrwnsan-promo-case-glue/badge)](https://www.skillsdirectory.com/skills/shrwnsan-promo-case-glue)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: promo-case-glue
description: Use when a glue-heavy engineer needs a promo packet framing it as technical leadership. Trigger phrases include "promotion case for glue work", "I do a lot of glue work how do I get promoted", "frame my non-code work for promotion", "my manager says I need more technical accomplishments", "I'm a glue person how do I get senior". Mode of `report-promo-case`.
---

# Promotion Case for Glue-Heavy Engineers

Build a promotion-ready case for engineers whose impact is glue work — coordination, documentation, unblocking — that rarely reads as technical.

Apply when: manager wants more technical accomplishments but time goes to unblocking and onboarding; biggest impacts are non-code; told "we don't see you as an engineer"; or the team would collapse without the glue but the committee doesn't count it.

Skip when: clear code/design/production impact (use `report-promo-case` directly); management/TPM track; or the ladder excludes glue from senior IC criteria — change the perception or pivot.

**Prerequisite:** run `glue-audit` first — the case builds on its glue inventory.

## The interview flow

### 1. Ladder context
Ask target level (Senior/Staff/Principal) and whether they have the ladder. Typical dimensions: Technical Fluency, Delivery, Architecture, Leadership, Mentorship, Business Impact, Cross-functional Influence. Map glue onto these.

### 2. Glue inventory review
Read the latest `glue-audit` file; confirm top 5–7 tasks by impact and time. Per task: the *outcome*, what broke without it, who benefited, metrics moved, artifacts.

### 3. Reframe glue as technical leadership
Glue work is *already* technical leadership — it needs translating.

| Glue task | Technical leadership frame |
|---|---|
| Onboarding | Ramp N→M weeks; onboarding system; 3 mentored to first ship |
| Documentation (ADRs, runbooks) | Knowledge capture; lower bus factor |
| Design review | Architecture gate; prevented a P0 |
| Unblocking | Cross-team orchestration; killed a 3-week bottleneck |
| Process improvement | Rollbacks down X%; faster reviews |
| Cross-team alignment | Integration ownership; no duplicate work |
| Mentorship | Capability building; retention; multiplied output |
| Incident coordination | Reliability ownership; blameless postmortem |
| Hiring interviewer | Calibration; fewer false negatives |

Write: *"Not 'just documentation' — system design clarity that prevented divergent implementations."*

### 4. Artifact mining
Per item, collect: design docs, onboarding docs, alignment threads, postmortems citing them; metrics (ramp time, review cycles, rollback rate); testimonials (Slack quotes). Build an "Artifacts" section.

### 5. Narrative construction — three acts
1. **The problem:** gaps in [onboarding, design quality, alignment] caused [slow ramp, rework, incidents].
2. **The intervention:** glue tasks framed as *owning* the problem, with the technical decisions made.
3. **The outcome:** quantified results — done *as an engineer* through technical leadership, not project management.

### 6. Pre-bunk the "not technical enough" objection
- *"Impact isn't technical enough"* → "[N] hours of wasted engineering prevented, [metric] moved X% — outcomes at the coordination layer."
- *"Not enough code"* → "I improved the conditions under which code gets written; ladders value impact."
- *"This is project management"* → "PMs coordinate timelines; I solved technical problems — designed onboarding, set standards, caught gaps."

Write these into "Q&A prep" verbatim.

### 7. Manager advocacy guide
For the user's manager: calibration emphasis, artifacts to surface, how to answer "was this promotable?", defusing "soft skills", and the ask: "Tell the committee: X's glue work is why Y happened."

## Output structure

Write to `~/haku-work-reflections/promo-cases/<level>-glue-<name>-<date>.md`:

```markdown
---
candidate: [name]
target_level: Senior | Staff | Principal
period: [date range]
summary: "[one-sentence impact claim]"
---

# Promotion Case: [Name] — [Target Level]
## TL;DR
[Dimensions evaluated, glue as vehicle, headline numbers.]

## Evidence by ladder dimension
Per dimension: **Task**, **What I did**, **Outcome** (quantified), **Artifacts**, **Why senior**.

## Quantitative summary
[Hours/week on glue; attributable outcomes; visibility.]

## Artifacts collected
[List with paths or descriptions]

## The glue narrative
[150 words: "My technical contribution is making the team effective…"]

## Q&A prep
[The three objection/response pairs from step 6.]

## Manager guidance
[Calibration language, artifacts, the direct ask.]

## Risks & mitigations
[Still "not technical enough" → Plan B: rebalance glue vs. core
(`boundary-negotiation`), but try this narrative first.]
```

## Operating principles

- **Frame glue as technical leadership, not "soft skills."** *Coordination* not *communication*; *system design* not *documentation*; *quality gate* not *code review*.
- **Visibility is half the battle.** No artifacts → start collecting for next cycle.
- **Don't invent impact** — the story is stronger honest.
- **Target the ladder's rubric language**, not vague "seniority."
- **Allow honest "not promotable here" conclusions** — if the company doesn't value glue at IC level, help the user see that.

## Composition with other skills

- **`glue-audit`** — prerequisite; consumes its output.
- **`report-promo-case`** — parent; route or compose.
- **`user-profile`** — level and company context.
- **`wins-log`** — log glue wins; cross-reference.
- **`boundary-negotiation`** — Plan B if the user wants to reduce glue.

## Anti-patterns to flag

- **"I helped a lot"** — too vague; force outcomes and artifacts.
- **Sole credit for shared glue** — acknowledge collaborators.
- **Tasks without technical framing** — "I onboarded Bob" → "I cut ramp from 6 weeks to 3."
- **Ignoring the actual ladder** — if it demands production code, say so.
- **Waiting for promo season to collect artifacts.**

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.