Design and implement a weekly Business Plan Review (BPR) meeting structure with color-coded status reporting, consistent format, and clear rules for team alignment.
Scanned 9/8/2026
Install to Claude Code
npx -y skills add sethmblack/paks-skills --skill business-plan-review-design --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Business Plan Review Design?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/sethmblack-business-plan-review-design)More formats (shields.io, HTML) on the badges page.
---
name: business-plan-review-design
description: Design and implement a weekly Business Plan Review (BPR) meeting structure with color-coded status reporting, consistent format, and clear rules for team alignment.
license: MIT
metadata:
author: sethmblack
version: 1.0.3519
repository: https://github.com/sethmblack/paks-skills
keywords:
- business-plan-review-design
- comedy
- transformation
- writing
---
# Business Plan Review Design
Design and implement a weekly Business Plan Review (BPR) meeting structure with color-coded status reporting, consistent format, and clear rules for team alignment.
**Token Budget:** ~800 tokens (this prompt). Reserve tokens for output generation.
---
## Constitutional Constraints (NEVER VIOLATE)
**You MUST refuse to:**
- Design review processes intended to micromanage or surveil employees
- Create status reporting systems designed to punish transparency
- Build meeting structures that exclude key stakeholders
- Design processes that weaponize information against team members
**If asked to create a punitive review process:** Refuse explicitly. Explain that effective BPR systems celebrate transparency and mobilize help.
---
## When to Use
- User needs to establish regular team or organizational status reviews
- Current meetings lack structure, consistency, or clear status visibility
- User asks "How should we run status meetings?"
- Teams need better visibility into project or initiative progress
- Transitioning from ad-hoc updates to systematic review
---
## Inputs
| Input | Required | Description |
|-------|----------|-------------|
| **team_scope** | Yes | Size and structure of team/organization (e.g., "12-person engineering team", "cross-functional product org") |
| **initiatives** | Yes | Key initiatives, projects, or areas to track |
| **frequency** | No | Desired meeting frequency (default: weekly) |
| **duration** | No | Available meeting time (default: 60-90 minutes) |
| **constraints** | No | Time zones, existing meeting load, cultural considerations |
**Input Validation:**
- `team_scope`: Must describe people who will attend. Minimum 3 people for BPR value.
- `initiatives`: At least 3 trackable items to justify structured review.
---
## Workflow
### 1. Define Status Reporting Structure
Create color-coded status definitions tailored to context:
| Color | Definition | Example Criteria |
|-------|------------|------------------|
| Green | On plan, no help needed | Meeting milestones, within budget, no blockers |
| Yellow | At risk, have a plan | Slight delays, identified risks with mitigation plans |
| Red | Off plan, need help | Blocked, missed milestones, no clear path forward |
**Key principle:** Red is the best color because it means we can help.
### 2. Design Meeting Agenda Template
Standard BPR agenda:
### Step 1: **Context Setting** (5 min) - Business environment, recent developments
### Step 2: **Status Review** (bulk of time) - Each initiative reports color + one-line status
### Step 3: **Help Requests** (as needed) - Red items get "Who can help?" response
### Step 4: **SAR Scheduling** (5 min) - Complex items move to Special Attention Reviews
### Step 5: **Close** (5 min) - Summary of actions, next meeting confirmation
### 3. Establish Meeting Rules
Essential rules for psychological safety:
### Step 1: Same time, same place, same format every meeting
### Step 2: Attendance is mandatory; no one is more important than alignment
### Step 3: No side conversations; respect the process
### Step 4: No humor at anyone's expense; safety is paramount
### Step 5: Status only; debates happen in SARs
### Step 6: Start on time, end on time
### Step 7: Information is never used as a weapon
### Step 8: Celebrate transparency, especially reds
### 4. Define SAR Criteria
Special Attention Reviews (SARs) are scheduled when:
- An item needs more than 2 minutes of discussion
- Multiple stakeholders need to collaborate on a solution
- A red item requires deep problem-solving
- Cross-functional coordination is needed
### 5. Create Facilitation Guide
The facilitator role:
- Keep meeting on time and on format
- Respond to every red with "Thank you for the transparency. Who can help?"
- Prevent blame or criticism; redirect to problem-solving
- Ensure SAR scheduling for complex items
- Model expected behaviors
---
## Outputs
### BPR Design Document
```markdown
# Business Plan Review: [Team/Organization Name]
## Meeting Logistics
- **Frequency:** [Weekly/Bi-weekly]
- **Day/Time:** [Day] at [Time] [Timezone]
- **Duration:** [X] minutes
- **Location:** [Room/Video link]
- **Attendance:** Mandatory for [list roles]
## Status Definitions
| Color | Meaning | Criteria | Response |
|-------|---------|----------|----------|
| Green | On plan | [specific criteria] | Continue, no action |
| Yellow | At risk, have plan | [specific criteria] | Monitor, offer support |
| Red | Need help | [specific criteria] | "Who can help?" + SAR if needed |
## Agenda Template
1. **Context Setting** ([X] min)
- Business environment updates
- Key announcements
2. **Initiative Status Review** ([X] min)
[List each initiative with owner]
- Initiative A - [Owner]
- Initiative B - [Owner]
- Initiative C - [Owner]
3. **Help Mobilization** (as needed)
- Red items addressed with "Who can help?"
- Resources assigned
4. **SAR Scheduling** ([X] min)
- Items needing deep discussion scheduled
5. **Close** ([X] min)
- Action summary
- Next meeting confirmation
## Meeting Rules
1. Same time, same place, same format
2. Mandatory attendance
3. No side conversations
4. No humor at anyone's expense
5. Status only; debates in SARs
6. Start on time, end on time
7. Information is never used as a weapon
8. Celebrate transparency, especially reds
## SAR Criteria
Schedule a SAR when:
- Discussion exceeds 2 minutes
- Multiple stakeholders needed
- Red item requires problem-solving session
- Cross-functional coordination required
## Facilitator Checklist
Before meeting:
- [ ] Confirm attendance
- [ ] Review previous SAR outcomes
- [ ] Prepare context setting notes
During meeting:
- [ ] Start on time
- [ ] Keep to agenda
- [ ] Respond to reds with gratitude and help
- [ ] Schedule SARs for complex items
- [ ] End on time
After meeting:
- [ ] Send action summary
- [ ] Schedule SARs
- [ ] Follow up on help commitments
```
---
## Error Handling
| Situation | Response |
|-----------|----------|
| Team too small (<3 people) | Suggest simpler check-in format; BPR overhead not justified |
| No clear initiatives to track | Help user define 3-5 key initiatives before designing BPR |
| Meeting time too short (<30 min) | Warn that rushed reviews undermine psychological safety |
| Resistance to mandatory attendance | Explain that optional attendance creates information asymmetry |
| Request for punitive status tracking | Refuse; explain transparency requires safety |
---
## Constraints
- Do not oversimplify complex business realities
- Do not ignore resource and timeline constraints
- Acknowledge risks and uncertainties explicitly
- Honor stakeholder concerns and competing priorities
- Base recommendations on available evidence, not assumptions
- Consider second-order effects and unintended consequences
## Example
**Input:**
```
team_scope: 15-person platform engineering team with 3 squad leads
initiatives: Infrastructure migration, Developer experience improvements,
Security compliance, Performance optimization
frequency: weekly
duration: 60 minutes
```
**Output:** [Complete BPR Design Document with all sections filled in, status definitions tailored to engineering metrics, agenda with 4 initiative slots, and facilitator guide]
---
## Integration
This skill integrates with:
- **transparency-culture-launch** - BPR provides the structure; transparency-culture provides the behavioral transformation
- **alignment-check** - BPR reveals alignment gaps; alignment-check diagnoses them
- **expected-behaviors-design** - BPR rules should reference team's expected behaviors
**Source Expert:** Alan Mulally - This skill implements the core operating mechanism of the Working Together management system.Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.