用于把 Notion 规格转成计划、任务和进度跟踪。
Scanned 9/12/2026
Install to Claude Code
npx -y skills add seaworld008/Commonly-used-high-value-skills --skill notion-spec-to-implementation --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Notion Spec To Implementation?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/seaworld008-notion-spec-to-implementation)More formats (shields.io, HTML) on the badges page.
---
name: notion-spec-to-implementation
description: '用于把 Notion 规格转成计划、任务和进度跟踪。'
zh_description: "用于将 Notion 规格文档转化为可执行实现计划。"
version: "1.0.0"
author: "seaworld008"
source: "in-house"
source_url: ""
tags: '["implementation", "notion", "spec"]'
created_at: "2026-03-04"
updated_at: "2026-03-20"
quality: 3
complexity: "intermediate"
metadata:
short-description: 'Turn Notion specs into implementation plans, tasks, and progress tracking'
---
# Spec to Implementation
Convert a Notion spec into linked implementation plans, tasks, and ongoing status updates.
## When to Use
Use this skill when the user wants to:
- turn a Notion PRD or feature spec into an execution plan
- create linked implementation tasks from a spec
- keep spec, plan, and tasks synchronized over time
- move from product definition to engineering delivery inside Notion
Use a different skill when:
- the main task is documenting research or summaries → use `notion-research-documentation`
- the main task is capturing a meeting or decision artifact → use `notion-knowledge-capture`
## Quick start
1) Locate the spec with `Notion:notion-search`, then fetch it with `Notion:notion-fetch`.
2) Parse requirements and ambiguities using `reference/spec-parsing.md`.
3) Create a plan page with `Notion:notion-create-pages` (pick a template: quick vs. full).
4) Find the task database, confirm schema, then create tasks with `Notion:notion-create-pages`.
5) Link spec ↔ plan ↔ tasks; keep status current with `Notion:notion-update-page`.
## Usage
Typical artifact chain:
```text
spec page
-> implementation plan page
-> task database entries
-> recurring status updates
```
Default output should include:
- requirements summary
- assumptions and open questions
- phases or milestones
- concrete tasks with acceptance criteria
- relations between spec, plan, and task records
## Workflow
### 0) If any MCP call fails because Notion MCP is not connected, pause and set it up:
1. Add the Notion MCP:
- `codex mcp add notion --url https://mcp.notion.com/mcp`
2. Enable remote MCP client:
- Set `[features].rmcp_client = true` in `config.toml` **or** run `codex --enable rmcp_client`
3. Log in with OAuth:
- `codex mcp login notion`
After successful login, the user will have to restart codex. You should finish your answer and tell them so when they try again they can continue with Step 1.
### 1) Locate and read the spec
- Search first (`Notion:notion-search`); if multiple hits, ask the user which to use.
- Fetch the page (`Notion:notion-fetch`) and scan for requirements, acceptance criteria, constraints, and priorities. See `reference/spec-parsing.md` for extraction patterns.
- Capture gaps/assumptions in a clarifications block before proceeding.
- Separate hard requirements from inferred implementation detail; do not silently invent acceptance criteria.
### 2) Choose plan depth
- Simple change → use `reference/quick-implementation-plan.md`.
- Multi-phase feature/migration → use `reference/standard-implementation-plan.md`.
- Create the plan via `Notion:notion-create-pages`, include: overview, linked spec, requirements summary, phases, dependencies/risks, and success criteria. Link back to the spec.
### 3) Create tasks
- Find the task database (`Notion:notion-search` → `Notion:notion-fetch` to confirm the data source and required properties). Patterns in `reference/task-creation.md`.
- Size tasks to 1–2 days. Use `reference/task-creation-template.md` for content (context, objective, acceptance criteria, dependencies, resources).
- Set properties: title/action verb, status, priority, relations to spec + plan, due date/story points/assignee if provided.
- Create pages with `Notion:notion-create-pages` using the database’s `data_source_id`.
- Prefer fewer, clearer tasks over copying the entire spec into every ticket.
### 4) Link artifacts
- Plan links to spec; tasks link to both plan and spec.
- Optionally update the spec with a short “Implementation” section pointing to the plan and tasks using `Notion:notion-update-page`.
- If the spec already has implementation links, update them instead of duplicating sections.
### 5) Track progress
- Use the cadence in `reference/progress-tracking.md`.
- Post updates with `reference/progress-update-template.md`; close phases with `reference/milestone-summary-template.md`.
- Keep checklists and status fields in plan/tasks in sync; note blockers and decisions.
## Common Pitfalls
- turning ambiguous ideas into tasks without calling out assumptions
- creating tasks before confirming the correct task database schema
- making tasks too large to track
- not linking spec, plan, and tasks, which breaks traceability
- updating task status but forgetting to update the plan summary
## Done Criteria
Spec-to-implementation is complete when:
- the source spec is identified and linked
- a plan page exists with phases and risks
- task records exist in the correct data source
- tasks have usable acceptance criteria
- spec, plan, and tasks link to each other
- progress can be reported without rereading the whole spec
## References and examples
- `reference/` — parsing patterns, plan/task templates, progress cadence (e.g., `spec-parsing.md`, `standard-implementation-plan.md`, `task-creation.md`, `progress-tracking.md`).
- `examples/` — end-to-end walkthroughs (e.g., `ui-component.md`, `api-feature.md`, `database-migration.md`).
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!