Fetch weather data for construction scheduling. Historical data, forecasts, and risk assessment for outdoor work.
Scanned 9/19/2026
Install to Claude Code
npx -y skills add rondoflow/rondoflow --skill weather-data-construction-scheduling --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Weather Data Construction Scheduling?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/rondoflow-weather-data-construction-scheduling)More formats (shields.io, HTML) on the badges page.
---
name: weather-data-construction-scheduling
description: "Fetch weather data for construction scheduling. Historical data, forecasts, and risk assessment for outdoor work."
category: "Data & Analytics"
author: community
version: "2.1.0"
icon: chart-bar
---
# Weather API for Construction
## Overview
Weather impacts 50% of construction activities. This skill fetches weather data for scheduling, risk assessment, and productivity adjustments.
## Python Implementation
```python
import requests
import pandas as pd
from typing import Dict, Any, List, Optional
from dataclasses import dataclass
from datetime import datetime, timedelta
from enum import Enum
class WeatherRisk(Enum):
"""Weather risk levels for construction."""
LOW = "low"
MODERATE = "moderate"
HIGH = "high"
CRITICAL = "critical"
@dataclass
class WeatherCondition:
"""Weather condition at a point in time."""
timestamp: datetime
temperature: float # Celsius
humidity: float # Percent
wind_speed: float # m/s
precipitation: float # mm
conditions: str
@dataclass
class WorkabilityAssessment:
"""Assessment of weather workability."""
date: datetime
risk_level: WeatherRisk
workable_hours: int
affected_activities: List[str]
recommendations: List[str]
class WeatherAPIClient:
"""Client for weather APIs."""
# Free tier endpoints
OPEN_METEO_BASE = "https://api.open-meteo.com/v1"
def __init__(self, api_key: Optional[str] = None):
self.api_key = api_key
def get_forecast(self, latitude: float, longitude: float,
days: int = 7) -> List[WeatherCondition]:
"""Get weather forecast."""
url = f"{self.OPEN_METEO_BASE}/forecast"
params = {
'latitude': latitude,
'longitude': longitude,
'hourly': 'temperature_2m,relative_humidity_2m,wind_speed_10m,precipitation',
'forecast_days': days
}
response = requests.get(url, params=params)
if response.status_code != 200:
raise Exception(f"API error: {response.status_code}")
data = response.json()
return self._parse_forecast(data)
def get_historical(self, latitude: float, longitude: float,
start_date: str, end_date: str) -> List[WeatherCondition]:
"""Get historical weather data."""
url = f"{self.OPEN_METEO_BASE}/archive"
params = {
'latitude': latitude,
'longitude': longitude,
'start_date': start_date,
'end_date': end_date,
'hourly': 'temperature_2m,relative_humidity_2m,wind_speed_10m,precipitation'
}
response = requests.get(url, params=params)
if response.status_code != 200:
raise Exception(f"API error: {response.status_code}")
data = response.json()
return self._parse_forecast(data)
def _parse_forecast(self, data: Dict) -> List[WeatherCondition]:
"""Parse API response to WeatherCondition list."""
conditions = []
hourly = data.get('hourly', {})
times = hourly.get('time', [])
temps = hourly.get('temperature_2m', [])
humidity = hourly.get('relative_humidity_2m', [])
wind = hourly.get('wind_speed_10m', [])
precip = hourly.get('precipitation', [])
for i in range(len(times)):
conditions.append(WeatherCondition(
timestamp=datetime.fromisoformat(times[i]),
temperature=temps[i] if i < len(temps) else 0,
humidity=humidity[i] if i < len(humidity) else 0,
wind_speed=wind[i] if i < len(wind) else 0,
precipitation=precip[i] if i < len(precip) else 0,
conditions=self._describe_conditions(
temps[i] if i < len(temps) else 0,
precip[i] if i < len(precip) else 0,
wind[i] if i < len(wind) else 0
)
))
return conditions
def _describe_conditions(self, temp: float, precip: float, wind: float) -> str:
"""Generate weather description."""
conditions = []
if temp < 0:
conditions.append("Freezing")
elif temp > 35:
conditions.append("Extreme heat")
elif temp > 30:
conditions.append("Hot")
elif temp < 10:
conditions.append("Cold")
if precip > 10:
conditions.append("Heavy rain")
elif precip > 2:
conditions.append("Rain")
elif precip > 0:
conditions.append("Light rain")
if wind > 15:
conditions.append("Strong winds")
elif wind > 10:
conditions.append("Windy")
return ", ".join(conditions) if conditions else "Clear"
def to_dataframe(self, conditions: List[WeatherCondition]) -> pd.DataFrame:
"""Convert conditions to DataFrame."""
data = [{
'timestamp': c.timestamp,
'temperature': c.temperature,
'humidity': c.humidity,
'wind_speed': c.wind_speed,
'precipitation': c.precipitation,
'conditions': c.conditions
} for c in conditions]
return pd.DataFrame(data)
class ConstructionWeatherRisk:
"""Assess weather risk for construction activities."""
# Activity-specific thresholds
THRESHOLDS = {
'concrete_pour': {
'min_temp': 5, 'max_temp': 35,
'max_wind': 12, 'max_precip': 0.5
},
'crane_work': {
'min_temp': -10, 'max_temp': 40,
'max_wind': 10, 'max_precip': 5
},
'exterior_paint': {
'min_temp': 10, 'max_temp': 35,
'max_wind': 8, 'max_precip': 0
},
'roofing': {
'min_temp': 5, 'max_temp': 38,
'max_wind': 12, 'max_precip': 0
},
'earthwork': {
'min_temp': -5, 'max_temp': 40,
'max_wind': 20, 'max_precip': 10
}
}
def assess_workability(self, condition: WeatherCondition,
activities: List[str] = None) -> WorkabilityAssessment:
"""Assess workability for given conditions."""
if activities is None:
activities = list(self.THRESHOLDS.keys())
affected = []
recommendations = []
for activity in activities:
if activity in self.THRESHOLDS:
thresh = self.THRESHOLDS[activity]
reasons = []
if condition.temperature < thresh['min_temp']:
reasons.append(f"Too cold ({condition.temperature}°C)")
if condition.temperature > thresh['max_temp']:
reasons.append(f"Too hot ({condition.temperature}°C)")
if condition.wind_speed > thresh['max_wind']:
reasons.append(f"High wind ({condition.wind_speed} m/s)")
if condition.precipitation > thresh['max_precip']:
reasons.append(f"Precipitation ({condition.precipitation} mm)")
if reasons:
affected.append(activity)
recommendations.append(f"{activity}: " + ", ".join(reasons))
# Determine overall risk level
if len(affected) >= len(activities) * 0.8:
risk = WeatherRisk.CRITICAL
workable = 0
elif len(affected) >= len(activities) * 0.5:
risk = WeatherRisk.HIGH
workable = 4
elif len(affected) > 0:
risk = WeatherRisk.MODERATE
workable = 6
else:
risk = WeatherRisk.LOW
workable = 8
return WorkabilityAssessment(
date=condition.timestamp,
risk_level=risk,
workable_hours=workable,
affected_activities=affected,
recommendations=recommendations
)
def weekly_forecast_risk(self, conditions: List[WeatherCondition],
activities: List[str] = None) -> pd.DataFrame:
"""Assess risk for week of weather data."""
# Group by date
daily_conditions = {}
for c in conditions:
date = c.timestamp.date()
if date not in daily_conditions:
daily_conditions[date] = []
daily_conditions[date].append(c)
assessments = []
for date, day_conditions in daily_conditions.items():
# Use midday condition as representative
midday = [c for c in day_conditions
if 10 <= c.timestamp.hour <= 16]
representative = midday[len(midday)//2] if midday else day_conditions[0]
assessment = self.assess_workability(representative, activities)
assessments.append({
'date': date,
'risk_level': assessment.risk_level.value,
'workable_hours': assessment.workable_hours,
'affected_count': len(assessment.affected_activities)
})
return pd.DataFrame(assessments)
```
## Quick Start
```python
# Initialize client
weather = WeatherAPIClient()
# Get forecast for site
conditions = weather.get_forecast(latitude=52.52, longitude=13.41, days=7)
df = weather.to_dataframe(conditions)
print(df.head())
# Assess construction risk
risk = ConstructionWeatherRisk()
weekly_risk = risk.weekly_forecast_risk(conditions)
print(weekly_risk)
```
## Common Use Cases
### 1. Schedule Planning
```python
conditions = weather.get_forecast(52.52, 13.41, days=14)
risk = ConstructionWeatherRisk()
# Check concrete pour window
for c in conditions:
assessment = risk.assess_workability(c, ['concrete_pour'])
if assessment.risk_level == WeatherRisk.LOW:
print(f"Good for concrete: {c.timestamp}")
```
### 2. Historical Analysis
```python
historical = weather.get_historical(52.52, 13.41, '2024-01-01', '2024-03-31')
df = weather.to_dataframe(historical)
# Count rain days
rain_days = df[df['precipitation'] > 2]['timestamp'].dt.date.nunique()
print(f"Rain days in Q1: {rain_days}")
```
## Resources
- **DDC Book**: Chapter 2.2 - Open Data Integration