[omh] Hermes Report Package workflow: weekly/monthly reports, executive briefs, PPT-ready outlines, and upload packages. Use when the user says: report-package, report package, weekly report, monthly report, executive report, exec brief, leadership deck, status package.
Scanned 9/2/2026
Install to Claude Code
npx -y skills add rlaope/oh-my-hermes --skill omh-report-package --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Omh Report Package?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/rlaope-omh-report-package)More formats (shields.io, HTML) on the badges page.
---
name: "omh-report-package"
description: "[omh] Hermes Report Package workflow: weekly/monthly reports, executive briefs, PPT-ready outlines, and upload packages. Use when the user says: report-package, report package, weekly report, monthly report, executive report, exec brief, leadership deck, status package."
metadata:
hermes:
tags: [workflow, oh-my-hermes, reporting]
category: reporting
phase: package-outline
role: operator
quality_tier: report-gated
---
# Report Package
This is a Hermes-native `report-package` workflow skill.
## Why This Exists
`report-package` exists to make reporting a first-class operations surface: Hermes can produce clean report and slide outlines while keeping approvals, delivery, and binary deck export as separate evidence.
## Do Not Use When
- The user needs SLO, incident, or error-budget review; use `reliability-review`.
- The user asks for a live `.pptx` deck file rather than a PPT-ready outline.
- The request is meeting minutes, scrum history, or action-item tracking.
## Examples
Good example:
- Prompt: report-package 월간 리더십 보고서 PPT outline 만들어줘.
- Expected behavior: Prepare a report package with sections, assumptions, missing inputs, and Markdown/JSON outline scope.
- Why: The request is packaging known information for reporting, not reliability validation or code work.
Bad example:
- Prompt: report-package prove our SLO passed and close the incident.
- Expected behavior: Route to `reliability-review` and require metric or incident evidence.
- Why: Report packaging cannot satisfy reliability closure evidence.
## Completion Checklist
- The reporting window, inputs, audience, narrative, and evidence gaps are named.
- Draft report, generated package, approval, and delivery are separate states.
- The next action says whether to gather evidence, generate, revise, approve, or deliver.
## Recovery Notes
- If input evidence is incomplete, mark the section as pending rather than fabricating a report claim.
- If delivery or attachment is unavailable, keep the report package prepared_not_observed.
## Workflow Lane
- Current lane: **Materials and visual summaries** (`design-orchestration`, `design-quality-gate`, `frontend`, `accessibility-audit`, `visual-qa`, `content-operator`, `media-input-operator`, `materials-package`, `+4 more`) - web, accessibility, visual QA, files, and packages.
- If intent belongs to another lane, hand back to `oh-my-hermes` or name the adjacent workflow.
- Shared product, routing, compatibility, and evidence rules: `omh-routing/references/skill-common-rail.md`.
## Use When
Use when Hermes should turn supplied inputs into a report, executive brief, PPT-ready outline, or upload package without claiming presentation delivery.
Strong routing signals: `report-package`, `report package`, `weekly report`, `monthly report`, `executive report`, `exec brief`, `leadership deck`, `status package`, `ppt outline`, `presentation outline`, `slide outline`, `upload package`, `PPT`, `보고서 패키지`, `주간 보고서`, `월간 보고서`, `경영진 보고`, `리더십 보고`, `피피티`, `슬라이드`, `발표자료`, `업로드 패키지`
## Catalog Metadata
Category: `reporting`
Phase: `package-outline`
Hermes role: `operator`
Quality tier: `report-gated`
Reasoning demand: `standard`
Quality bar:
- Name audience, reporting period, sections, supplied facts, assumptions, and missing data.
- Keep report packaging independent from reliability review unless explicitly requested.
- Export only Markdown/JSON outlines unless a separate presentation tool produces a binary deck.
Handoff policy:
Keep report narrative, sectioning, and Markdown/JSON outline packaging in Hermes; do not require reliability evidence unless the user asks for a reliability review.
Required inputs:
- audience
- reporting period or scope
- supplied facts
- missing data or assumptions
Expected outputs:
- report package
- PPT-ready Markdown or JSON outline
- assumptions and missing-input list
- optional achievements badge section sourced from `omh achievements export --format md` when requested
Artifact expectations:
- operation_artifact/v1 report-package artifact when a wrapper or CLI records it
Safety rules:
- Do not claim source review completion from a prepared report package.
- Do not claim stakeholder approval or presentation delivery without observed evidence.
- Do not couple report packages to SLO, incident, or error-budget evidence by default.
## Runtime Evidence
Preferred harness for this skill: `report-package`.
```sh
omh runtime record --skill report-package --harness report-package --status started
```
Record observed delegation results; otherwise return `not_available` or `not_observed`.
Prepared OMH routing is not execution, review, CI, merge-readiness, or merge evidence.
- Treat wrapper memory/context summaries as advisory local context, not proof of opaque Hermes memory reads or changes.
Preserve workflow intent and stop conditions; verify before claiming completion.
Use Hermes-native subagent/delegation features when available: native subagents -> Hermes delegation when available, otherwise sequential lanes.
Shared product, compatibility, topology, memory, harness, and execution rules: `omh-routing/references/skill-common-rail.md`. Load it when applicable; otherwise name an unavailable capability.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!