[omh] Hermes Plan workflow: structured planning before execution. Use when the user says: plan, implementation plan, task breakdown, safe feature, safely add a feature, add a feature, feature request, new feature.
Scanned 9/2/2026
Install to Claude Code
npx -y skills add rlaope/oh-my-hermes --skill omh-plan --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Omh Plan?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/rlaope-omh-plan)More formats (shields.io, HTML) on the badges page.
---
name: "omh-plan"
description: "[omh] Hermes Plan workflow: structured planning before execution. Use when the user says: plan, implementation plan, task breakdown, safe feature, safely add a feature, add a feature, feature request, new feature."
metadata:
hermes:
tags: [workflow, oh-my-hermes, planning]
category: planning
phase: plan
role: planner
quality_tier: acceptance-gated
---
# Plan
This is a Hermes-native `plan` workflow skill.
## Why This Exists
`plan` exists to keep `planning` work explicit, evidence-backed, and inside the Hermes/executor boundary instead of relying on ad hoc chat narration.
## Do Not Use When
- The request is casual chat, a status-only acknowledgement, or another workflow has stronger routing evidence.
- The user needs implementation, review, CI, merge, or external publishing evidence that has not been delegated or observed.
## Examples
Good example:
- Prompt: plan: handle a planning request that needs explicit evidence boundaries and a clear stop condition.
- Expected behavior: Run `plan` only after naming the target, evidence boundary, and stop condition.
- Why: The request matches the catalog use case and keeps observed evidence separate from prepared guidance.
Bad example:
- Prompt: plan: treat casual chat or unaccepted work as if this workflow already produced verified results.
- Expected behavior: Ask a clarification question or route to a narrower workflow instead of forcing `plan`.
- Why: The request lacks the required inputs or would overclaim work that Hermes did not observe.
## Completion Checklist
- The plan names goals, non-goals, assumptions, acceptance criteria, and verification shape.
- Draft recommendations, accepted decisions, and executor handoffs are separate states.
- Rejected options or unresolved tradeoffs are recorded before handoff.
## Recovery Notes
- If acceptance criteria or verification are missing, route back to clarification before handoff.
- If assumptions materially affect the plan, keep them visible and avoid treating the plan as accepted.
## Workflow Lane
- Current lane: **Intent -> plan** (`oh-my-hermes`, `meta-router`, `deep-interview`, `context`, `plan`, `ralplan`, `adversarial-consensus`, `codebase-onboarding`, `+7 more`) - clarify, plan, ship, or loop goals.
- If intent belongs to another lane, hand back to `oh-my-hermes` or name the adjacent workflow.
- Shared product, routing, compatibility, and evidence rules: `omh-routing/references/skill-common-rail.md`.
## Use When
Use for structured planning when implementation is not ready to start safely, including feature work that needs a safe plan before handoff.
Strong routing signals: `plan`, `$plan`, `implementation plan`, `task breakdown`, `safe feature`, `safely add a feature`, `add a feature`, `feature request`, `new feature`, `product triage`, `bug triage`, `issue triage`, `reproduction plan`, `workflow hub`, `coding handoff`, `project template`, `github pr workflow`, `実装計画`, `タスク分解`, `安全に機能追加`, `機能追加の計画`, `답할 차례`, `준비할 차례`, `재현 계획`, `요구사항 정리`, `작업 허브`, `작업 허브가 필요`, `상태와 다음 행동`, `프로젝트별 운영`, `实现计划`, `任务拆解`, `安全地新增功能`, `新增功能计划`
## Catalog Metadata
Category: `planning`
Phase: `plan`
Hermes role: `planner`
Quality tier: `acceptance-gated`
Reasoning demand: `standard`
Quality bar:
- Make goals, non-goals, risks, acceptance criteria, and verification shape explicit.
- Keep draft plans unapproved until a user or wrapper accepts them.
- Only prepare coding handoff guidance after the plan is accepted.
- Plan acceptance approves the plan content, not execution: after acceptance, recommend the follow-on path that fits the work's shape — `ultrawork` durable checkpoints for progress that must survive sessions as a checkpointed ledger, `ultrawork` coordinated lanes for an accepted plan split into disjoint parallel lanes, `ultrawork` single-owner persistence for one already-scoped task with a single owner, `ultrawork` for one bounded delivery cycle, or a direct selected executor/runtime handoff for a single prepared coding change — state the fit reason in one line, and start it only after the user's explicit go-ahead.
Handoff policy:
Keep planning in Hermes; if the accepted plan requires code edits, prepare a selected executor/runtime handoff after acceptance, and start a follow-on workflow engine only after the user explicitly confirms the recommended path.
Required inputs:
- requirements
- constraints
- known facts
- non-goals
Expected outputs:
- plan
- acceptance criteria
- verification strategy
Artifact expectations:
- plan artifact when durable execution will follow
Safety rules:
- Do not imply hidden Hermes runtime behavior.
- Use the smallest verification that can prove the claim.
## Runtime Evidence
Preferred harness for this skill: `planning`.
```sh
omh runtime record --skill plan --harness planning --status started
```
Record observed delegation results; otherwise return `not_available` or `not_observed`.
Prepared OMH routing is not execution, review, CI, merge-readiness, or merge evidence.
- When wrapper metadata includes `memory_review_card/v1` or `handoff_context_pack/v1`, treat it as reviewed OMH-local or wrapper-supplied context only. Use conflict-free context summaries to shape plans and handoffs, but do not claim Hermes internal memory was read or changed.
Preserve workflow intent and stop conditions; verify before claiming completion.
Use Hermes-native subagent/delegation features when available: native subagents -> Hermes delegation when available, otherwise sequential lanes.
Shared product, compatibility, topology, memory, harness, and execution rules: `omh-routing/references/skill-common-rail.md`. Load it when applicable; otherwise name an unavailable capability.
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!