A launch checklist is a comprehensive verification document that ensures all functions are ready before releasing a feature or product. It coordinates across engineering, QA, design, marketing, support, legal, and operations to prevent launch-day surprises. Good launch checklists surface blockers early and create shared accountability for launch readiness.
Scanned 2/12/2026
Install via CLI
openskills install product-on-purpose/pm-skills<!-- PM-Skills | https://github.com/product-on-purpose/pm-skills | Apache 2.0 -->
---
name: deliver-launch-checklist
description: Creates a comprehensive pre-launch checklist covering engineering, design, marketing, support, legal, and operations readiness. Use before releasing features, products, or major updates to ensure nothing is missed.
phase: deliver
version: "2.0.0"
updated: 2026-01-26
license: Apache-2.0
metadata:
category: coordination
frameworks: [triple-diamond, lean-startup, design-thinking]
author: product-on-purpose
---
# Launch Checklist
A launch checklist is a comprehensive verification document that ensures all functions are ready before releasing a feature or product. It coordinates across engineering, QA, design, marketing, support, legal, and operations to prevent launch-day surprises. Good launch checklists surface blockers early and create shared accountability for launch readiness.
## When to Use
- 1-2 weeks before any significant launch
- During launch planning kickoff meetings
- When coordinating cross-functional releases
- Before major version releases or feature rollouts
- After incidents to improve launch processes
## Instructions
When asked to create a launch checklist, follow these steps:
1. **Define Launch Context**
Document what is launching, when, and who the key stakeholders are. Establish the launch tier (major release, minor feature, experiment) as this affects checklist scope.
2. **Gather Functional Requirements**
For each function (engineering, QA, marketing, etc.), identify what must be complete, verified, or in place before launch. Distinguish between blockers (must-have) and nice-to-haves.
3. **Assign Owners and Dates**
Every checklist item needs an owner and a target completion date. Ownership creates accountability; dates enable tracking.
4. **Identify Dependencies and Blockers**
Flag items that block other work or are blocked by external factors. Surface these early so teams can unblock.
5. **Define Go/No-Go Criteria**
Establish clear criteria for making the launch decision. What conditions must be met? Who makes the final call?
6. **Document Rollback Plan**
Every launch should have a rollback strategy. Document how to revert if critical issues emerge post-launch.
7. **Schedule Check-in Cadence**
Establish when the team will review checklist progress (daily standups, T-2 days review, launch day sync).
## Output Format
Use the template in `references/TEMPLATE.md` to structure the output.
## Quality Checklist
Before finalizing, verify:
- [ ] All functional areas are represented
- [ ] Every item has an owner and target date
- [ ] Blockers are clearly distinguished from nice-to-haves
- [ ] Go/No-Go criteria are specific and measurable
- [ ] Rollback plan is documented and tested
- [ ] Check-in cadence is scheduled
## Examples
See `references/EXAMPLE.md` for a completed example.