Skip to content
Back to skills

Manage Change Control

ASecurity

Manage change control for validated computerized systems. Covers change request triage (emergency, standard, minor), impact assessment on validated state, revalidation scope determination, approval workflows, implementation tracking, and post-change verification. Use when a validated system requires a software upgrade, patch, or configuration change; when infrastructure changes affect validated systems; when a CAPA requires system modification; or when emergency changes need expedited approva...

  • 31 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 3, 2026
ai-agentsgobashtestingdatabasedocumentation

Security analysis

A100/100

Scanned September 3, 2026

npx -y skills add pjt222/agent-almanac --skill manage-change-control --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Manage Change Control?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Manage Change Control
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/pjt222-manage-change-control-agent-almanac/badge)](https://www.skillsdirectory.com/skills/pjt222-manage-change-control-agent-almanac)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: manage-change-control
locale: caveman-lite
source_locale: en
source_commit: 82c77053
fence_basis_commit: 82c77053
translator: "Julius Brussee homage — caveman"
translation_date: "2026-04-24"
description: >
  Manage change control for validated computerized systems. Covers change
  request triage (emergency, standard, minor), impact assessment on validated
  state, revalidation scope determination, approval workflows, implementation
  tracking, and post-change verification. Use when a validated system requires
  a software upgrade, patch, or configuration change; when infrastructure
  changes affect validated systems; when a CAPA requires system modification;
  or when emergency changes need expedited approval and retrospective
  documentation.
license: MIT
allowed-tools: Read Write Edit Bash Grep Glob
metadata:
  author: Philipp Thoss
  version: "1.0"
  domain: compliance
  complexity: intermediate
  language: multi
  tags: gxp, change-control, revalidation, impact-assessment, compliance
---

# Manage Change Control

Evaluate, approve, implement, and verify changes to validated computerized systems while maintaining their validated state.

## When to Use

- A validated system requires a software upgrade, patch, or configuration change
- Infrastructure changes (server migration, OS upgrade, network change) affect validated systems
- A CAPA or audit finding requires system modification
- Business process changes require system reconfiguration
- Emergency changes need expedited approval and retrospective documentation

## Inputs

- **Required**: Change description (what is changing and why)
- **Required**: System(s) affected and their current validated state
- **Required**: Change requestor and business justification
- **Optional**: Vendor release notes or technical documentation
- **Optional**: Related CAPA or audit finding references
- **Optional**: Existing validation documentation for affected system(s)

## Procedure

### Step 1: Create and Classify the Change Request

```markdown
# Change Request
## Document ID: CR-[SYS]-[YYYY]-[NNN]

### 1. Change Description
**Requestor:** [Name, Department]
**Date:** [YYYY-MM-DD]
**System:** [System name and version]
**Current State:** [Current configuration/version]
**Proposed State:** [Target configuration/version]

### 2. Justification
[Business, regulatory, or technical reason for the change]

### 3. Classification
| Type | Definition | Approval Path | Timeline |
|------|-----------|--------------|----------|
| **Emergency** | Urgent fix for safety, data integrity, or regulatory compliance | System owner + QA (retrospective CCB) | Implement immediately, document within 5 days |
| **Standard** | Planned change with potential impact on validated state | CCB approval before implementation | Per CCB schedule |
| **Minor** | Low-risk change with no impact on validated state | System owner approval | Documented before implementation |

**This change is classified as:** [Emergency / Standard / Minor]
**Rationale:** [Why this classification]
```

**Got:** Change request has a unique ID, clear description, and justified classification.
**If fail:** If classification is disputed, default to Standard and let the CCB adjudicate.

### Step 2: Perform Impact Assessment

Evaluate the change against all dimensions of the validated state:

```markdown
# Impact Assessment
## Change Request: CR-[SYS]-[YYYY]-[NNN]

### Impact Matrix
| Dimension | Affected? | Details | Risk |
|-----------|-----------|---------|------|
| Software configuration | Yes/No | [Specific parameters changing] | [H/M/L] |
| Source code | Yes/No | [Modules, functions, or scripts affected] | [H/M/L] |
| Database schema | Yes/No | [Tables, fields, constraints changing] | [H/M/L] |
| Infrastructure | Yes/No | [Servers, network, storage affected] | [H/M/L] |
| Interfaces | Yes/No | [Upstream/downstream system connections] | [H/M/L] |
| User access/roles | Yes/No | [Role changes, new access requirements] | [H/M/L] |
| SOPs/work instructions | Yes/No | [Procedures requiring update] | [H/M/L] |
| Training | Yes/No | [Users requiring retraining] | [H/M/L] |
| Data migration | Yes/No | [Data transformation or migration needed] | [H/M/L] |
| Audit trail | Yes/No | [Impact on audit trail continuity] | [H/M/L] |

### Regulatory Impact
- [ ] Change affects 21 CFR Part 11 controls
- [ ] Change affects EU Annex 11 controls
- [ ] Change affects data integrity (ALCOA+)
- [ ] Change requires regulatory notification
```

**Got:** Every dimension is assessed with a clear yes/no and rationale.
**If fail:** If impact cannot be determined without testing, classify the dimension as "Unknown — requires investigation" and mandate a sandbox evaluation before production change.

### Step 3: Determine Revalidation Scope

Based on the impact assessment, define what validation activities are needed:

```markdown
# Revalidation Determination

| Revalidation Level | Criteria | Activities Required |
|--------------------|----------|-------------------|
| **Full revalidation** | Core functionality changed, new GAMP category, or major version upgrade | URS review, RA update, IQ, OQ, PQ, TM update, VSR |
| **Partial revalidation** | Specific functions affected, configuration changes | Targeted OQ for affected functions, TM update |
| **Documentation only** | No functional impact, administrative changes | Update validation documents, change log entry |
| **None** | No impact on validated state (e.g., cosmetic change) | Change log entry only |

### Determination for CR-[SYS]-[YYYY]-[NNN]
**Revalidation level:** [Full / Partial / Documentation only / None]
**Rationale:** [Specific reasoning based on impact assessment]

### Required Activities
| Activity | Owner | Deadline |
|----------|-------|----------|
| [e.g., Execute OQ test cases TC-OQ-015 through TC-OQ-022] | [Name] | [Date] |
| [e.g., Update traceability matrix for URS-007] | [Name] | [Date] |
| [e.g., Update SOP-LIMS-003 section 4.2] | [Name] | [Date] |
```

**Got:** Revalidation scope is proportional to the change impact — no more, no less.
**If fail:** If revalidation scope is contested, err on the side of more testing. Under-validation is a regulatory risk; over-validation is only a resource cost.

### Step 4: Obtain Approval

Route the change through the appropriate approval workflow:

```markdown
# Change Approval

### Approval for: CR-[SYS]-[YYYY]-[NNN]

| Role | Name | Decision | Signature | Date |
|------|------|----------|-----------|------|
| System Owner | | Approve / Reject / Defer | | |
| QA Representative | | Approve / Reject / Defer | | |
| IT Representative | | Approve / Reject / Defer | | |
| Validation Lead | | Approve / Reject / Defer | | |

### Conditions (if any)
[Any conditions attached to the approval]

### Planned Implementation Window
- **Start:** [Date/Time]
- **End:** [Date/Time]
- **Rollback deadline:** [Point of no return]
```

**Got:** All required approvers have signed before implementation begins (except emergency changes).
**If fail:** For emergency changes, obtain verbal approval from system owner and QA, implement the change, and complete formal documentation within 5 business days.

### Step 5: Implement and Verify

Execute the change and perform post-change verification:

```markdown
# Implementation Record

### Pre-Implementation
- [ ] Backup of current system state completed
- [ ] Rollback procedure documented and tested
- [ ] Affected users notified
- [ ] Test environment validated (if applicable)

### Implementation
- **Implemented by:** [Name]
- **Date/Time:** [YYYY-MM-DD HH:MM]
- **Steps performed:** [Detailed implementation steps]
- **Deviations from plan:** [None / Description]

### Post-Change Verification
| Verification | Result | Evidence |
|--------------|--------|----------|
| System accessible and functional | Pass/Fail | [Screenshot/log reference] |
| Changed functionality works as specified | Pass/Fail | [Test case reference] |
| Unchanged functionality unaffected (regression) | Pass/Fail | [Test case reference] |
| Audit trail continuity maintained | Pass/Fail | [Audit trail screenshot] |
| User access controls intact | Pass/Fail | [Access review reference] |

### Closure
- [ ] All verification activities completed successfully
- [ ] Validation documents updated per revalidation determination
- [ ] SOPs updated and effective
- [ ] Training completed for affected users
- [ ] Change record closed in change control system
```

**Got:** Implementation matches the approved plan, and all verification activities pass.
**If fail:** If verification fails, execute the rollback procedure immediately and document the failure as a deviation. Do not proceed without QA concurrence.

## Validation

- [ ] Change request has unique ID, description, and classification
- [ ] Impact assessment covers all dimensions (software, data, infrastructure, SOPs, training)
- [ ] Revalidation scope is defined with rationale
- [ ] All required approvals obtained before implementation (or within 5 days for emergency)
- [ ] Pre-implementation backup and rollback procedure documented
- [ ] Post-change verification demonstrates the change works and nothing else broke
- [ ] Validation documents updated to reflect the change
- [ ] Change record formally closed

## Pitfalls

- **Skipping impact assessment for "small" changes**: Even minor changes can have unexpected impacts. A configuration toggle that seems harmless may disable an audit trail or change a calculation.
- **Emergency change abuse**: If more than 10% of changes are classified as "emergency," the change process is being circumvented. Review and tighten the emergency criteria.
- **Incomplete rollback planning**: Assuming rollback is "just restore the backup" ignores data created between backup and rollback. Define data disposition for every rollback scenario.
- **Approval after implementation**: Retrospective approval (except for documented emergencies) is a compliance violation. The CCB must approve before work begins.
- **Missing regression testing**: Verifying only the changed functionality is insufficient. Regression testing must confirm that existing validated functions remain unaffected.

## Related Skills

- `design-compliance-architecture` — defines the governance framework including change control board
- `write-validation-documentation` — create the revalidation documentation triggered by changes
- `perform-csv-assessment` — full CSV reassessment for major changes requiring full revalidation
- `write-standard-operating-procedure` — update SOPs affected by the change
- `investigate-capa-root-cause` — when changes are triggered by CAPAs

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…