Execute structural metamorphosis using strangler fig migration, chrysalis phases, and interface preservation. Covers transformation planning, parallel running, progressive cutover, rollback design, and post-metamorphosis stabilization for system architecture evolution. Use when assess-form has classified the system as READY for transformation, when migrating from monolith to microservices, when replacing a core subsystem while dependents continue operating, or when any architectural change mu...
Scanned 9/3/2026
Install to Claude Code
npx -y skills add pjt222/agent-almanac --skill adapt-architecture --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Adapt Architecture?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/pjt222-adapt-architecture-ab489be4)More formats (shields.io, HTML) on the badges page.
---
name: adapt-architecture
locale: caveman
source_locale: en
source_commit: 82c77053
fence_basis_commit: 82c77053
translator: "Julius Brussee homage — caveman"
translation_date: "2026-04-19"
description: >
Execute structural metamorphosis using strangler fig migration, chrysalis
phases, and interface preservation. Covers transformation planning, parallel
running, progressive cutover, rollback design, and post-metamorphosis
stabilization for system architecture evolution. Use when assess-form has
classified the system as READY for transformation, when migrating from
monolith to microservices, when replacing a core subsystem while dependents
continue operating, or when any architectural change must be gradual rather
than big-bang.
license: MIT
allowed-tools: Read
metadata:
author: Philipp Thoss
version: "1.0"
domain: morphic
complexity: intermediate
language: natural
tags: morphic, adaptation, architecture, migration, strangler-fig
---
# Adapt Architecture
Execute structural metamorphosis — transform system architecture from current form to target form while keep operational continuity. Use strangler fig migration, chrysalis phases, interface preservation. System never stops working during transformation.
## When Use
- Form assessment (see `assess-form`) classified system as READY
- System must evolve architecture to meet new requirements without downtime
- Migrating from monolith to microservices (or reverse)
- Replacing core subsystem while dependent systems keep operating
- Evolving data model while keep backward compatibility
- Any architectural change must be gradual, not big-bang
## Inputs
- **Required**: Current form assessment (from `assess-form` or equivalent analysis)
- **Required**: Target architecture (what system should become)
- **Required**: Operational continuity requirements (what must not break during transformation)
- **Optional**: Available transformation budget (time, people, compute)
- **Optional**: Rollback requirements (how far back must retreat?)
- **Optional**: Parallel running duration (how long run old and new together)
## Steps
### Step 1: Design Transformation Blueprint
Plan metamorphosis path from current form to target form.
1. Map transformation as sequence of intermediate forms:
- Current form → Intermediate form 1 → ... → Target form
- Each intermediate form must be operationally viable (serves traffic, passes tests)
- No intermediate form harder to maintain than current form
2. Identify transformation seams:
- Where can current form be "cut" to insert new architecture?
- Natural seams: existing interfaces, module boundaries, data partitions
- Artificial seams: interfaces created specifically to enable cut (anti-corruption layers)
3. Choose metamorphosis pattern:
- **Strangler fig**: new system grows around old, gradually replaces it
- **Chrysalis**: old system wrapped in new shell; internals replaced while shell preserves external interface
- **Budding**: new system grows alongside old; traffic gradually shifts (see `scale-colony` for colony budding)
- **Metamorphic migration**: phased replacement of components in dependency order (leaves first, roots last)
4. Design interface preservation layer:
- External consumers must not experience disruption
- API versioning, backward-compatible contracts, adapter patterns
- Preservation layer is temporary scaffolding — plan its removal
```text
Metamorphosis Patterns:
┌───────────────┬───────────────────────────────────────────────────┐
│ Strangler Fig │ New code intercepts routes one by one; │
│ │ old code handles everything else until replaced │
│ │ ┌──────────┐ │
│ │ │ Old ████ │ → │ Old ██ New ██ │ → │ New ████ │ │
│ │ └──────────┘ │
├───────────────┼───────────────────────────────────────────────────┤
│ Chrysalis │ Wrap old system in new interface; replace │
│ │ internals while external shell stays stable │
│ │ ┌──────────┐ ┌──[new]───┐ ┌──[new]───┐ │
│ │ │ old core │ → │ old core │ → │ new core │ │
│ │ └──────────┘ └──────────┘ └──────────┘ │
├───────────────┼───────────────────────────────────────────────────┤
│ Budding │ New system runs in parallel; traffic shifts │
│ │ ┌──────┐ ┌──────┐ ┌──────┐ ┌──────┐ │
│ │ │ Old │ │ New │ → │ Old │ │ New │ │
│ │ │ 100% │ │ 0% │ │ 0% │ │ 100% │ │
│ │ └──────┘ └──────┘ └──────┘ └──────┘ │
└───────────────┴───────────────────────────────────────────────────┘
```
**Got:** Transformation blueprint shows intermediate forms, seams, chosen metamorphosis pattern, interface preservation strategy. Each step concrete and testable.
**If fail:** No clean seam? System may need preliminary dissolution (see `dissolve-form`) to create seams before transformation. Intermediate forms not operationally viable? Transformation steps too large — decompose into smaller increments.
### Step 2: Build Scaffolding
Construct temporary infrastructure that supports metamorphosis.
1. Create anti-corruption layer:
- Thin translation layer between old and new systems
- Routes requests to appropriate system (old or new) based on migration state
- Translates data formats between old and new representations
- This layer is "cocoon" that protects transformation
2. Set up parallel running infrastructure:
- Both old and new systems must be deployable together
- Feature flags control which system handles which traffic
- Comparison mechanisms validate that old and new produce equivalent results
3. Establish rollback checkpoints:
- At each intermediate form, verify rollback to previous form possible
- Rollback must be faster than forward transformation step
- Data migration must be reversible (or data must be dual-written during transition)
4. Build validation harness:
- Automated tests verify operational continuity at each intermediate form
- Performance benchmarks detect regression
- Data integrity checks catch migration errors
**Got:** Scaffolding infrastructure (anti-corruption layer, parallel running, rollback, validation) in place before any transformation begins. Scaffolding itself tested and verified.
**If fail:** Scaffolding too expensive? Simplify: minimum viable scaffolding is feature flag and rollback procedure. Anti-corruption layers and parallel running add safety but not always necessary for smaller transformations.
### Step 3: Execute Progressive Cutover
Migrate functionality from old form to new form incrementally.
1. Order components for migration:
- Start with least-coupled, lowest-risk component (build confidence)
- Progress toward more critical, more coupled components
- Save most coupled/critical component for last (by then team has experience)
2. For each component:
a. Implement new version behind anti-corruption layer
b. Run parallel: both old and new process same inputs
c. Compare outputs — should be equivalent (or differences should be expected and documented)
d. When confident, switch traffic to new version (feature flag flip)
e. Monitor for anomalies (increase monitoring sensitivity post-cutover)
f. After stability period, decommission old version of this component
3. Maintain continuous delivery throughout:
- Each cutover step is normal deployment, not special event
- System always in known, tested, operational state
- Cutover causes issues? Roll back to previous state (still operational)
**Got:** Functionality migrates component by component with validation at each step. System always operational. Each cutover builds confidence for next.
**If fail:** Parallel running reveals discrepancies? New implementation has bug — fix before cutting over. Cutover causes performance degradation? New component may need optimization or anti-corruption layer adding too much overhead. Team loses confidence mid-migration? Pause and stabilize — half-migrated system in known state far better than rushed full migration.
### Step 4: Manage Chrysalis Phase
Navigate most vulnerable period — when system between forms.
1. Acknowledge chrysalis reality:
- During migration, system is partly old and partly new
- This hybrid state inherently more complex than either pure state
- Complexity peaks at midpoint of migration, then decreases
2. Chrysalis discipline:
- No new features during chrysalis phase (transformation only)
- Minimal external changes (freeze non-essential deployments)
- Increased monitoring and on-call coverage
- Daily check-ins on migration progress and system health
3. Mid-chrysalis assessment:
- At halfway point, assess: target form still right goal?
- Anything changed (market, requirements, team) that affects target?
- Should transformation continue, pause, or redirect?
4. Protect chrysalis:
- Keep rollback path clear at all times
- Document current hybrid state thoroughly (future debuggers will need it)
- Resist temptation to "clean up" temporary scaffolding before migration complete
**Got:** Chrysalis phase managed as deliberate, time-bounded period with increased discipline and monitoring. Team understands temporary complexity is cost of safe transformation.
**If fail:** Chrysalis phase drags too long? Hybrid state becomes new normal — worse than either old or new. Set time limit. Limit reached? Either accelerate remaining migration or accept hybrid state as "new form" and stabilize it.
### Step 5: Complete Metamorphosis and Stabilize
Finish transformation. Remove scaffolding.
1. Final cutover:
- Migrate last component(s) to new form
- Run full validation suite against complete new system
- Performance test under production-equivalent load
2. Remove scaffolding:
- Decommission anti-corruption layer (no longer needed)
- Remove feature flags related to migration
- Clean up parallel running infrastructure
- Archive (don't delete) old system code for reference
3. Post-metamorphosis stabilization:
- Run in new form for 2-4 weeks with enhanced monitoring
- Address any issues that emerge under real-world conditions
- Update documentation to reflect new architecture
4. Retrospective:
- What went well in transformation?
- What was harder than expected?
- What would do differently next time?
- Update team's transformation playbook
**Got:** Transformation complete. System operates in new form. Scaffolding removed. Documentation updated. Team captured learnings for future transformations.
**If fail:** New form unstable after cutover? Maintain rollback path and continue stabilization. Stabilization takes more than planned period? Design issue in new architecture — consider whether targeted fixes or partial rollback of most problematic component appropriate.
## Checks
- [ ] Transformation blueprint shows viable intermediate forms
- [ ] Scaffolding (anti-corruption layer, rollback, validation harness) in place before migration starts
- [ ] Components migrate in order from lowest to highest risk
- [ ] Parallel running validates equivalence at each step
- [ ] Chrysalis phase time-bounded with feature freeze discipline
- [ ] All scaffolding removed after transformation completes
- [ ] Post-metamorphosis stabilization period passes without critical issues
- [ ] Retrospective captures learnings
## Pitfalls
- **Big-bang migration**: Transform everything at once. Abandons safety of incremental cutover. Maximizes blast radius. Always migrate incrementally
- **Permanent scaffolding**: Anti-corruption layers and feature flags never removed become technical debt. Plan scaffolding removal as part of transformation, not afterthought
- **Chrysalis denial**: Pretend hybrid state is normal. Leads to feature development on unstable foundations. Acknowledge chrysalis phase and enforce discipline
- **Target fixation**: Becoming so committed to target architecture that signs of better alternative ignored. Mid-chrysalis assessment exists for this reason
- **Transformation fatigue**: Long migrations exhaust teams. Keep each transformation step small enough to complete in days, not weeks. Celebrate milestones to maintain momentum
## See Also
- `assess-form` — prerequisite assessment determines if system ready for transformation
- `dissolve-form` — for systems too rigid to transform directly; dissolution creates seams needed here
- `repair-damage` — recovery skill for when transformation introduces damage
- `shift-camouflage` — surface adaptation may suffice without deep architectural change
- `coordinate-swarm` — swarm coordination informs sequencing of transformation across distributed systems
- `scale-colony` — growth pressure is common trigger for architectural adaptation
- `implement-gitops-workflow` — GitOps provides deployment infrastructure for progressive cutover
- `review-software-architecture` — complementary review skill for evaluating target architecture
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!