Skip to content
Back to skills

Stakeholder Communication Plan

ASecurity

Builds a stakeholder communication plan by segmenting audiences on the power/interest grid and mapping each segment's position on the ADKAR change curve, defining objective, message, channel, cadence, and owner per segment. Use when a change effort needs more than a generic \"keep stakeholders informed\" line and different groups actually need different messages.

  • 2 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added September 6, 2026
ai-agentsgorails

Security analysis

A100/100

Scanned September 6, 2026

npx -y skills add Pilot2Service/AI-Business-Designer --skill stakeholder-communication-plan --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Stakeholder Communication Plan?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Stakeholder Communication Plan
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/pilot2service-stakeholder-communication-plan/badge)](https://www.skillsdirectory.com/skills/pilot2service-stakeholder-communication-plan)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: stakeholder-communication-plan
description: "Builds a stakeholder communication plan by segmenting audiences on the power/interest grid and mapping each segment's position on the ADKAR change curve, defining objective, message, channel, cadence, and owner per segment. Use when a change effort needs more than a generic \"keep stakeholders informed\" line and different groups actually need different messages."
---

# Stakeholder Communication Plan

## Purpose

Builds a communication plan for different stakeholders during a change.

## Anchored in research

- LinkedIn Skills on the Rise 2026 — Executive & Stakeholder Communication
- Hiatt, Jeff / Prosci — the ADKAR model (Awareness, Desire, Knowledge,
  Ability, Reinforcement): communication objectives shift over the course of
  a change effort, and a message that's right for building Awareness is the
  wrong message for driving Reinforcement.
- Mendelow (1991) — the Power/Interest stakeholder grid, used to decide the
  intensity and directness of communication for each stakeholder segment.

## Method

1. **Segment stakeholders by power and interest** (Mendelow) — this
   determines communication intensity and directness per group, not just who
   gets an email versus who gets a meeting.
2. **Map each segment's current position on the ADKAR curve** (Awareness →
   Desire → Knowledge → Ability → Reinforcement). A stakeholder who isn't yet
   aware of the change needs a different message than one who already knows
   about it but hasn't bought in.
3. **Define, per segment: objective, key message, channel, cadence, and
   owner.** The objective should be the specific ADKAR gap that segment is
   at (build awareness / build desire / build ability / etc.), not a generic
   "keep informed."
4. **Sequence the messages against the change timeline** — early messages
   build awareness and the case for change; messages closer to go-live shift
   toward ability and readiness; post-go-live messages reinforce the change
   and prevent backsliding.
5. **Build in a feedback loop per segment** — a way for the message to
   travel back (Q&A, a pulse survey, sponsor office hours), not just
   outward broadcast. A plan with no return channel can't detect resistance
   early.
6. **Name a single owner per message-channel pair** who is accountable for
   it actually going out — a plan nobody owns doesn't get executed.

## What this skill does NOT do

- Doesn't make the final decision for you — it produces a structured draft to
  support a human decision.
- Doesn't confirm figures, market data, or competitor data from memory — it
  uses the inputs you provide, or marks an assumption clearly
  (`[assumption — verify]`).
- Doesn't execute the communication for you — it produces the plan and the
  message framework.

## Refinement notes

Areas to keep deepening with real practice:

- your own rules of thumb and heuristics for this technique
- concrete templates (into [`../../references/`](../../references/))
- reference cases / your own examples
- what this skill deliberately does *not* do (guardrails, common mistakes) —
  add to the list above

This is an internal working note, not a claim about the skill's current
usability. Track depth privately via the `maturity` field in
`skills_index.json` (see
[`../../../meta/maturity_levels.md`](../../../meta/maturity_levels.md)).
**Don't add new fields to the frontmatter** — `name` and `description` are
the only ones allowed (see
[`../../../meta/frontmatter_schema.md`](../../../meta/frontmatter_schema.md)).

## Continue from here

- Next in this pack: [`../workshop-and-facilitation-design/SKILL.md`](../workshop-and-facilitation-design/SKILL.md) — Designs the structure of a cross-functional workshop or design-thinking session.
- Before this, for a single high-stakes decision-maker: [`../stakeholder-pressure-and-information-gap-mapping/SKILL.md`](../stakeholder-pressure-and-information-gap-mapping/SKILL.md)
  — this skill segments and sequences messaging across a change
  timeline; that skill closes the information gap with one specific
  decision-maker before a pitch or business case is written.
- A ready-made skill chain for this situation: see [`../../../playbooks/`](../../../playbooks/)
- This pack's shared guardrails: [`../../CLAUDE.md`](../../CLAUDE.md)

## References

- [`../../references/`](../../references/) — the pack's shared background material
- [`../../CLAUDE.md`](../../CLAUDE.md) — the pack's shared guardrails

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.