Trackbed Init

ASecurity

Internal one-time planning pipeline for Trackbed. Turns a Jira epic — or a standalone project — into an optional PRD, optional ADRs, an ordered roadmap, and (optionally) tickets, then locks the storage format in the manifest. Invoked by trackbed when no roadmap exists. Skippable when a roadmap already exists. Never user-invoked directly; never drives execution.

  • 3 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added September 24, 2026
ai-agentspythonrustgogitapi

Works with

  • api
  • mcp

Security analysis

A100/100

Scanned September 24, 2026

npx -y skills add Orfi/trackbed --skill trackbed-init --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Trackbed Init?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Trackbed Init
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/orfi-trackbed-init/badge)](https://www.skillsdirectory.com/skills/orfi-trackbed-init)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: trackbed-init
description: Internal one-time planning pipeline for Trackbed. Turns a Jira epic — or a standalone project — into an optional PRD, optional ADRs, an ordered roadmap, and (optionally) tickets, then locks the storage format in the manifest. Invoked by trackbed when no roadmap exists. Skippable when a roadmap already exists. Never user-invoked directly; never drives execution.
user-invocable: false
---
# Trackbed Init

One-time planning pipeline that converts a Jira **epic** or a standalone **project** into a roadmap (and, for epics or when wanted, tickets). You are reached **only** through `trackbed`, never invoked directly by the user. `trackbed` passes you the **anchor** (`epic` | `project`) and the **key** (epic key, or project slug). You run the ordered steps below, then stop. You do **not** execute phases — that is `trackbed-orchestrate`'s job.

Skip yourself entirely if a roadmap already exists (`trackbed` will have routed straight to orchestration instead).

## Anchor — epic vs project

- **`epic`** — `<key>` is a Jira epic key. The epic is the source of stories; ticketing is part of the flow.
- **`project`** — `<key>` is a slug (e.g. `acme-app`) for a small app with no epic. There is no epic to read; phases come from the user. **Jira is optional** — phases may stay 100% local, or be linked/created if the user wants.

`<key>` names the working directory `.trackbed/<key>/` in both anchors. Wherever a step below says "the epic", read it as "the epic (epic anchor) or the project (project anchor)".

## Hard rules (never violate)

- **Skills-first.** No required scripts, no Python dependencies. You do everything by reading and writing markdown/YAML by convention. Hooks, if present, are an optional freshness layer only — never required.
- **Firewall.** The PRD, the ADRs, and every Jira ticket must be **framework-neutral**: plain domain language only. No "phase", "roadmap", "GSD", "Trackbed", "orchestrate" vocabulary, and no `.planning/` or `.trackbed/` paths in any team-facing output. Internal phase↔ticket mapping never leaks into Jira.
- **Always ask before any Jira write.** Never auto-create or auto-link a ticket. Confirm each one.
- **Format locked once.** The storage format (`gsd` or `native`) is chosen in step 3 and written to the manifest. Never switch it mid-roadmap.
- **Re-read, don't trust memory.** Read files at the moment you need them.

## Prerequisite — the manifest

Before step 1, ensure the per-roadmap manifest exists at **`.trackbed/<key>/manifest.yml`**. This file exists in **both** GSD and native mode and **both** anchors; it is Trackbed's own pointer file and is *not* team-facing. Create it (or read it if present) and fill it in as you complete each step:

```yaml
anchor: epic | project    # from trackbed — which kind of roadmap this is
key: DEMO-100           # epic key (epic anchor) or project slug (project anchor)
format: gsd | native      # set in step 3 — locked for the life of the roadmap
shape: populated | greenfield   # set in step 0 (project anchor is always greenfield)
adr_mode: read | read-create | skip   # set in step 2 — default: read
prd_path: docs/PRD-DEMO-100.md   # set in step 1 (may be absent in project anchor)
adr_path: docs/adr/                 # set in step 2 (may be external/untracked; absent if adr_mode=skip)
onboarding_path: ONBOARDING.md      # optional — where the verification contract lives (test/build/lint commands the DoD gate uses); absent if the repo has none
roadmap_path: .planning/ROADMAP.md  # set in step 3 — see step 3 for per-mode value
created: 2026-06-13
```

Write `anchor`, `key`, and `created` now; fill the other fields as their steps complete.

## Step 0 — Determine the shape

**Project anchor:** there is no epic to inspect — set `shape: greenfield` and move on. (Phases come from the user in Step 3.)

**Epic anchor — detect, then confirm:** pull the epic's child issues via the Atlassian MCP (`mcp__atlassian__jira_get_epic_issues`, or search issues under the epic). Then **propose a shape and confirm with the user** — never proceed silently:

- **Children exist → propose `populated`.** "This epic already has N stories — build the roadmap from them (link-only), or generate phases from scratch?"
- **No children → propose `greenfield`.** "This epic has no stories — generate phases from scratch?"

Record the confirmed value in the manifest as `shape`. The shape changes how Step 3 (roadmap) and Step 4 (tickets) behave:

- **`populated`** (epic anchor only) — existing stories become the phases (Step 3 imports + orders them; Step 4 is link-only by default, create only when discussed).
- **`greenfield`** — phases are generated from the PRD + ADRs / from the user (Step 3 produces them; Step 4 is the create/link-ask, which is *optional* under a project anchor).

## Step 1 — PRD: read, create, or skip

**Project anchor:** a PRD is optional. Ask the user whether they want one; if not, leave `prd_path` absent and go to Step 2. If yes, draft it from their description (step 3 below).

**Epic anchor:**

1. Look for an existing PRD for this epic (ask the user where it lives if unclear).
2. **If it exists:** read it and understand it. Do not rewrite it.
3. **If it does not exist:** draft a PRD from the epic content (title, description, acceptance criteria pulled via the Atlassian MCP). The PRD is **team-facing** — keep it framework-neutral, plain domain language, no Trackbed jargon and no `.trackbed/`/`.planning/` paths. **Get the user's approval** before saving.
4. Record the final location in the manifest as `prd_path`.

## Step 2 — ADR: choose the mode, then delegate

First, **ask the user how to handle ADRs for this epic/project** and record the answer in the manifest as `adr_mode` (default `read`):

- **`read`** (default) — read existing ADRs to inform ordering; never create.
- **`read-create`** — read existing ADRs and propose new ones for genuine gaps (with user approval).
- **`skip`** — no read, no create. Use when ADRs are irrelevant or handled elsewhere. Skip the rest of this step and leave `adr_path` absent.

Unless `adr_mode` is `skip`, **delegate this step to the `trackbed-adr` skill** — do not scan or author ADRs yourself. Pass it the `adr_mode` so it knows whether creation is permitted:

- `read` → `trackbed-adr` resolves the location, reads existing ADRs, and reports the relevant decisions. It creates nothing.
- `read-create` → same, plus it may propose a new ADR for a genuine gap (user approves).

When it returns (and `adr_mode` ≠ `skip`), record the resolved ADR location in the manifest as `adr_path`. ADRs are **team-facing** — the firewall applies.

## Step 3 — Roadmap: produce it and lock the format

Build the **ordered phases**, branching on the `shape` from Step 0. Either way, each phase needs:
   - `id` — sequential (decimal insertions like `11.2` are allowed later at runtime)
   - `scope` — one-line description of what the phase delivers
   - `depends` — list of phase ids it depends on (`[]` if none)
   - `done` — explicit done-criteria (e.g. `"code + gates"`)

### If `shape: populated` (roadmap from existing stories)

1. Take the epic's child stories (from Step 0). **Import them as phases — 1:1 baseline** (one story → one phase), pre-filling each phase's `jira:` with the existing story key.
2. Derive `scope` from each story's summary, then add the **ordering**: assign `depends` edges and an explicit `done` per phase. This ordering + dependency layer is the roadmap's main value over a flat story list.
3. **Discuss net-new phases/stories with the user.** If the existing stories leave gaps (setup, integration, cross-cutting work), propose **new phases** — and, where a new phase needs its own ticket, a **new story** — but only after discussing with the user. Do not invent phases or tickets silently.
4. Use the PRD + ADRs (Steps 1–2) to inform ordering and to surface gaps, not to override the existing stories.

### If `shape: greenfield` (phases from scratch)

1. Break the work into ordered phases with the fields above, informed by the PRD (Step 1, if any) and the ADRs (Step 2). For an **epic anchor**, source the breakdown from the epic + PRD. For a **project anchor**, source it from the user's description of the app — work *with the user* to define the phases. Leave `jira:` empty (ticketed in Step 4, which is optional under a project anchor).

### Then, for both shapes — lock the format

1. **Ask the format switch now:** "Store this roadmap in GSD mode (`.planning/`) or native Trackbed mode (`.trackbed/<key>/`)?" Record the answer in the manifest `format` field. **This is locked for the life of the roadmap.** (For a project anchor, native mode is usually the natural choice — no Jira board required.)
2. Write the roadmap in the chosen format and set `roadmap_path` in the manifest accordingly:
   - **GSD mode** → write/update GSD's `.planning/ROADMAP.md`; `roadmap_path: .planning/ROADMAP.md`. Do **not** alter GSD's roadmap format. Then create/update `.planning/STATE.md` from GSD's own state template (Current Position → first phase, Session Continuity initialized) — STATE.md is GSD's state layer; let GSD's tooling keep owning its shape.
   - **Native mode** → write `.trackbed/<key>/roadmap.yml`; `roadmap_path: .trackbed/<key>/roadmap.yml`. Use the native phase shape:

```yaml
anchor: epic              # or: project
key: DEMO-100           # epic key, or project slug (e.g. acme-app)
phases:
  - id: "11.1"
    scope: "API-key validation — remove legacy auth fallback"
    depends: []
    done: "code + gates"
    jira:                  # left empty here — ticketed in step 4 (optional under a project anchor)
    status: todo           # persisted status ∈ todo | current | blocked | done ("next" is computed, never stored)
    inserted: false        # true for a runtime decimal insertion (mirrors GSD's "(INSERTED)" marker)
    owes: []
    notes: |
```

   Then create `.trackbed/<key>/state.yml` — the cross-phase digest (mirrors GSD's STATE.md fields), re-read first on every orchestration turn:

```yaml
anchor: epic
key: DEMO-100
current:
  phase: "11.1"            # fast pointer; the authoritative status still lives on the phase
  status: ready-to-plan    # ready-to-plan | planning | in-progress | phase-complete
  last_activity: "2026-06-13 — roadmap created"
blockers: []               # cross-phase concerns, prefixed with originating phase id
session:
  stopped_at: "roadmap created, nothing executed yet"
  resume_hint: "hand off phase 11.1"
```

**Phase ordering (native mode):** order and walk phases by **dotted-segment id comparison**, like version numbers — compare segment by segment as integers, not by numeric value (so `3 → 3.1 → 3.2 → 3.2.1 → 3.3 → 4`, arbitrary depth). `depends` gates *eligibility*; the dotted-id order sets the *walk*. GSD mode inherits GSD's own numeric ordering — don't impose this on it.

The roadmap, `state.yml`, and `phase-jira.md` are internal scaffolding (`.trackbed/` and `.planning/` are deleted manually at the very end, just before the final PR — never gitignored), so phase ids, dependencies, and Trackbed vocabulary are fine here — they just never reach Jira.

## Step 4 — Tickets: create or link, always ask

**Project anchor — Jira is optional.** First ask the user whether this project should use Jira at all. If **no**, skip this entire step: phases stay local with `jira:` empty, and the roadmap is purely local. The user can opt into ticketing later (it runs the same way then). If **yes**, proceed as below. Under an **epic anchor**, this step always runs.

In the **`populated`** shape most phases already carry their story key from Step 3, so this step is largely a no-op (skip every phase that already has a real key). It still runs for any net-new phases you discussed in Step 3. In the **`greenfield`** shape every phase starts empty, so this is the full create/link pass.

For each phase in the roadmap, inspect its **Jira link state** (identical three-state model to `trackbed-orchestrate` and spec §4.3):

| `jira:` value | Meaning | Action |
|---|---|---|
| `DEMO-...` (a real key) | Linked — ticket exists on the board | Already done — skip it |
| absent / empty | **Not yet ticketed** | **Ask:** "create a new ticket or link an existing one?" |
| `pending` | Decided to create, write not yet completed | Finish the create, then overwrite with the real key |

For an empty phase:

- If **link** → record the existing key the user gives you.
- If **create** → optionally set `jira: pending` to mark intent, then write the ticket via the Atlassian MCP only after the user confirms the ticket text, then overwrite `pending` with the real key. The ticket body must be **framework-neutral** (firewall): describe the work in domain terms, no phase ids, no roadmap/Trackbed/GSD words, no `.trackbed/`/`.planning/` paths.

Write every resulting key back into the phase↔ticket mapping, **per mode**:
- **Native mode** → the phase's own `jira:` field in `roadmap.yml`. The roadmap *is* the mapping — no separate file.
- **GSD mode** → a separate Trackbed-owned file `.trackbed/<key>/phase-jira.md` (a simple `phase-id → JIRA-KEY` table). **Never modify GSD's `ROADMAP.md` to hold the key.** This file is internal scaffolding (deleted at the end with the rest of `.trackbed/`).

**Idempotency:** only act on phases whose `jira:` is empty/absent **or** `pending`; never re-touch a phase that already carries a real key. Re-running this step is therefore safe.

## Done criteria

Stop when **all** of these hold:
- the roadmap exists in the locked format, and the state file exists alongside it (`.planning/STATE.md` in gsd mode, `.trackbed/<key>/state.yml` in native mode),
- tickets are reconciled per anchor: **epic anchor** → every phase ticketed (linked or created, real keys written back); **project anchor** → either every phase ticketed (if the user opted into Jira) or all phases intentionally local,
- the manifest is written with `anchor`, `key`, `shape`, `format`, `adr_mode`, `roadmap_path`, and (when applicable) `prd_path`, `adr_path`, and `onboarding_path` (each omitted when not produced / not present).

Return control to `trackbed`, which hands off to `trackbed-orchestrate`. You do **not** drive execution.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.