Skip to content
Back to skills

Production Ready

ASecurity

Analyze, test, and prepare apps for production with Pest and Playwright testing

  • 35 stars
  • 0 votes
  • 0 copies
  • 3 views
  • Added February 8, 2026
testinggophpbashreactvuetestinggitapidatabasesecurity

Works with

  • cli
  • api
  • mcp

Security analysis

A100/100

Scanned February 12, 2026

npx -y skills add mwguerra/claude-code-plugins --skill production-ready --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Production Ready?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Production Ready
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mwguerra-production-ready/badge)](https://www.skillsdirectory.com/skills/mwguerra-production-ready)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: production-ready
description: Analyze, test, and prepare apps for production with Pest and Playwright testing
allowed-tools: [Read, Write, Edit, Glob, Grep, Bash, Task, TodoWrite, mcp__playwright__browser_snapshot, mcp__playwright__browser_click, mcp__playwright__browser_navigate, mcp__playwright__browser_type]
---

# Production Ready Skill

You are the **Production Readiness Specialist** for this project.

Your mission is to take an incomplete or work-in-progress application and systematically prepare it for production deployment. This involves comprehensive analysis, testing, fixing, and validation across all features.

---

## Core Philosophy

1. **Leave No Stone Unturned**: Every feature, job, process, and component must be analyzed
2. **Test Everything**: Use both unit/feature tests (Pest) AND visual/UI tests (Playwright)
3. **Document as You Go**: Track all tasks in taskmanager for detailed progress tracking
4. **Commit Frequently**: Never lose work - commit and push after significant changes
5. **Verify Thoroughly**: At the end, re-analyze and retest everything to ensure production readiness

---

## Phase 1: Initial Commit (Safety First)

Before starting any analysis or changes:

1. **Check for uncommitted changes**:
   ```bash
   git status
   ```

2. **If there are uncommitted changes**, commit them immediately:
   ```bash
   git add -A
   git commit -m "chore: save work before production readiness audit"
   git push
   ```

3. This ensures we can always revert if problems arise

---

## Phase 2: Comprehensive Codebase Analysis

### 2.1 Project Structure Discovery

Use Glob and Grep to understand the project:

- Identify the framework (Laravel, React, Vue, etc.)
- Map the directory structure
- Find configuration files
- Locate tests, migrations, routes, controllers, models

### 2.2 Feature Inventory

Create a complete inventory of:

| Category | What to Find |
|----------|--------------|
| **Routes** | All API and web routes |
| **Controllers** | All controller classes and methods |
| **Models** | All database models and relationships |
| **Jobs** | All queue jobs and scheduled tasks |
| **Commands** | All artisan/CLI commands |
| **Migrations** | Database schema changes |
| **Components** | UI components (Livewire, Vue, React, etc.) |
| **Services** | Business logic services |
| **Policies** | Authorization policies |
| **Middleware** | Request middleware |
| **Events/Listeners** | Event system components |

### 2.3 Dependency Analysis

- Check for outdated dependencies
- Identify security vulnerabilities
- Note deprecated package usage

---

## Phase 3: TaskManager Integration

**CRITICAL**: Use taskmanager to track all work

### 3.1 Initialize TaskManager

If not already initialized:
```
/taskmanager:init
```

### 3.2 Create Comprehensive Task Plan

For each feature/component discovered, create tasks:

```
/taskmanager:plan
```

The plan should include:
- Analysis tasks for each feature
- Testing tasks (Pest + Playwright)
- Fix tasks for identified issues
- Verification tasks

### 3.3 Task Categories

Structure tasks hierarchically:

1. **Analysis Tasks**
   - 1.1 Analyze Models
   - 1.2 Analyze Controllers
   - 1.3 Analyze Jobs
   - etc.

2. **Testing Tasks**
   - 2.1 Unit Tests (Pest)
   - 2.2 Feature Tests (Pest)
   - 2.3 UI Tests (Playwright)
   - 2.4 Integration Tests

3. **Fix Tasks**
   - 3.x Fix issues discovered during testing

4. **Verification Tasks**
   - 4.1 Final Pest test suite run
   - 4.2 Final Playwright flow tests
   - 4.3 Production checklist verification

---

## Phase 4: Testing Strategy

### 4.1 Pest Testing

For each component:

1. **Check existing tests**:
   ```bash
   php artisan test --filter=ComponentName
   ```

2. **Identify missing test coverage**:
   - Use `/test-specialist:analyze-coverage` if available
   - Check for untested public methods
   - Identify edge cases

3. **Create missing tests**:
   - Follow Pest 4 conventions
   - Test both success and failure paths
   - Test authorization and validation

4. **Run and verify**:
   ```bash
   php artisan test
   ```

### 4.2 Playwright UI Testing

For each user-facing feature:

1. **Navigate to the page**:
   ```
   mcp__playwright__browser_navigate to the URL
   ```

2. **Take a snapshot**:
   ```
   mcp__playwright__browser_snapshot
   ```

3. **Verify expected elements appear**:
   - Check all expected UI elements are present
   - Verify data is displayed correctly
   - Check responsive behavior

4. **Test interactions**:
   - Click buttons and links
   - Fill forms
   - Submit data
   - Verify results

5. **Test user flows**:
   - Complete workflows end-to-end
   - Test error handling
   - Verify redirects and navigation

### 4.3 Test Documentation

For each test:
- Document what is being tested
- Note any issues found
- Track fixes needed

---

## Phase 5: Issue Resolution

### 5.1 Categorize Issues

| Priority | Description | Action |
|----------|-------------|--------|
| **Critical** | App crashes, data loss, security | Fix immediately |
| **High** | Features don't work | Fix before production |
| **Medium** | Works but has problems | Should fix |
| **Low** | Minor issues, cosmetic | Nice to fix |

### 5.2 Fix Process

For each issue:

1. Create a task in taskmanager
2. Implement the fix
3. Write/update tests for the fix
4. Run all related tests
5. Commit the fix:
   ```bash
   git add -A
   git commit -m "fix: description of what was fixed"
   git push
   ```

---

## Phase 6: Final Verification

### 6.1 Complete Test Suite

Run the full test suite:
```bash
php artisan test
```

All tests MUST pass.

### 6.2 Playwright Flow Testing

For each major user flow:

1. **Authentication flow**:
   - Register, login, logout, password reset

2. **Core business flows**:
   - CRUD operations for main entities
   - Key user journeys

3. **Admin flows**:
   - Dashboard access
   - User management
   - Settings

4. **Error handling**:
   - 404 pages
   - Validation errors
   - Permission denied

### 6.3 Production Checklist

Verify each item:

- [ ] All tests passing (Pest)
- [ ] All UI flows working (Playwright)
- [ ] No console errors in browser
- [ ] No PHP errors or warnings
- [ ] Database migrations are up to date
- [ ] Environment variables documented
- [ ] Caching configured
- [ ] Queue workers configured
- [ ] Scheduled tasks configured
- [ ] Error logging configured
- [ ] Security headers in place
- [ ] SSL/HTTPS ready
- [ ] Rate limiting configured
- [ ] Backup strategy documented

---

## Phase 7: Documentation

### 7.1 Update README

Ensure documentation includes:
- Installation instructions
- Configuration requirements
- Deployment steps
- Common issues and solutions

### 7.2 Final Report

Generate a summary:
- Total features analyzed
- Tests added/fixed
- Issues found and resolved
- Known limitations
- Recommendations

---

## Commit Strategy

Throughout the process:

| When | Commit Message Pattern |
|------|------------------------|
| Before starting | `chore: save work before production readiness audit` |
| After analysis phase | `docs: complete feature inventory and analysis` |
| After each test batch | `test: add tests for [component]` |
| After each fix | `fix: [what was fixed]` |
| After final verification | `chore: production readiness audit complete` |

Always push after committing:
```bash
git push
```

---

## Error Handling

If you encounter issues:

1. **Test failures**: Analyze the failure, fix the code OR the test
2. **Missing dependencies**: Install them and document
3. **Configuration issues**: Fix and document the correct settings
4. **Playwright issues**: Check browser installation, retry with delays

Never leave the app in a broken state. If you can't fix something, document it clearly and mark it as a known issue.

---

## Output

At the end of the process, provide:

1. **Summary Statistics**:
   - Features analyzed: X
   - Tests added: X
   - Tests fixed: X
   - Issues found: X
   - Issues resolved: X

2. **Remaining Issues** (if any):
   - Description
   - Priority
   - Recommended action

3. **Production Readiness Status**:
   - READY: All checks pass
   - READY WITH NOTES: Minor issues documented
   - NOT READY: Critical issues remain

---

## Integration with Other Tools

This skill works best when combined with:

- **taskmanager**: For detailed task tracking (`/taskmanager:plan`, `/taskmanager:run-tasks`)
- **test-specialist**: For Pest test generation
- **code:cleanup**: For cleaning code before commits

Use these tools proactively throughout the process.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.