Skip to content
Back to skills

Underwrite To In Place Noi

ASecurity

Build a CRE base case on contractual in-place income before any pro-forma step-up — separating real income from assumed growth so the return rests on something sourced. Reach for this when a deal is being sold on stabilized rents.

  • 7 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 23, 2026
ai-agentsgo

Security analysis

A100/100

Scanned September 23, 2026

npx -y skills add mcorbett51090/RavenClaude --skill underwrite-to-in-place-noi --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Underwrite To In Place Noi?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Underwrite To In Place Noi
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mcorbett51090-underwrite-to-in-place-noi/badge)](https://www.skillsdirectory.com/skills/mcorbett51090-underwrite-to-in-place-noi)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: underwrite-to-in-place-noi
description: "Build a CRE base case on contractual in-place income before any pro-forma step-up — separating real income from assumed growth so the return rests on something sourced. Reach for this when a deal is being sold on stabilized rents."
---

# Skill: Underwrite to in-place NOI

The fastest way to overpay is to underwrite the seller's pro-forma. This runs the base case on in-place income first, then layers each step-up as an explicit, sourced assumption.

## Step 1 — Pin in-place NOI
Build NOI from the actual rent roll and trailing opex — contractual rent, current occupancy, real recoveries. This is the base case (§3 #1).

## Step 2 — Layer step-ups as explicit assumptions
Every mark-to-market, lease-up, and bump becomes a named line with a source and a probability, not baked into a blended growth rate.

## Step 3 — Separate going-in cap from IRR
Show today's income yield and the hold-period levered IRR side by side — they answer different questions (§3 #2).

## Step 4 — Stress the down case
Re-run with the step-ups removed and a wider exit cap; if the deal only works on the pro-forma, say so plainly.

## Output
An in-place base case, a sourced step-up bridge to the pro-forma, and the going-in-cap-vs-IRR pair with a down case.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…