Skip to content
Back to skills

Track Cost Vs Bid

ASecurity

Track cost against the bid line by line and watch contingency burn, so overage is managed not discovered. Reach for this during production.

  • 7 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added September 23, 2026
ai-agentsgo

Security analysis

A100/100

Scanned September 23, 2026

npx -y skills add mcorbett51090/RavenClaude --skill track-cost-vs-bid --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Track Cost Vs Bid?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Track Cost Vs Bid
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mcorbett51090-track-cost-vs-bid/badge)](https://www.skillsdirectory.com/skills/mcorbett51090-track-cost-vs-bid)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: track-cost-vs-bid
description: "Track cost against the bid line by line and watch contingency burn, so overage is managed not discovered. Reach for this during production."
---

# Skill: Track cost vs bid

Contingency is tracked, not raided silently.

## Step 1 — Set the bid baseline
The approved budget by category (§3 #4).

## Step 2 — Track actuals
Committed and actual cost against each line.

## Step 3 — Watch the contingency
Monitor contingency burn against the remaining risk.

## Step 4 — Forecast the overage
Project final cost vs bid and flag the exposure.

## Output
A cost-vs-bid report by category with contingency burn and an overage forecast.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…