Read the interconnection queue, study sequence, and likely upgrade allocation as the project's schedule and cost risk. Reach for this before committing a schedule.
Installs into .claude/skills of the current project.
Are you the author of Model The Interconnection Queue?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/mcorbett51090-model-the-interconnection-queue)
---
name: model-the-interconnection-queue
description: "Read the interconnection queue, study sequence, and likely upgrade allocation as the project's schedule and cost risk. Reach for this before committing a schedule."
---
# Skill: Model the interconnection queue
Interconnection gates most projects more than construction does.
## Step 1 — Read the queue position
Where the project sits and the study sequence/timeline (§3 #2).
## Step 2 — Anticipate upgrades
Likely network-upgrade allocation and its cost.
## Step 3 — Frame the schedule risk
Map the interconnection milestones onto the development critical path.
## Step 4 — Price the risk
Put the upgrade-cost and delay risk into the economics.
## Output
A queue read, an upgrade-cost estimate, the schedule-risk mapping, and the priced risk.