Skills DirectorySkills Directory
SkillsLearnSecurityCategoriesDocsBlogPro
Sign InSubmit Skill
Skills Directory

Security-tested agent skills for Claude, coding agents, and AI workflows.

Directory

  • Browse Skills
  • All Skills A–Z
  • Claude Skills
  • Claude Code Skills
  • Agent Skills
  • Categories
  • Authors
  • Submit a Skill

Learn

  • Learn Hub
  • Install Claude Skills
  • Write SKILL.md
  • Skills vs MCP
  • Directories Compared

Security

  • Security
  • Methodology
  • Secure Claude Skills
  • Security Badges
  • Chrome Extension
  • Skill Manager

Company

  • About
  • Community
  • Blog
  • API Docs
  • Advertise

2026 Skills Directory. All rights reserved.

ProTermsPrivacyRefunds
Back to skills

Cpm Scheduling

ASecurity

Build and maintain a CPM schedule: activity list, durations, logic ties (FS/SS/FF), critical-path calculation, float analysis, baseline establishment, weekly updates, look-ahead schedules, delay analysis (as-planned vs. as-built, TIA), and recovery scheduling. Tool-agnostic; notes P6 and MS Project specifics.

7 stars
0 votes
0 copies
0 views
Added 9/23/2026
ai-agentsgoperformancedocumentation

Security Analysis

A100/100

Scanned 9/23/2026

$npx -y skills add mcorbett51090/RavenClaude --skill cpm-scheduling --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Cpm Scheduling?

Add the live security badge to your README — it updates automatically with every re-scan.

Security grade badge for Cpm Scheduling
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/mcorbett51090-cpm-scheduling/badge)](https://www.skillsdirectory.com/skills/mcorbett51090-cpm-scheduling)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
Files
SKILL.md
---
name: cpm-scheduling
description: "Build and maintain a CPM schedule: activity list, durations, logic ties (FS/SS/FF), critical-path calculation, float analysis, baseline establishment, weekly updates, look-ahead schedules, delay analysis (as-planned vs. as-built, TIA), and recovery scheduling. Tool-agnostic; notes P6 and MS Project specifics."
---

# CPM Scheduling

**Purpose:** produce a CPM schedule that is the project's primary contract management tool —
not a Gantt chart decoration — and maintain it as a living document from baseline to closeout.

---

## Step 1 — Build the Work Breakdown Structure (WBS)

1. Organize by area (building/floor/zone) + phase (sitework, foundations, structure, enclosure,
   MEP rough-in, finishes, commissioning) OR by CSI division — whichever matches the contract
   milestones.
2. Keep activities at the right level: too coarse (one activity per trade) → can't manage it;
   too fine (every bolt torqued) → can't maintain it. Rule of thumb: activity duration 1–15
   working days.

## Step 2 — Activity list and durations

For each activity:
- **Description:** clear, starts with a verb (Install, Pour, Frame, Erect).
- **Duration:** computed from quantity ÷ productivity (e.g., 200 CY concrete ÷ 50 CY/crew-day
  = 4 days). Document the productivity assumption. Don't guess.
- **Calendar:** standard 5-day, 6-day, or project calendar with holidays and weather days.
- **Resources:** crew type and size (if resource-loading).

## Step 3 — Logic ties

**Every activity must have a predecessor AND a successor, except the project start and project
finish milestones.**

| Dependency type | When to use |
|---|---|
| Finish-to-Start (FS) | Default: B cannot start until A finishes |
| Start-to-Start (SS) with lag | B can start X days after A starts (concurrent work) |
| Finish-to-Finish (FF) with lag | B must finish within X days of A finishing |

- Document why each non-FS relationship exists.
- Use lags sparingly and only for real constraints (cure time, permit lead time). Hidden float
  disguised as a lag is a CPM anti-pattern.

## Step 4 — Critical-path calculation

The CPM algorithm (forward pass / backward pass):

- **Forward pass:** Early Start (ES) and Early Finish (EF) for each activity.
- **Backward pass:** Late Start (LS) and Late Finish (LF).
- **Total Float (TF)** = LS − ES = LF − EF. Activities with TF = 0 are on the critical path.
- **Free Float (FF)** = ES(successor) − EF(activity). Float that belongs to this activity.

Near-critical path: activities with TF ≤ 5 days. Flag these — they become critical with any
small disruption.

## Step 5 — Baseline establishment

1. Get the baseline approved (owner, GC PM, major subs) before work starts.
2. Save the baseline as a locked copy. Never overwrite the baseline.
3. Record the data date (status date) of the baseline.
4. Update against the baseline — the delta between baseline and current is the schedule variance.

## Step 6 — Weekly schedule updates

1. Enter actual start and finish dates for completed activities.
2. For in-progress activities: enter actual start + remaining duration (or % complete).
3. Revise logic ties only where field conditions have genuinely changed (document the reason).
4. Run the CPM recalculation. Identify the new critical path.
5. Report: SPI (Schedule Performance Index = earned value ÷ planned value if cost-loaded),
   critical-path change from last update, float trend.

## Step 7 — Look-ahead schedule

Extract from the CPM: all activities scheduled to start or continue in the next 3 (or 6) weeks.
Field format: date rows, trade columns, activity descriptions. Add:
- Predecessor completions required this week
- Material deliveries expected
- Submittals whose approval is needed before work starts
- Open RFIs blocking this scope

## Step 8 — Delay analysis

When a delay occurs, document it real-time (don't reconstruct later):

| Method | When to use |
|---|---|
| As-planned vs. as-built | Simple projects; compare baseline dates to actual dates by activity |
| Windows (contemporaneous path) | Complex projects; divide the project into analysis windows, analyze each window separately |
| Time Impact Analysis (TIA) | For prospective or concurrent delay; model the impacted baseline with a fragnet |

For each delay:
- **Excusable / non-compensable** — force majeure, owner-caused weather (owner grants time only)
- **Excusable / compensable** — owner-caused delay (owner grants time + costs)
- **Non-excusable** — contractor-caused (no time extension; may owe LDs)
- **Concurrent delay** — both parties contributed; entitlement is jurisdiction-specific

## Submittal integration in CPM

Add submittal lead times as a chain of activities:
`Sub prepares submittal → GC review → Transmit to A/E → A/E review (contract days) → Approval
→ Procurement → Fabrication → Delivery → Installation`

These chains often run 8–20 weeks for MEP equipment. If they're not in the schedule, you
won't see the procurement squeeze coming.

---

## Anti-patterns

- Activities with no predecessor or no successor (except start/finish).
- Float disguised as inflated durations or hidden lags.
- A "schedule update" that only extends the finish date without a recovery narrative.
- Delay analysis done from memory months after the fact — contemporaneous documentation is
  the only defensible record.

## Output

A CPM schedule in P6 (.xer) or MS Project (.mpp), plus a schedule narrative: critical path,
float summary, key milestones, top-3 schedule risks.

Attribution

mcorbett51090mcorbett51090
View sourceSee grades on GitHubMore from mcorbett51090 →
SSkills DirectorySkills Directory

Ship a skill? Prove it's safe.

Free 120-pattern security scan, letter grade, and an embeddable README badge.

Submit a skill

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments (0)

No comments yet. Be the first to comment!

SSkills DirectorySkills Directory

Ship a skill? Prove it's safe.

Free 120-pattern security scan, letter grade, and an embeddable README badge.

Submit a skill

Related Skills

Caveman

Terse caveman voice: answer first, fluff gone, every technical fact kept. Use for /caveman, "caveman mode", "talk like caveman", "be brief", "less tokens". Stays on until "stop caveman" or "normal mode".

1100021 votes

Hyperplan

Adversarial multi-agent planning skill. Self-orchestrates 5 hostile category members (unspecified-low, unspecified-high, deep, ultrabrain, artistry) via team-mode for ruthless cross-critique debate, distills only the defensible insights, then MANDATORILY hands the distilled insight bundle to the `plan` agent for executable plan formalization. Use when planning needs maximum rigor and surfacing of weak assumptions, blind spots, and over-engineering. Triggers: 'hyperplan', 'hpp', '/hyperplan', ...

698621 votes

Writing Skills

Create and manage Claude Code skills in HASH repository following Anthropic best practices. Use when creating new skills, modifying skill-rules.json, understanding trigger patterns, working with hooks, debugging skill activation, or implementing progressive disclosure. Covers skill structure, YAML frontmatter, trigger types (keywords, intent patterns), UserPromptSubmit hook, and the 500-line rule. Includes validation and debugging with SKILL_DEBUG. Examples include rust-error-stack, cargo-dep...

3931 votes

Mcp Code Execution

Routes multi-tool workflows through MCP servers for large datasets and pipelines. Use when Bash tool overhead is limiting throughput on data-heavy tasks.

3421 votes

catchup

Recovers the conversation and failed tool calls of a previous Codex, Amp, Claude Code, Antigravity, Cline, Copilot CLI, Cursor, DeepSeek Harness, Grok Build, Kimi, OpenCode, Pi Agent, or ZCode session. Use when the user says "catch up", "what did the last session do", "get me up to speed", "I switched agents", asks to recover/summarize a previous session before continuing, or asks to diagnose or report a catchup failure. Do NOT use for the current conversation, git history, or any non-agent log.

741 votes
View all in ai-agents →