Skip to content
Back to skills

Contract Builder

ASecurity

Maintain an execution contract only for an existing legacy change that requires one. New direct/planned changes do not invoke this skill when a contract is absent.

  • 819 stars
  • 0 votes
  • 0 copies
  • 1 view
  • Added August 31, 2026
ai-agentsbashnoderails

Works with

  • cli

Security analysis

A100/100

Scanned September 24, 2026

npx -y skills add MageByte-Zero/spec-superflow --skill contract-builder --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Contract Builder?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Contract Builder
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/magebyte-zero-contract-builder/badge)](https://www.skillsdirectory.com/skills/magebyte-zero-contract-builder)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: contract-builder
description: Maintain an execution contract only for an existing legacy change that requires one. New direct/planned changes do not invoke this skill when a contract is absent.
---

# Contract Builder

## Bundled runtime

Before executing a CLI line below, replace its leading `SSF` with `node "<plugin-root>/scripts/spec-superflow.mjs"`; `<plugin-root>` is the absolute directory two levels above this file. Never run `SSF` literally or call an `ssf` from `PATH`.

Legacy compatibility only: new planned changes use proposal.md + tasks.md and `SSF workflow start --path planned`. Do not generate a contract or request a second approval for them. Read the remaining instructions only for an existing legacy change.

Converts planning artifacts into a single execution handshake: `execution-contract.md`. Load the baseline with `SSF runtime asset read templates/execution-contract.md`.

Read before generating: `.spec-superflow.yaml` (especially `dp_0_decisions`),
`proposal.md`, `specs/`, `design.md`, `tasks.md`, then load
`docs/artifact-contract.md` with `SSF runtime asset read docs/artifact-contract.md`.

Enter `bridging` before writing the contract; skip the transition if already there. Honor configured specs/design omissions. Reference requirement IDs and task IDs instead of copying their full text; preserve scope, obligations, tests, and review policy.

## Artifact Language

Read `artifact_language=<concrete-language>` from `dp_0_decisions`. Generate
`execution-contract.md` in the same language as that resolved value and the
approved planning artifacts. Preserve required schema keywords and code
identifiers verbatim; language consistency applies to explanatory prose and
headings. If the concrete artifact language is missing or still `auto`, route
back to `workflow-start` before writing the contract instead of guessing or
silently defaulting to English.

## Artifact Mapping

| Source | Extract |
|--------|---------|
| `proposal.md` → `## Why` + `## What Changes` | Intent Lock (problem + scope) |
| `proposal.md` → `## Scope > ### Out of Scope` | Scope Fence |
| `specs/` → each `### Requirement:` | Approved Requirements, Scenarios, Test Obligations |
| `design.md` → `## Decisions` | Architecture, Interface, Dependency Constraints |
| `tasks.md` → numbered task groups | Execution Batches, Completion Definitions, Review Timing |

## Cross-Check: Requirement Coverage

Before finalizing:
1. List every SHALL/MUST from `specs/`
2. Verify each is reflected in Approved Behavior, has a test obligation, and appears in at least one batch
3. Flag unmapped requirements in Escalation Rules
4. Note cross-batch dependencies

## Contract Structure

Must make obvious: approved behavior, out-of-scope, constraints, batches, test obligations, review gates, and conditions that force a rewind to planning. Prefer compression over repeating planning details.

## Approval Model (DP-3)

After drafting: summarize handoff rules, identify ambiguity and flag unmapped requirements. Reuse explicit approval already covering this exact contract; otherwise request it once, together with any still-pending planning decisions and the default Native execution choice. Approval of scope alone does not approve a contract that has not been shown. Never ask the user to approve the same unchanged contract twice. After approval:
```bash
SSF state set <change-dir> dp_3_result "approved: <summary>"
SSF state set <change-dir> dp_3_timestamp now
SSF state rebuild <change-dir>
```

Advance the state after approval:
```bash
SSF state transition <change-dir> approved-for-build
```

DP-3 is a hard gate — no implementation without this record.

## Stale Contract Detection

Refresh if: scope changed in proposal, requirements changed in specs, constraints changed in design, batches changed materially in tasks, or the contract no longer matches intent.

## Hotfix Mode

Generate a minimal contract only for a legacy Hotfix: Intent Lock (one sentence), Task List (numbered), Approval Gate (DP-3). Skip Scope Fence, Build Rules, Review Gates, Test Evidence. Still requires DP-3 approval. Quick direct execution and direct incident Hotfix do not invoke this skill; they use the signed receipt and finish with `test_result: pass` instead.

## Guardrails

- Do not continue to implementation if ambiguity remains
- Do not approve the contract on the user's behalf
- Do not skip the contract because planning docs look complete
- Flag unmapped requirements; do not silently drop them

## Post-Generation

The approved contract is recorded by `state rebuild` in the DP-3 sequence above, before the guarded transition. This applies to Full and legacy Hotfix. Do not refresh hashes merely to suppress an unapproved content change.

## Exception Handling

- **Parse failures**: Report specific file and section. Suggest re-running `spec-writer`.
- **Missing files**: List every missing artifact. Route back to `spec-writer`.
- **User interruption**: Re-read all artifacts on resume; check contract staleness via content comparison.
- **Validation failure**: Flag unmapped requirements in Escalation Rules and approval summary.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.