Turn a messy business situation into a full deliverable set with an explicit artifact contract — Word, PowerPoint, Excel, PDFs, press releases, FAQs — and verify each file is real (not HTML with a wrong extension). Use when a client engagement, proposal, or agent task requires multiple coordinated output formats.
Installs into .claude/skills of the current project.
Sponsors
SSkills DirectorySkills Directory
Know which skills are safe — weekly.
SSkills DirectorySkills Directory
Is that skill safe to install?
Are you the author of Multi Artifact Work Package?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/m2ai-portfolio-multi-artifact-work-package)
---
name: multi-artifact-work-package
description: Turn a messy business situation into a full deliverable set with an explicit artifact contract — Word, PowerPoint, Excel, PDFs, press releases, FAQs — and verify each file is real (not HTML with a wrong extension). Use when a client engagement, proposal, or agent task requires multiple coordinated output formats.
---
# Multi-Artifact Work Package
Takes a business situation or client brief and produces a defined set of real deliverables with an artifact contract that specifies exactly what each file must contain. The core problem it solves: AI models frequently produce the right number of files with the right names but wrong formats — a PowerPoint that is actually HTML, a spreadsheet with no formulas, a PDF that is just a renamed text file. This skill makes the artifact contract explicit before generation begins and verifies compliance after.
## Trigger
Use when the user says "/multi-artifact-work-package", "build a deliverable package", "create a full set of client outputs", "generate artifacts for this brief", or when any task requires more than two coordinated output files in different formats.
## Phase 1: Situation Intake
Ask the user for:
1. **Business situation or brief** — free-form description of the problem, client, and goals.
2. **Audience** — who receives the deliverables (executives, board, client, internal team).
3. **Output directory** — where to write the files.
If the user provides a document or notes, read them before asking clarifying questions.
## Phase 2: Artifact Contract Definition
Before any generation, define the artifact contract explicitly. Produce a contract in this format and ask the user to confirm or edit it before proceeding:
```
ARTIFACT CONTRACT
-----------------
1. executive-summary.pptx
Format: Real PowerPoint (python-pptx)
Required: ≥ 5 slides, embedded chart, title + body text per slide
Audience: C-suite
2. financial-model.xlsx
Format: Real Excel (openpyxl)
Required: 3 sheets, ≥ 10 formula cells, named ranges, chart on Sheet 3
Audience: CFO / analyst
3. full-report.pdf
Format: PDF with selectable text (reportlab or weasyprint)
Required: ≥ 5 pages, table of contents, section headers
Audience: Full team
4. press-release.docx
Format: Real Word document (python-docx)
Required: AP-style, dateline, quote block, boilerplate footer
Audience: Media
5. faq.md
Format: Markdown
Required: ≥ 8 Q&A pairs
Audience: Internal
```
**Do not begin generation until the user approves the contract.** This is the HIL gate.
## Phase 3: Generation
For each artifact in the approved contract, generate using the appropriate library:
- **PowerPoint**: Use `python-pptx`. Never write HTML and rename it. Every slide must have a `shapes.title` and `text_frame` with real content.
- **Excel**: Use `openpyxl`. Every "formula" cell must contain an `=` expression, not a hard-coded number. Include at least one chart object.
- **PDF**: Use `reportlab` or `weasyprint`. Output must start with `%PDF-` bytes. Never rename an HTML file to .pdf.
- **Word**: Use `python-docx`. Output ZIP structure must contain `word/document.xml`.
- **Markdown / plain text**: Standard file write.
After writing each file, print its path and size.
## Phase 4: Verification
After all files are written, run artifact-contract-validator checks inline:
- Open each file and verify format authenticity (magic bytes / ZIP structure).
- Verify required contents (formula count, slide count, page count).
- Produce a pass/fail line per file.
If any file fails, regenerate that specific artifact and re-verify. Do not proceed to delivery until all contract items pass.
## Phase 5: Delivery Summary
```
DELIVERY SUMMARY
================
Directory: {path}
Generated: {date}
Artifacts
---------
{filename} {size} PASS
{filename} {size} PASS
All {n} artifacts passed contract validation. Ready for delivery.
```
## What This Does NOT Do
- Does not validate content accuracy, legal correctness, or data sourcing.
- Does not handle deliverables requiring live data connections.
- Does not replace `/artifact-contract-validator` for post-hoc audits of externally-generated files.
## Dependencies
- `/artifact-contract-validator` — called inline in Phase 4; install first if running standalone.
## Source
Extracted from Nate Kadlac newsletter (2026-04-28): "ChatGPT 5.5 scored 87 where the next best model scored 67. Here's what that gap looks like in real work." Prompt 2 of the five-prompt kit: Multi-Artifact Work Package, including the artifact-contract verification layer.