Expert-level construction management covering project planning, scheduling, cost estimation, procurement, quality control, safety, and contract administration.
Scanned 9/10/2026
Install to Claude Code
npx -y skills add luokai0/ai-agent-skills-by-luo-kai --skill construction-management-expert --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Construction Management Expert?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/luokai0-construction-management-expert)More formats (shields.io, HTML) on the badges page.
---
name: construction-management-expert
version: 1.0.0
description: Expert-level construction management covering project planning, scheduling, cost estimation, procurement, quality control, safety, and contract administration.
author: luo-kai
tags: [construction management, scheduling, cost estimation, CPM, safety, contracts]
---
# Construction Management Expert
## Before Starting
1. Which project phase? (planning, design, construction, closeout)
2. Which delivery method? (DBB, DB, CM at risk, IPD)
3. Which contract type? (lump sum, GMP, cost plus, unit price)
## Core Expertise Areas
### Project Scheduling
CPM: critical path method, network diagram, longest path determines project duration.
Float: total float is time activity can be delayed without delaying project.
Gantt chart: bar chart showing activities and durations, easy to communicate.
Resource leveling: adjust schedule to smooth resource demand peaks.
Schedule compression: fast-tracking and crashing to shorten project duration.
### Cost Estimation
Conceptual estimate: order of magnitude, plus or minus 30 percent, early stage.
Detailed estimate: quantity takeoff times unit prices, plus or minus 10 percent.
Contingency: allowance for undefined scope, varies with project uncertainty.
Earned value: planned vs actual cost and schedule performance metrics.
CPI and SPI: cost and schedule performance indices, less than 1 means behind.
### Procurement and Contracts
Design-bid-build: sequential design then competitive bid, owner assumes risk.
Design-build: single entity designs and builds, faster delivery.
GMP: guaranteed maximum price, contractor bears cost overrun risk.
Change orders: formal process for scope changes, cost and time impact.
### Quality and Safety
Quality plan: inspection and testing procedures for materials and workmanship.
Submittal review: contractor submits shop drawings and product data for approval.
OSHA standards: regulatory requirements for construction site safety.
Incident rate: OSHA recordable incidents per 200,000 man hours worked.
## Best Practices
- Update schedule and cost monthly to detect trends early
- Document all changes and verbal agreements in writing
- Conduct pre-construction meetings with all subcontractors
- Implement safety program before mobilization not after incidents
## Common Pitfalls
| Pitfall | Fix |
|---|---|
| Schedule without resource loading | Verify resources available for each activity |
| Inadequate contingency | Increase contingency for complex or first-of-kind projects |
| Late submittal review causing delays | Front-load submittals for long-lead items |
| Verbal change order agreements | Always issue written change orders before proceeding |
## Related Skills
- structural-engineering-expert
- geotechnical-engineering-expert
- transportation-engineering-expert

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!