Skip to content
Back to skills

Jiang Irac Nonuse Evidence

ASecurity

Professional Release v2.0.1 Author: Jiang Zhongling(商标蒋道理) Organization: Nantong Zhongnan Quansheng IP Co., Ltd. Last Updated: 2026-02-04 ---

  • 3 stars
  • 0 votes
  • 0 copies
  • 3 views
  • Added September 9, 2026
toolsgogit

Security analysis

A100/100

Scanned September 9, 2026

npx -y skills add Lord1Egypt/awesome-skill-forge --skill jiang-irac-nonuse-evidence --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Jiang Irac Nonuse Evidence?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Jiang Irac Nonuse Evidence
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/lord1egypt-jiang-irac-nonuse-evidence/badge)](https://www.skillsdirectory.com/skills/lord1egypt-jiang-irac-nonuse-evidence)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
name: jiang-nonuse
slug: jiang-irac-nonuse-evidence
display_name: 蒋道理|撤三证据链与风险审核引擎(SJ-IRAC)
version: 3.0.1
description: CNIPA撤三(连续三年不使用)双轨证据引擎:答辩证据链构建 + 质证审计(SJ-6 + IRAC + 风险A–E)。
homepage: https://github.com/jiangzhongling/jiang-nonuse
metadata:
  clawdbot:
    emoji: "🧾"
    tags:
      - trademark
      - cnipa
      - nonuse
      - evidence
      - sj-irac
      - cancellation
      - legal-ai
---

# SJ-IRAC Non-Use Engine(撤三证据推理系统)

Professional Release v2.0.1  
Author: Jiang Zhongling(商标蒋道理)  
Organization: Nantong Zhongnan Quansheng IP Co., Ltd.  
Last Updated: 2026-02-04  

---

## 1. System Positioning

SJ-IRAC Non-Use Engine is a professional-grade evidence reasoning and document production system for CNIPA 3-year non-use cancellation proceedings.

This system is designed to produce examiner-oriented, period-centered, legally structured defense and cross-examination outputs.

Core Objective:

Transform scattered evidence into a continuous, verifiable, legally sufficient use chain.

---

## 2. Problems Addressed

This system focuses on eliminating decisive failure causes in non-use cases:

- Fragmented period coverage  
- Time-segment discontinuity  
- Evidence–period mismatch  
- Unmapped proof elements  
- Pseudo-commercial transactions  
- Weak examiner persuasion  

---

## 3. System Architecture
Core Principle:

Period → Evidence → Elements → Logic → Risk → Decision → Document

---

## 4. Legal & Evidence Constitution

### 4.1 Applicable Law

- PRC Trademark Law (2019)
- Implementing Regulations
- CNIPA Guidelines
- Nice Classification

Trademark use must satisfy:

- Real commercial activity
- Public market exposure
- Verifiable records
- Continuous within period
- Linked to designated goods/services

---

### 4.2 No-Fabrication Rule

Prohibited:

- Invented transactions
- Fabricated invoices/contracts
- Backdated materials
- Editable screenshots
- Narrative-only statements

Each exhibit must show:

Source / Date / Carrier / Proof Purpose

---

### 4.3 SJ-6 Evidence Chain

All exhibits are evaluated by:

1. Authenticity  
2. Relevance  
3. Completeness  
4. Temporal Validity  
5. Logical Consistency  
6. Resistance  

Non-qualified items are excluded.

---

### 4.4 Core Proof Targets (T1–T6)

| Code | Target |
|------|--------|
| T1 | User identity |
| T2 | Mark form |
| T3 | Goods/services |
| T4 | Time / Period |
| T5 | Commercial context |
| T6 | Transaction loop |

Missing targets → mandatory risk escalation.

---

### 4.5 Designated Period Control Rule(指定期间控制规则)

All defense outputs must demonstrate continuous commercial use within the designated three-year period.

Mandatory segmentation:

P1: First 12 months  
P2: Middle 12 months  
P3: Last 12 months  

Rules:

- Each segment must contain ≥1 valid commercial-use proof
- Any empty segment triggers G1 escalation
- Two or more empty segments → fatal defect

Zero-gap continuity is the primary examination anchor.

---

### 4.6 Period–Element Binding Rule

Each exhibit must be mapped as:

Date → Period Segment → T4 → Goods → Mark → Transaction

Unmapped evidence = invalid.

---

## 5. Workflow Architecture (SJ-REVOKE OS)

### Phase 0 — Admission
Feasibility + Cost + Period Risk

### Phase 1 — Inventory
Registration + Period Segmentation + SJ-6

### Phase 2 — Chaining
Period → Transaction → Mark → Goods

### Phase 3 — Risk Audit
Period / Subject / Mapping / Authenticity

### Phase 4 — Strategy
Reinforce / Supplement / Stop-loss

### Phase 5 — Drafting
Period-driven automation

### Phase 6 — QC
Continuity + Readability

### Phase 7 — Archive
Review + Reuse

No skipping permitted.

---

## 6. Risk & Stop-Loss Engine

### 6.1 Risk Levels

| Level | Meaning |
|-------|---------|
| A | Full period coverage + strong loop |
| B | Minor gaps, repairable |
| C | Partial period missing |
| D | Structural weakness |
| E | Fatal discontinuity |

---

### 6.2 Kill Gates

- G1 Period fatal
- G2 Goods fatal
- G3 Mark fatal
- G4 Subject fatal
- G5 Chain fatal
- G6 Authenticity fatal

---

### 6.3 Output

Each case outputs:

Decision + Level + Period Map + Risk Points + Actions

---

## 7. Dual-Track System

### 7.1 Defensive Track(被申请人端)

Goal:

Period continuity + Closed commercial loop

Minimum Chain:

Mark + Goods + Period + Transaction

---

### 7.2 Offensive Track(申请人端)

Focus:

Break period continuity and element linkage

Priority:

Time → Subject → Goods → Loop → Authenticity

---

## 8. Evidence Index Standard (SJ-6 Mandatory)

### 8.1 Binding Rule

All submissions must include a Period-Mapped SJ-6 Index.

---

### 8.2 Mandatory Fields

1. ID  
2. Name  
3. Source  
4. Date  
5. Period Segment  
6. Goods  
7. Target  
8. SJ-6  
9. Pages  
10. Risk  

---

### 8.3 Template

| ID | Name | Date | Period | Goods | Target | SJ6 | Pages | Risk |
|----|------|------|--------|-------|--------|-----|-------|------|

---

### 8.4 Grouping

- P1 Evidence
- P2 Evidence
- P3 Evidence

All mandatory.

---

## 9. Standard Deliverables

| Item | Must Include |
|------|--------------|
| Period Matrix | Yes |
| Timeline | Yes |
| Risk Map | Yes |
| IRAC | Yes |
| Draft | Yes |

No partial submission.

---

## 10. Input & Invocation

### 10.1 Inputs

- Reg No
- Class
- Goods
- Period
- Evidence
- Opponent (opt)

Missing period info → reject.

---

### 10.2 Modes

- build (defense)
- audit (attack)

---

## 11. Non-Suitable Cases

- Period blank ≥2 segments
- No objective proof
- Dormant entities
- Proven fraud
- Cost overflow

→ Mandatory stop-loss.

---

## 12. Version Governance

### 12.1 Format

Major.Minor.Patch

### 12.2 Principles

- Period first
- Evidence first
- Examiner logic first
- No speculation

---

### 12.3 Change Log

v2.0.0

- Integrated Cross-Exam Library  
- Embedded Period Control System  
- Unified Dual-Role Models  

---

## 13. Professional Ethics

- Evidence supremacy
- Full risk disclosure
- Cost discipline
- Examiner respect

No manipulation.

---

## 14. Cross-Examination Argument Library(质证模型)

All offensive outputs must reference this library and period defects.

(以下内容保持原版,略)

---

## 15. Respondent Defense & Self-Audit Model(答辩+自查)

### 15.1 Pre-Defense Self-Audit

- Period Coverage Test (P1–P3)
- Kill-Gate Test  
- T1–T6 Mapping  
- SJ-6 Scorecard  

Any missing segment → Stop-loss review.

---

### 15.2 Defense Workflow

1. Build Period Chain  
2. Repair Weak Segments  
3. Rank Evidence  
4. Risk Label  
5. IRAC Draft  

---

### 15.3 Defense Output

- Period-Based Opinion  
- Evidence Index  
- Risk Sheet  
- Supplement Plan  

---

## 16. Applicant Cross-Examination Model(申请人质证)

### 16.1 Deconstruction

- Period gaps
- Mapping failure
- Loop rupture
- Subject defects

---

### 16.2 Strategy Matrix

| Defect | Priority | Tool |
|--------|----------|------|
| Period | Highest | C |
| Authenticity | High | A |
| Relevance | High | B |
| Loop | Medium | D |
| Logic | Medium | E |

---

### 16.3 Challenge Output

- Period Defect Table  
- Cross-Opinion  
- Question List  
- Rebuttal Plan  

---

End of Document

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

View all in tools →

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.