Build transparent, defensible cost estimates and quotes as a ship's navigation officer.
TRIGGERS - Use when a ship's navigation officer needs a cost estimates & quotes for ship owners, crews and port authorities in ships' bridges.
Installs into .claude/skills of the current project.
Sponsors
SSkills DirectorySkills Directory
Is that skill safe to install?
SSkills DirectorySkills Directory
Know which skills are safe — weekly.
Are you the author of Ship Navigation Cost Estimate Quotes?
Add the live security badge to your README. It updates with every re-scan.
[](https://www.skillsdirectory.com/skills/lionelsimai-ship-navigation-cost-estimate-quotes)
---
name: ship-navigation-cost-estimate-quotes
description: |
Build transparent, defensible cost estimates and quotes as a ship's navigation officer.
TRIGGERS - Use when a ship's navigation officer needs a cost estimates & quotes for ship owners, crews and port authorities in ships' bridges.
category: Ship Navigation
license: MIT
version: 1.0
---
# Cost Estimates & Quotes — Ship Navigation
Build transparent, defensible cost estimates and quotes as a ship's navigation officer. The deliverable is an itemised estimate with assumptions, exclusions and validity terms.
This skill is written for a ship's navigation officer working with ship owners, crews and port authorities in ships' bridges.
## When to use
- You are a ship's navigation officer preparing, delivering or reviewing this part of your work in ships' bridges.
- You need a defensible, repeatable approach that produces an itemised estimate with assumptions, exclusions and validity terms.
- A colleague, auditor or client asks how this was done and what evidence supports it.
## Key Concepts
| Term | Meaning |
|------|---------|
| ECDIS | the electronic chart display and information system |
| Passage plan | the complete plan for a voyage from berth to berth |
| COLREGs | the international rules for preventing collisions at sea |
## Workflow
1. **Step 1** - Scope the work precisely from the assessment and voyage plans; list what is included and excluded
2. **Step 2** - Cost each element: professional time, ECDIS chart systems usage, materials, travel and third-party fees
3. **Step 3** - Add contingency proportionate to uncertainty — and say so openly rather than burying it, which protects against groundings and collisions
4. **Step 4** - Present the quote with options where genuine choices exist, and relate value to outcomes such as voyage plan compliance
5. **Step 5** - Record acceptance, variations and final costs against the estimate so future quotes get more accurate
## Profession-Specific Components
| Component | Details for Ship Navigation |
|-----------|-------------------------------|
| Core documentation | voyage plans; log books; chart corrections; watch records |
| Core tools & equipment | ECDIS chart systems; radar; gyro compasses; communication equipment |
| People involved | ship owners, crews and port authorities; the ship's navigation officer; colleagues and other services in ships' bridges |
| Primary record | voyage plans — keep it current, dated and attributable |
## Output Format
**Context:** [Situation in ships' bridges] | **Objective:** [What this must achieve] | **Audience:** [ship owners, crews and port authorities and other stakeholders]
The finished output is an itemised estimate with assumptions, exclusions and validity terms, structured as:
1. Summary of position and evidence
2. Detail, following the workflow above
3. Decisions, actions, owners and dates
4. Review point and escalation route
### Action Plan
1. **Immediate:** Confirm scope, consent and the evidence available in voyage plans.
2. **Short-term:** Complete the workflow steps and record outcomes against voyage plan compliance.
3. **Medium-term:** Review results, close actions, and update local procedures in ships' bridges.
## Success Metrics
| Metric | Target | Method |
|--------|--------|--------|
| voyage plan compliance | Agree a local target and track the trend | Measured from voyage plans and reviewed on a set cycle |
| near-miss reports | Agree a local target and track the trend | Measured from voyage plans and reviewed on a set cycle |
| chart correction currency | Agree a local target and track the trend | Measured from voyage plans and reviewed on a set cycle |
| watch handover quality | Agree a local target and track the trend | Measured from voyage plans and reviewed on a set cycle |
## Guardrails & Quality Checks
- Never let this happen: groundings and collisions.
- Never let this happen: outdated charts.
- Never let this happen: fatigue on watch.
- Work only within the competence and authority of a ship's navigation officer; escalate or refer anything beyond it.
- Record facts and observations, not speculation, and keep records confidential to ships' bridges's rules.
- Verify names, dates, figures and measurements twice before anything is issued or signed off.
- Use only real, verified information from the case in hand — never invent results, credentials or evidence.
## Example (illustrative)
A ship's navigation officer in ships' bridges applies this workflow for ship owners, crews and port authorities: they open
voyage plans, work through the five steps using ECDIS chart systems, and close by recording
the outcome against voyage plan compliance and agreeing the next review date. (Illustrative example only —
replace with the real details of the case in hand.)