Generate Budget

ASecurity

"Generates a detailed project budget (project-budget.xlsx) for Phase 2 —

  • 6 stars
  • 0 votes
  • 0 copies
  • 2 views
  • Added May 28, 2026
ai-agentsgo

Security analysis

A100/100

Pro scans all 3 files and shows the line behind each finding

Scanned May 28, 2026

npx -y skills add KirKruglov/claude-project-manager --skill generate-budget --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of Generate Budget?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for Generate Budget
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/kirkruglov-generate-budget/badge)](https://www.skillsdirectory.com/skills/kirkruglov-generate-budget)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: generate-budget
description: "Generates a detailed project budget (project-budget.xlsx) for Phase 2 —
  Planning, based on preliminary-estimate.xlsx and resource-plan.md. Produces a single
  baseline scenario structured by project phases and cost categories (team, infrastructure,
  GTM), with a contingency reserve as a separate line item. Covers task #9 of the project
  management agent. Mode B: agent prepares draft, PM reviews and approves.
  Triggers RU: «сформируй бюджет проекта», «подготовь детальный бюджет», «сделай бюджет
  по фазам», «бюджет проекта», «детализируй бюджет».
  Triggers EN: 'generate project budget', 'create budget', 'project budget',
  'detailed budget', 'budget by phase', 'budget breakdown'."
---

# Skill: generate-budget

Generates a detailed IT project budget during the planning phase (Phase 2). Reads the
preliminary estimate (preliminary-estimate.xlsx) and resource plan (resource-plan.md),
builds a line-item budget by phase and cost category. Output: `project-budget.xlsx` —
one baseline scenario with a contingency reserve. Mode B: agent prepares draft, PM reviews.

---

## Triggers

**Russian:** «сформируй бюджет проекта», «подготовь детальный бюджет», «сделай бюджет по фазам», «бюджет проекта», «детализируй бюджет»
**English:** "generate project budget", "create budget", "project budget", "detailed budget", "budget by phase", "budget breakdown"

---

## Language Detection

Determine the language of the user's request:
- If the request is in Russian → use templates with the `-ru` suffix, respond in Russian
- Otherwise → use templates with the `-en` suffix, respond in English

---

## Input

| Data | Required | Source |
|------|:--------:|--------|
| Preliminary estimate | yes | `01-initiation/preliminary-estimate.xlsx` |
| Resource plan | yes | `02-planning/resource-plan.md` |
| Project charter | no | `01-initiation/project-charter.md` |
| Hard constraints | no | `input/constraints.md` |
| Risk register | no | `01-initiation/risk-register.md` — for reserve calibration |

---

## Output

| File | Project path | Format |
|------|-------------|--------|
| `project-budget.xlsx` | `02-planning/` | .xlsx |

File structure — 3 sheets (Summary, Budget Detail, Resource Detail) — defined in
`templates/project-budget-{lang}.md`.

---

## Instructions

### Step 1 — Check Dependencies

**Guard-rail — check request type.**
If the request contains: WBS, task decomposition, man-hours per task, work breakdown by
assignee — respond:
"generate-budget produces a line-item budget by phase and cost category, not a detailed
WBS. For task decomposition use generate-project-plan — it builds a plan with tasks,
timelines, and assignees. Once the plan is approved, generate-budget will calculate the
financial side based on the resource plan."
Do not start the workflow. Do not check for files.

Check for required files:
1. `01-initiation/preliminary-estimate.xlsx`
2. `02-planning/resource-plan.md`

**If preliminary-estimate.xlsx is not found:**
Stop. Respond:
"A preliminary estimate is required to generate the budget. Run the generate-estimate
skill (task #4) — it will create preliminary-estimate.xlsx with baseline timeline and
cost data."

**If resource-plan.md is not found:**
Stop. Respond:
"A resource plan is required to generate the budget. Run the generate-resource-plan
skill (task #8) — it will create resource-plan.md with team composition, roles, and
rates by phase."

**If both files are found:** proceed to Step 2.

---

### Step 2 — Extract Data from Sources

**From preliminary-estimate.xlsx (realistic scenario):**
- Duration of each phase (weeks or months)
- Total costs by category (team, infrastructure, GTM)
- Assumptions recorded in the estimate
- Risk flags (if budget exceeds constraints)

**From resource-plan.md:**
- Team composition: roles, FTE allocation per phase
- Rates per role (if specified)
- Total person-months per phase

**From project-charter.md (if available):**
- Project name, PM, objectives
- Whether GTM is in scope — determines whether Section C is populated

**From risk-register.md (if available):**
- Number of HIGH-level risks → reserve calibration:
  - 0–2 HIGH risks: 10% reserve
  - 3–5 HIGH risks: 15% reserve
  - 6+ HIGH risks: 20% reserve, add PM warning

**From constraints.md (if available):**
- Hard budget ceiling — record in assumptions.

---

### Step 3 — Calculate Costs by Phase

**Section A: Team** (for each phase 1–6)

For each role:
```
Cost = FTE × Phase duration (months) × Rate ($/month)
```
- FTE and duration: from resource-plan.md
- Rates: from resource-plan.md → if not available, from preliminary-estimate.xlsx
- If rates are unavailable at role level in both resource-plan.md and preliminary-estimate.xlsx,
  and the estimate contains only aggregated team costs by phase: use the aggregate as
  Section A total for that phase without role breakdown. Record in assumptions:
  "Role-level rates unavailable — aggregated data from estimate used.
  Update rates in resource-plan.md for improved accuracy."
  In Sheet 3, column "Rate" — mark as "from estimate (aggregated)".

Phase total (team) = Σ costs of all roles in the phase.

**Section B: Infrastructure** (for each phase)

Take data from preliminary-estimate.xlsx (realistic scenario, infrastructure row by phase).
If data is unavailable — use default ranges from `templates/project-budget-{lang}.md`
(§ Default Infrastructure).

**Section C: Marketing/GTM** (for each phase)

- If GTM is in scope: take from preliminary-estimate.xlsx → Section C by phase.
- If GTM is not in scope: set to zero, add note "GTM is not in scope".

---

### Step 4 — Calculate Reserve and Totals

1. **Baseline budget** = Σ (Team + Infrastructure + GTM) across all phases.
2. **Contingency Reserve**:
   - Percentage: determined in Step 2 from the risk register (10%, 15%, or 20%).
   - If risk-register.md is unavailable: 10% default, add note "Risk register unavailable —
     standard 10% reserve applied".
   - Reserve = Baseline budget × %
3. **Grand Total** = Baseline budget + Reserve.
4. **Constraint check**: if Grand Total > Ceiling (from constraints.md):
   - Add risk flag to Summary: "Grand Total [$X] exceeds stated budget ceiling [$Y].
     Recommended: revise scope, reduce team, or phase the project funding."
   - Do not adjust numbers to fit the ceiling.

---

### Step 5 — Populate xlsx Sheets

Follow the schema in `templates/project-budget-{lang}.md`:

**Sheet 1 — Summary:**
- Header: project, PM, date, version
- Assumptions (minimum 3): calculation method, data sources, rates, GTM status, reserve %
- Phase summary table: A (Team) + B (Infra) + C (GTM) = Total per phase
- "Contingency Reserve" row: % and amount
- **Grand Total**
- Risk flag (if budget > ceiling)

**Sheet 2 — Budget Detail:**
- Rows: phase → category → cost line item
- Columns: Unit | Qty | Rate | Total
- Example row: "Phase 2 | Team | Product Manager | person-month | 2 | $5,000 | $10,000"

**Sheet 3 — Resource Detail:**
- Rows: role
- Columns: Phase 1 | Phase 2 | ... | Phase 6 | Total (p-m) | Rate | Total ($)
- Source: resource-plan.md

---

### Step 6 — Create xlsx and Save

1. Use the xlsx skill to create `project-budget.xlsx` following the template schema.
2. Save to `{project}/02-planning/project-budget.xlsx`.
3. Show in chat:
   - Confirmation: "Budget saved as project-budget.xlsx in 02-planning/."
   - Sheet 1 Summary as a markdown table.
   - List of assumptions.
   - Risk flags (if any).
   - Next step: "Budget is ready. Review rates and team composition. Once approved by PM,
     use generate-approval-letter to send it for stakeholder approval."
4. Write to `logs/log.md`: date, skill, file created, grand total, reserve %.
5. Update `project-state.md`: artifact `project-budget.xlsx` status → "draft".

---

## Templates

| File | Purpose |
|------|---------|
| `templates/project-budget-ru.md` | xlsx artifact schema (RU) |
| `templates/project-budget-en.md` | xlsx artifact schema (EN) |

---

## Dependencies

**Reads:**
- `01-initiation/preliminary-estimate.xlsx` — realistic scenario (team, infra, GTM by phase)
- `02-planning/resource-plan.md` — roles, FTE, rates by phase
- `01-initiation/project-charter.md` — project name, PM, GTM scope status
- `input/constraints.md` — budget ceiling (if any)
- `01-initiation/risk-register.md` — for reserve calibration

**Passes data to:**
- `monitor-progress` (#19) — budget deviation tracking
- `generate-change-impact` (#21) — scope change impact on budget
- `generate-plan-fact-report` (#29) — plan vs. actual budget

**Calls:**
- `xlsx skill` — to generate the .xlsx file

---

## Constraints

- Mode B: budget is a draft for PM review, not a final document
- Single scenario (baseline) — scenario analysis is done in generate-estimate, not here
- Does not update automatically on scope changes — re-run manually via generate-change-impact
- Does not build a detailed WBS or calculate task-level effort — use generate-project-plan
- Operates on one project per invocation
- If preliminary-estimate.xlsx is unavailable — skill does not run; no fallback

Files in this skill

  • SKILL.md9.2 KB
  • templates/project-budget-en.md4.3 KB
  • templates/project-budget-ru.md6.2 KB

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.