Build a feature end to end: spec-tdd → implement → test-unit → playwright → PR. Use when "build a feature" or "implement this end-to-end". Spec/TDD loop only → workflow-spec-tdd. One bug → workflow-fix-and-ship. Plan closure → complete-everything.
Scanned 9/11/2026
Install to Claude Code
npx -y skills add kensaurus/cursor-kenji --skill workflow-build-feature --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Workflow Build Feature?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/kensaurus-workflow-build-feature)More formats (shields.io, HTML) on the badges page.
---
name: workflow-build-feature
description: >
Build a feature end to end: spec-tdd → implement → test-unit →
playwright → PR. Use when "build a feature" or "implement this
end-to-end". Spec/TDD loop only → workflow-spec-tdd. One bug →
workflow-fix-and-ship. Plan closure → complete-everything.
license: MIT
---
# workflow-build-feature — End-to-End Feature Build
**Degree of freedom: MIXED.** How to implement Phase 2 `[HIGH freedom]`;
phase order and "no implementation before RED" `[LOW freedom — run exactly]`.
One command that runs the full feature loop. Don't skip phases — each gate
catches a class of defects the next phase can't.
## How to reason
1. **Contract** — what observable behavior is in / out of scope?
2. **Sequence** — which phase is next, and what would skipping it hide?
3. **Prove** — RED was real; GREEN and smoke cover the contract
4. **Handoff** — PR evidence is complete; no silent "looks done"
## Worked example
> **Contract:** "add a forgot-password link" — email reset, not a magic-link login rewrite.
> **Sequence:** spec + RED on the request-reset handler before any UI.
> **Prove:** RED failed on missing route; GREEN + Playwright submits the form and sees the check-email state.
> **Handoff:** PR links the spec, the RED/GREEN commands, and the smoke screenshot.
## Self-critique before reporting
- **Phases intact** — none of spec / RED / unit / smoke / PR were skipped
- **RED was real** — the failing test existed before implementation
- **Full-stack** — if data was touched, the migration was applied and verified
- **Right owner** — one named bug → `workflow-fix-and-ship`; spec loop only → `workflow-spec-tdd`
---
## Phase sequence [LOW freedom — run exactly]
```
1. SPEC → workflow-spec-tdd (contract, plan, RED test)
2. BUILD → implement against the spec (GREEN)
3. UNIT TEST → test-unit (edge cases, mocks, coverage)
4. SMOKE → test-playwright (drive the live app as a real user, fix pain points)
5. PR → workflow-pr (create PR with test evidence)
```
---
## Phase 1: Spec (read workflow-spec-tdd) [LOW freedom — run exactly]
> Read the `workflow-spec-tdd` skill and follow it.
Key outputs:
- Written spec (what it does, what it doesn't do, acceptance criteria)
- File-mapped implementation plan (which files to create/edit)
- A RED failing test that encodes the acceptance criteria
**Do not write implementation code until the spec and RED test exist.**
---
## Phase 2: Build [HIGH freedom]
Implement against the spec. Rules:
- One logical change per commit
- Match the file patterns already in the repo — no new abstractions unless the spec calls for them
- Full-stack: if the feature reads/writes data, verify the DB migration is applied before the frontend ships (see full-stack-ship-discipline rule)
---
## Phase 3: Unit tests (read test-unit) [LOW freedom — hand off]
> Read the `test-unit` skill and follow it.
Focus on:
- The new code's happy path, error paths, and edge cases
- Any shared utility functions introduced
---
## Phase 4: Smoke test (read test-playwright) [LOW freedom — hand off]
> Read the `test-playwright` skill and follow it.
Drive the live app through the new feature as a real user. Fix pain points inline (full-stack: UI + API + DB). Capture screenshots as evidence.
Before any browser action, apply `protocol-browser-anti-stall` rules.
---
## Phase 5: PR (read workflow-pr) [LOW freedom — hand off]
> Read the `workflow-pr` skill and follow it.
Include in the PR description:
- Link to the spec / acceptance criteria
- Screenshots or screen recording from Phase 4
- Migration notes if schema changed
---
## Done criteria [LOW freedom — do not skip]
- [ ] Spec written and agreed
- [ ] RED test exists and was failing before implementation
- [ ] Implementation makes test GREEN
- [ ] Unit tests cover happy path + at least one error path
- [ ] Smoke test drove the live app and found no blockers
- [ ] DB migration applied and verified (if applicable)
- [ ] PR open with description and evidence
Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.
No comments yet. Be the first to comment!