Skip to content
Back to skills

New Project

ASecurity

Turns a goal into a project the agents can run on their own — a short dialogue about the goal, a measurable success criterion, constraints and what is out of scope, then projects/<slug>/ with PROJECT.md, LOG.md, tasks/ and materials/, and a first plan plus first batch of tasks from the ceo role for the owner to approve. Use for "/new-project", "new project", "start a project", "I want to build X, break it down", "plan this for me".

  • 4 stars
  • 0 votes
  • 0 copies
  • 0 views
  • Added October 15, 2026
ai-agentsgobash

Security analysis

A100/100

Scanned October 15, 2026

npx -y skills add KamilMatysikAI/claude-agent-os --skill new-project --agent claude-code

Installs into .claude/skills of the current project.

Are you the author of New Project?

Add the live security badge to your README. It updates with every re-scan.

Security grade badge for New Project
[![Security: A — Skills Directory](https://www.skillsdirectory.com/api/skills/kamilmatysikai-new-project/badge)](https://www.skillsdirectory.com/skills/kamilmatysikai-new-project)

More formats (shields.io, HTML) on the badges page. Keep it an A: scan every change in CI with Pro.

Download with Pro
SKILL.md
---
name: new-project
description: Turns a goal into a project the agents can run on their own — a short dialogue about the goal, a measurable success criterion, constraints and what is out of scope, then projects/<slug>/ with PROJECT.md, LOG.md, tasks/ and materials/, and a first plan plus first batch of tasks from the ceo role for the owner to approve. Use for "/new-project", "new project", "start a project", "I want to build X, break it down", "plan this for me".
argument-hint: "[the idea in one sentence]"
allowed-tools: ["Read", "Write", "Edit", "Bash", "Glob", "Grep", "Agent", "AskUserQuestion"]
---

# /new-project — from an idea to a project that moves by itself

A project = goal + measurable success criterion + phases + tasks with one owner each. It lives in `projects/<slug>/`.

A one-off action ("call the supplier", "fix this typo") is **not** a project. Use `/create-task` for those. A project has a goal, phases and lives for weeks.

## Step 1: Pin down the goal (a dialogue, not a form)

Take as much as you can from what the owner already said and from `.claude/rules/context.md`. Ask **only** what is missing, at most 3 questions at once (AskUserQuestion when options make sense). Before any file is written, four things must be clear:

1. **Goal** — what should exist and why.
2. **Success criterion** — measurable and dated. "Grow sales" is not one; "10 paying customers by 2026-12-31" is. Without it the planner does not know when to stop. If the owner gives a threshold without a time unit ("20% margin"), ask over what period before writing it down.
3. **Constraints** — budget, deadline, people, tools, things that need approval.
4. **Out of scope** — what we are not doing. The cheapest way to keep a project from swelling. Ask when the scope sounds broad.

This is the one thing worth arguing about. **Do not create a project without a measurable success criterion.**

## Step 2: Create the structure

`<slug>`: kebab-case, ASCII only, short (`online-course`, `shop-relaunch`). If `projects/<slug>/` already exists, stop and ask: different slug, or work on the existing project with `/project <slug>`.

```
projects/<slug>/
  PROJECT.md     from projects/.templates/PROJECT.md
  PLAN.md        written by ceo in step 3
  LOG.md         from projects/.templates/LOG.md
  tasks/
  materials/
```

`PROJECT.md` frontmatter:

```yaml
---
slug: <slug>
name: <human-readable name>
status: active
owner_human: <owner_name from agentos.toml>
wip_limit: <[projects] wip_limit from agentos.toml, default 5>
created: YYYY-MM-DD
---
```

Sections: `## Goal`, `## Success criteria`, `## Constraints`, `## Out of scope`. Fill **every** section with content from the dialogue. No placeholders in the finished file. If a template is missing, write these sections yourself.

First `LOG.md` entry: `- YYYY-MM-DD HH:MM — project created. Goal: <one sentence>. Success: <criterion>.`

## Step 3: First plan (ceo)

Call the `ceo` agent (Agent tool, `subagent_type: "ceo"`) with this brief:

> Read `projects/<slug>/PROJECT.md` and `.claude/rules/context.md`. Write `projects/<slug>/PLAN.md` with 3–6 phases (each with an exit condition) and a "Risks" section. Create the first batch of tasks in `projects/<slug>/tasks/` from the templates in `projects/.templates/`, at most `wip_limit` active agent tasks. Agent tasks (`A-`) need `## Definition of done` and the evidence expected. Human tasks (`H-`) must take 15 minutes or less and start with a first step of 1–3 minutes. Every decision only the owner can make is its own `type: decision` task with a recommendation in `## For approval`, never a line in a list of questions. IDs: next ID = highest number in the whole `tasks/` directory + 1. Set `autonomy: ask` on every task in this first batch. Append one line to LOG.md.

If the Agent tool or the `ceo` role is not available, do the same yourself following `.claude/agents/ceo.md`.

## Step 4: The owner approves the first batch

The first batch always goes to the owner before anything runs. Show:
- phases, one line each;
- tasks: ID, owner, title, due date;
- what waits on the owner (H- tasks and decisions);
- the biggest risk.

On approval, switch the approved agent tasks to `autonomy: full`. Leave `autonomy: ask` on tasks that touch money, mass sends, publishing in the owner's name, or systems maintained by someone else. Rejected or changed tasks: edit them per the owner's comment, or set `status: cancelled` with the reason in `## Progress log`. Never delete task files. Log the approval in `LOG.md`.

Later batches are added by the ceo during reviews (`/project <slug> review`) without this approval step, still within `wip_limit`.

## Step 5: Refresh the views

```
{{engine}} guard
{{engine}} dashboard
```

`guard` creates any missing unblocking tasks; `dashboard` regenerates `projects/dashboard.md` and the generated block in `TODO.md`. If the command is unavailable or refused, say so in the report. Do not write the dashboard by hand.

Optional: for a high-stakes or hard-to-reverse project, suggest `/premortem <slug>` before work starts.

## Step 6: Report

Short, readable in 30 seconds: goal, success criterion, phases, first batch (who does what), what waits on the owner, the biggest risk.

## Rules

- No project without a measurable, dated success criterion.
- One owner per task: a role or `human`. Never "we".
- Human tasks: 15 minutes or less, first step 1–3 minutes. Longer human work gets split.
- Agent tasks: definition of done + required evidence.

Attribution

Is this your skill, or is something wrong with this listing? Request removal or report an issue. Author removals are honored within 72 hours.

Comments

Loading comments…

Newsletter

Get the weekly list of safe new skills, and the ones we pulled.