name: triage
description: Deadline management and capacity planning across epics and PRs. Use when the user runs /triage or wants deadline/capacity triage.
---
# /triage — Deadline Management & Capacity Planning
Classifies epics by deadline risk, reviews open PRs across repos, and creates bugs for failing CI.
## Usage
```
/triage
/triage --epic EPIC-7 # Triage a single epic
```
---
## Step 1 — Load All Epics
```bash
bd ready --type epic 2>/dev/null
bd ready --status in_progress --type epic 2>/dev/null
```
For each epic: `bd show <EPIC-ID>` to get due date, task count, completed count.
---
## Step 2 — Classify Each Epic
For each epic, calculate:
- **Total tasks**: child task count
- **Completed tasks**: closed child task count
- **Remaining tasks**: open + in-progress child tasks
- **Days until due**: (due date) - (today)
- **Velocity needed**: remaining tasks / days until due
Classify:
| Status | Criteria |
|--------|----------|
| **OVERDUE** | Due date has passed and epic is not closed |
| **AT RISK** | Due in <7 days with >30% tasks remaining, OR blocked tasks on critical path |
| **ON TRACK** | Due in ≥7 days with ≤30% remaining, OR no due date |
| **COMPLETE** | All tasks closed |
---
## Step 3 — Review Open PRs (all repos)
```bash
gh pr list --state open --json number,title,headRefName,statusCheckRollup,reviews,createdAt --limit 20
```
For each open PR, check:
- **CI status**: PASS / FAIL / PENDING
- **Review status**: approved / changes requested / awaiting
- **Age**: how many days old
Flag PRs that need attention:
- CI failing → create Beads bug (see Step 4)
- No review after 2+ days → flag for reviewer assignment
- Changes requested but no author response after 1+ days → flag
---
## Step 4 — Auto-Create Bugs for Failing PRs
For each PR with failing CI:
```bash
bd create \
--type bug \
--title "CI failing on PR #<n>: <pr title>" \
--repo <repo> \
--priority 1 \
--acceptance "CI passes on PR #<n>"
bd comments add <new-bug-id> "design: CI failure detected by /triage. PR: #<n>. Failures: <ci check names>"
```
**Priority policy:** keep **`high`** for merge-blocking CI on important branches; use **`critical`** only when production or security is directly at risk. When re-ranking work, use `.claude/skills/beads-priority-assignment/SKILL.md`.
Only create if a bug for this PR doesn't already exist:
```bash
bd ready | grep -i "PR #<n>" # Skip if already filed
```
---
## Step 5 — Capacity Summary
List all ready tasks by priority to help with planning:
```bash
bd ready | head -20
```
Count by priority:
- Critical: N tasks
- High: N tasks
- Medium: N tasks
- Low: N tasks
Identify any tasks blocked for more than 3 days — flag them as potential abandonment candidates.
---
## Output Format
```
## Triage Report — <date>
### Epics
🔴 OVERDUE (1)
EPIC-3 "User permissions system" due 2026-04-05 (6 days overdue)
8/12 tasks complete → 4 tasks remain
🟠 AT RISK (1)
EPIC-5 "Dashboard redesign" due 2026-04-18 (7 days)
3/10 tasks complete → 7 tasks remain (needs ~1/day)
⚠ T-67 blocked (dependency on T-54)
🟢 ON TRACK (2)
EPIC-7 "Settings page" due 2026-04-25 (14 days)
5/8 tasks complete → 3 tasks remain
EPIC-9 "API rate limiting" no due date
1/4 tasks complete
---
### PR Health (4 open)
#17 feat(auth): refresh tokens CI: PASS ✓ Approved (2 days old)
#18 fix(dash): pagination CI: FAIL ← created T-71 bug
#16 chore: update deps CI: PENDING (in progress)
#15 feat(settings): user prefs CI: PASS ✗ Awaiting review (3 days)
Action: Assign reviewer to #15
---
### Capacity (ready tasks)
Critical: 1 High: 5 Medium: 8 Low: 3
Longest-blocked:
T-49 "Migrate to v2 API" blocked 5 days → consider deferring
---
### Actions Created
T-71 [bug/high] CI failing on PR #18: fix dashboard pagination
```