Validate phase gate criteria with multi-agent review and generate pass/fail reports
Scanned 9/3/2026
Install to Claude Code
npx -y skills add jmagly/aiwg --skill gate-evaluation --agent claude-codeInstalls into .claude/skills of the current project.
Are you the author of Gate Evaluation?
Add the live security badge to your README — it updates automatically with every re-scan.
[](https://www.skillsdirectory.com/skills/jmagly-gate-evaluation-99d6b258)More formats (shields.io, HTML) on the badges page.
---
namespace: aiwg
name: gate-evaluation
platforms: [all]
description: Validate phase gate criteria with multi-agent review and generate pass/fail reports
---
<!-- AIWG-SKILL-CALLOUT -->
> **Skill access pattern (post-kernel-pivot, 2026.5+)**
>
> Skill names referenced in this document are AIWG skills, **not slash commands**. Most are not kernel-listed and cannot be invoked as `/skill-name` by the platform. Reach them via:
>
> ```bash
> aiwg discover "<capability>"
> aiwg show skill <name>
> ```
>
> Only kernel-listed skills (`aiwg-doctor`, `aiwg-refresh`, `aiwg-status`, `aiwg-help`, `use`, `steward`) are directly invokable as slash commands. See [skill-discovery rule](../../../addons/aiwg-utils/rules/skill-discovery.md).
# gate-evaluation
Validate phase gate criteria with multi-agent review and generate pass/fail reports.
## Triggers
Alternate expressions and non-obvious activations (primary phrases are matched automatically from the skill description):
- "LOM" / "LO check" → Inception exit gate (Lifecycle Objective Milestone)
- "LA" / "ABM" → Elaboration exit gate (Architecture Baseline Milestone)
- "IOC" → Construction exit gate (Initial Operational Capability)
- "PRM" → Transition exit gate (Product Release Milestone)
- "can we ship" → gate readiness shorthand
- "exit criteria for [phase]" → phase-specific gate check
## Purpose
This skill validates that all exit criteria for a phase are met before transitioning to the next phase. It orchestrates multiple validators to ensure comprehensive assessment.
## Behavior
When triggered, this skill:
1. **Identifies target gate**:
- Parse phase name or milestone
- Load gate criteria for that phase
- Map criteria to validator agents
2. **Inventories artifacts**:
- Check required artifacts exist
- Verify artifact status (baselined vs draft)
- Check version requirements
3. **Dispatches validators**:
- Launch parallel validators via `parallel-dispatch`
- Each validator checks their domain criteria
- Collect pass/fail per criterion
4. **Aggregates results**:
- Calculate gate score
- Identify blocking issues
- Generate recommendations
5. **Produces gate report**:
- Structured report with all criteria
- Clear pass/fail status
- Remediation guidance for failures
## Gate Definitions
### LOM - Lifecycle Objective Milestone (Inception Exit)
```yaml
gate: LOM
phase: inception
description: Validate problem, vision, and business case
criteria:
vision:
description: Vision document exists and is approved
artifacts: [".aiwg/requirements/vision.md"]
status: approved
validator: product-strategist
business_case:
description: Business case with ROI justification
artifacts: [".aiwg/management/business-case.md"]
status: approved
validator: executive-orchestrator
stakeholders:
description: Stakeholder agreement documented
artifacts: [".aiwg/management/stakeholder-agreement.md"]
status: approved
validator: project-manager
scope:
description: Initial scope and boundaries defined
artifacts: [".aiwg/requirements/scope.md"]
status: draft # can be draft at this stage
validator: requirements-analyst
risks:
description: Initial risk list with top 10 risks
artifacts: [".aiwg/risks/risk-register.md"]
min_risks: 10
validator: project-manager
architecture_sketch:
description: High-level architecture concept
artifacts: [".aiwg/architecture/architecture-sketch.md"]
status: draft
validator: architecture-designer
security_screening:
description: Initial security classification
artifacts: [".aiwg/security/data-classification.md"]
validator: security-architect
```
### ABM - Architecture Baseline Milestone (Elaboration Exit)
```yaml
gate: ABM
phase: elaboration
description: Architecture stable, major risks retired
criteria:
sad:
description: Software Architecture Document baselined
artifacts: [".aiwg/architecture/sad.md"]
status: baselined
validator: architecture-designer
adrs:
description: Key Architecture Decision Records
artifacts: [".aiwg/architecture/adr-*.md"]
min_count: 3
validator: architecture-designer
requirements_baseline:
description: Requirements documented and traced
artifacts:
- ".aiwg/requirements/use-cases/*.md"
- ".aiwg/requirements/supplementary-spec.md"
validator: requirements-analyst
risk_retirement:
description: Top risks retired or mitigated
artifacts: [".aiwg/risks/risk-register.md"]
check: risks_retired_percentage >= 60
validator: project-manager
test_strategy:
description: Test strategy defined
artifacts: [".aiwg/testing/test-strategy.md"]
status: approved
validator: test-architect
security_architecture:
description: Security architecture reviewed
artifacts: [".aiwg/security/threat-model.md"]
status: approved
validator: security-architect
```
### IOC - Initial Operational Capability (Construction Exit)
```yaml
gate: IOC
phase: construction
description: System functional, ready for deployment
criteria:
features_complete:
description: All planned features implemented
check: features_completion >= 100
validator: product-manager
tests_passing:
description: All automated tests pass
check: test_pass_rate >= 95
validator: test-architect
coverage:
description: Adequate test coverage
check: test_coverage >= 80
validator: test-architect
security_scan:
description: Security scan clean (no critical/high)
check: security_critical == 0 AND security_high == 0
validator: security-auditor
performance:
description: Performance meets NFRs
artifacts: [".aiwg/testing/performance-results.md"]
validator: performance-engineer
defects_triaged:
description: All defects triaged, no P0/P1 open
check: critical_defects == 0
validator: test-architect
deployment_plan:
description: Deployment plan approved
artifacts: [".aiwg/deployment/deployment-plan.md"]
status: approved
validator: deployment-manager
```
### PRM - Product Release Milestone (Transition Exit)
```yaml
gate: PRM
phase: transition
description: Product ready for production
criteria:
deployment_proven:
description: Deployment validated in staging
artifacts: [".aiwg/deployment/staging-validation.md"]
validator: devops-engineer
user_acceptance:
description: UAT passed
artifacts: [".aiwg/testing/uat-results.md"]
check: uat_pass_rate >= 100
validator: test-architect
support_ready:
description: Support team trained, runbooks ready
artifacts:
- ".aiwg/deployment/support-runbook.md"
- ".aiwg/deployment/training-completion.md"
validator: support-lead
rollback_plan:
description: Rollback procedure documented and tested
artifacts: [".aiwg/deployment/rollback-plan.md"]
validator: devops-engineer
monitoring:
description: Monitoring and alerting configured
artifacts: [".aiwg/deployment/monitoring-config.md"]
validator: reliability-engineer
compliance:
description: All compliance requirements met
validator: legal-liaison
```
## Validation Process
```
┌─────────────────────────────────────────────────────────┐
│ 1. LOAD GATE CRITERIA │
│ • Identify target gate (LOM, ABM, IOC, PRM) │
│ • Load criteria definitions │
│ • Map validators │
└─────────────────────────────────────────────────────────┘
│
▼
┌─────────────────────────────────────────────────────────┐
│ 2. ARTIFACT INVENTORY │
│ • Check each required artifact exists │
│ • Verify artifact status (draft/approved/baselined) │
│ • Record missing or invalid artifacts │
└─────────────────────────────────────────────────────────┘
│
▼
┌─────────────────────────────────────────────────────────┐
│ 3. PARALLEL VALIDATION │
│ ┌─────────────┐ ┌─────────────┐ ┌─────────────┐ │
│ │ architecture│ │ security │ │ test │ │
│ │ designer │ │ gatekeeper │ │ architect │ │
│ └──────┬──────┘ └──────┬──────┘ └──────┬──────┘ │
│ │ │ │ │
│ ▼ ▼ ▼ │
│ [arch criteria] [sec criteria] [test criteria] │
└─────────────────────────────────────────────────────────┘
│
▼
┌─────────────────────────────────────────────────────────┐
│ 4. AGGREGATE RESULTS │
│ • Count pass/fail per criterion │
│ • Calculate gate score (passed/total) │
│ • Identify blocking issues │
│ • Generate recommendations │
└─────────────────────────────────────────────────────────┘
│
▼
┌─────────────────────────────────────────────────────────┐
│ 5. GENERATE REPORT │
│ • Gate status: PASS / CONDITIONAL / FAIL │
│ • Detailed criteria results │
│ • Blocking issues list │
│ • Remediation guidance │
│ • Output: .aiwg/gates/{phase}-gate-report.md │
└─────────────────────────────────────────────────────────┘
```
## Gate Report Format
```markdown
# Gate Evaluation Report: ABM (Architecture Baseline)
**Date**: 2025-12-08
**Evaluator**: gate-evaluation skill
**Status**: CONDITIONAL
## Summary
| Metric | Value |
|--------|-------|
| Criteria Evaluated | 6 |
| Passed | 5 |
| Conditional | 1 |
| Failed | 0 |
| Gate Score | 83% |
## Criteria Results
### ✅ PASS: SAD Baselined
- Artifact: .aiwg/architecture/sad.md
- Status: baselined (v1.0.0)
- Validator: architecture-designer
- Notes: Comprehensive, all sections complete
### ✅ PASS: ADRs Complete
- Artifacts: 5 ADRs found
- Required: 3 minimum
- Validator: architecture-designer
### ⚠️ CONDITIONAL: Risk Retirement
- Current: 55% risks retired
- Required: 60%
- Validator: project-manager
- **Action Required**: Retire 2 more risks or document mitigation
### ✅ PASS: Test Strategy
- Artifact: .aiwg/testing/test-strategy.md
- Status: approved
- Validator: test-architect
### ✅ PASS: Security Architecture
- Artifact: .aiwg/security/threat-model.md
- Status: approved
- Validator: security-architect
### ✅ PASS: Requirements Baseline
- Artifacts: 12 use cases, supplementary spec
- Validator: requirements-analyst
## Blocking Issues
1. **Risk Retirement Short** (CONDITIONAL)
- Gap: 5% below threshold
- Remediation: Complete spike for RISK-007, document mitigation for RISK-012
## Recommendations
1. Address the conditional risk retirement before proceeding
2. Consider re-validating in 3-5 days after risk work
3. Gate can proceed with documented exception if stakeholder approves
## Next Steps
- [ ] Complete risk mitigation actions
- [ ] Re-run gate check: `/flow-gate-check elaboration`
- [ ] On PASS, proceed to: `flow-elaboration-to-construction`
```
## Usage Examples
### Check Elaboration Gate
```
User: "Can we transition to Construction?"
Skill evaluates ABM criteria:
- Checks SAD, ADRs, requirements
- Validates security architecture
- Verifies risk retirement
- Generates report
Output:
"ABM Gate Evaluation: CONDITIONAL
5/6 criteria passed
1 conditional: Risk retirement at 55% (need 60%)
Blocking:
- Retire 2 more risks or get exception approval
Recommendation: Address risks, re-check in 3-5 days"
```
### Quick Gate Status
```
User: "Gate check"
Skill detects current phase from project-awareness:
- Phase: Elaboration
- Runs ABM check
- Returns summary
```
## Integration
This skill uses:
- `parallel-dispatch`: For launching validator agents
- `project-awareness`: For detecting current phase
- `artifact-metadata`: For checking artifact status
## Gate Status Definitions
| Status | Meaning | Action |
|--------|---------|--------|
| PASS | All criteria met | Proceed to next phase |
| CONDITIONAL | Minor gaps, workarounds exist | Proceed with documented exceptions |
| FAIL | Blocking issues present | Must remediate before proceeding |
## Output Location
Gate reports: `.aiwg/gates/{phase}-gate-report.md`
Examples:
- `.aiwg/gates/inception-gate-report.md`
- `.aiwg/gates/elaboration-gate-report.md`
- `.aiwg/gates/construction-gate-report.md`
- `.aiwg/gates/transition-gate-report.md`
## References
- Gate criteria: docs/gate-criteria.md
- Phase transitions: flows/
- Validator agents: agents/